Search results

Jump to: navigation, search

Page title matches

  • The GridPP DIRAC SAM tests are run several times a day to verify that sites are able to run DIRA * a script on the GridPP web server is contacted to record that a SAM job has been submitted
    976 B (176 words) - 15:43, 21 October 2022

Page text matches

  • * [[Steve Lloyd SAM availability]] (summary graphs)
    8 KB (1,130 words) - 17:31, 17 April 2024
  • * On Tuesday 28th April we failed some CE SAM tests owing to a problem with Argus. However, this fixed itself before staf ... style="background-color: lightgrey;" | 52.0 || 100 || 93 || 100 || CMS CE SAM tests are failed at many sites due to an expired proxy.
    16 KB (1,794 words) - 12:58, 6 May 2015
  • * Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did no
    41 KB (5,018 words) - 14:09, 30 October 2019
  • * GridPP DIRAC SAM tests now have gridpp and vo.northgrid.ac.uk pages * MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
    40 KB (4,974 words) - 12:18, 11 April 2016
  • ...e=ticket_info&ticket_id=110482 110482] ('''Lancaster''' still suffering in SAM tests after upgrading to 1.8.9 too soon). ...o what I believe is an incompatibility with the latest DPM version and the SAM tests (and I wasn't rolling back to pass nagios tests!). Waiting on a new s
    184 KB (30,332 words) - 17:18, 16 December 2014
  • ...cg/WLCG_All_Sites_CMS_Feb2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_LHCB_Feb2014.pdf LHCb].(Reminder of ...mi-cream-nagios v. 1.1.1 - released with EMI 3 Update 14, released soon in SAM framework
    42 KB (5,176 words) - 11:12, 17 March 2014
  • ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb]. The EGI ava ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb].
    46 KB (5,930 words) - 18:40, 28 April 2014
  • ... Fail = failing SAM tests; Warn = warnings from SAM tests; Pass = passing SAM tests
    11 KB (1,661 words) - 12:47, 21 June 2019
  • Sam Skipsey (19 - 14.05.19)
    3 KB (389 words) - 14:55, 10 June 2019
  • * [[Random dCache failures in SAM]]
    5 KB (709 words) - 16:59, 3 January 2019
  • ...te" when DPM 1.8.7 comes out, but if that looks unlikely in the time frame SAM will reinstall the DPM rpms to simulate an upgrade. ...ke about this in the last few weeks- I think that he's in the same boat as Sam - technically up to date (just from the "wrong" repo).
    43 KB (5,533 words) - 08:50, 18 August 2014
  • ...MS Castor instance throughout the holiday period which has led to repeated SAM test failures.
    14 KB (1,476 words) - 14:02, 4 January 2017
  • ...ji@gridpp09 ~]$ find /tmp/mnt2/atlasscratchdisk/ | grep -v rucio | grep -v SAM | wc -l time rmdir /tmp/mnt2/atlasscratchdisk/!(rucio|SAM)
    7 KB (1,001 words) - 12:39, 24 March 2014
  • SAM test failures for CMS [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html
    2 KB (333 words) - 10:24, 28 July 2017
  • * At the end of last week CMSDisk became full. This affected the SAM SRM tests and hence CMS availability. ...t file access performance and have turned off "lazy-download". The CMS SRM SAM test success rate has improved since the Castor 2.1.16 upgrade on the 25th
    18 KB (1,971 words) - 14:03, 26 July 2017
  • ... Problems with SAM Nagios given (e.g. effort to upgrade, support). ARGO is SAM refactored (no heavy DB). -> Need a UK view on this as being pushed for EGI ** RFC proxies: Presentation at GDB. Checking experiment usage. SAM-Nagios fix easy. Default later this year.
    46 KB (5,846 words) - 07:57, 9 March 2015
  • ...cg/WLCG_All_Sites_CMS_Feb2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_LHCB_Feb2014.pdf LHCb].(Reminder of ...mi-cream-nagios v. 1.1.1 - released with EMI 3 Update 14, released soon in SAM framework
    48 KB (6,293 words) - 07:35, 31 March 2014
  • ...cg/WLCG_All_Sites_CMS_Feb2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201402/wlcg/WLCG_All_Sites_LHCB_Feb2014.pdf LHCb].(Reminder of ...mi-cream-nagios v. 1.1.1 - released with EMI 3 Update 14, released soon in SAM framework
    48 KB (6,293 words) - 07:36, 31 March 2014
  • ...mi-cream-nagios v. 1.1.1 - released with EMI 3 Update 14, released soon in SAM framework ** org.sam.WN-SoftVer - new probes check the $EMI_TARBALL_BASE/etc/emi-version file
    45 KB (5,701 words) - 09:21, 7 April 2014
  • ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb]. ** Discussion of the evolution of the SAM framework: https://indico.cern.ch/event/308266/contribution/4/material/0/0.
    52 KB (6,980 words) - 08:19, 15 April 2014
  • ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb]. The EGI ava ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb].
    45 KB (5,796 words) - 22:44, 21 April 2014
  • ** Update on SAM migration; ...g/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb]. The EGI ava
    41 KB (5,106 words) - 19:52, 5 May 2014
  • ...cg/WLCG_All_Sites_CMS_Apr2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201404/wlcg/WLCG_All_Sites_LHCB_Apr2014.pdf LHCb]. ** Update on SAM migration;
    37 KB (4,615 words) - 08:50, 12 May 2014
  • ...from last week. How many sites struggle to get useful information from the SAM results? ...cg/WLCG_All_Sites_CMS_Apr2014.pdf CMS] and [http://sam-reports.web.cern.ch/sam-reports/2014/201404/wlcg/WLCG_All_Sites_LHCB_Apr2014.pdf LHCb].
    46 KB (6,091 words) - 11:47, 19 May 2014
  • ...cs: CSIRT update; resource allocations; gfal2 replacing lcg_utils; central SAM update; EMI-2 decommissioning and update on GPGPUs. * CMS: SAM test for glexec critical on May 19th. Test for xrootd fallback goes critica
    41 KB (5,148 words) - 09:38, 2 June 2014
  • ...cs: CSIRT update; resource allocations; gfal2 replacing lcg_utils; central SAM update; EMI-2 decommissioning and update on GPGPUs. * CMS: SAM test for glexec critical on May 19th. Test for xrootd fallback goes critica
    41 KB (5,148 words) - 07:10, 9 June 2014
  • * The [http://sam-reports.web.cern.ch/sam-reports/2014/201405/wlcg/ May WLCG availability/reliability figures] have b ...rly for non-LHC VOs that use LFC. Conversely, started playing with GFAL2 (Sam).
    39 KB (4,952 words) - 19:40, 13 June 2014
  • * The [http://sam-reports.web.cern.ch/sam-reports/2014/201405/wlcg/ May WLCG availability/reliability figures] have b ...cs: CSIRT update; resource allocations; gfal2 replacing lcg_utils; central SAM update; EMI-2 decommissioning and update on GPGPUs.
    37 KB (4,591 words) - 09:54, 23 June 2014
  • * WMS decommissioning: Progress with SAM Condor validation. ARC-CE WN tests failing for some CMS sites (incl. Imperi ... broker and some results have been lost because of this. Mail from central sam team
    35 KB (4,220 words) - 09:11, 30 June 2014
  • * ''There was a review of currently run SAM tests (see talk) and [https://indico.egi.eu/indico/getFile.py/access?contri * WMS decommissioning: Progress with SAM Condor validation. ARC-CE WN tests failing for some CMS sites (incl. Imperi
    43 KB (5,584 words) - 12:52, 7 July 2014
  • '''UKI-SCOTGRID-GLASGOW''': For DPM, Sam is trying out new versions of DPM but that’s working with the product tea ...do test stuff from time to time. I recently tested pre-release version of SAM-Nagios (SR report [https://documents.egi.eu/public/ShowDocument?docid=2355
    8 KB (1,155 words) - 11:09, 13 March 2015
  • * WMS decommissioning: Progress with SAM Condor validation. ARC-CE WN tests failing for some CMS sites (incl. Imperi * Migration of Central SAM services: Note to make sure that if being reinstalled that patches are appl
    39 KB (4,936 words) - 09:03, 21 July 2014
  • * WMS decommissioning: Progress with SAM Condor validation. ARC-CE WN tests failing for some CMS sites (incl. Imperi * Migration of Central SAM services: Note to make sure that if being reinstalled that patches are appl
    39 KB (4,833 words) - 10:09, 28 July 2014
  • * SHA-2: Intro new VOMS servers. Testing infrastructure with preprod SAM. Some good; many failures due to simple configuration issues of CREAM and/o * WMS decommissioning: Work ongoing to improve SAM Condor probe jobs lifecycle. End of September or October.
    42 KB (5,191 words) - 14:37, 2 August 2014
  • | Sam Skipsey | Sam to update ticket status - still open (4/10/11). Closed by December.
    33 KB (5,297 words) - 10:13, 15 November 2017
  • ** SAM probes Task Force has been setup to assess the support status of probes and * SHA-2: Intro new VOMS servers. Testing infrastructure with preprod SAM. Some good; many failures due to simple configuration issues of CREAM and/o
    41 KB (5,255 words) - 08:52, 18 August 2014
  • ** SAM probes Task Force has been setup to assess the support status of probes and * SHA-2: Intro new VOMS servers. Testing infrastructure with preprod SAM. Some good; many failures due to simple configuration issues of CREAM and/o
    42 KB (5,304 words) - 10:39, 25 August 2014
  • * Load issue on AtlasScratchDisk last weekend causing failing SAM / Functional tests and poor performance.
    2 KB (338 words) - 15:06, 29 August 2014
  • * Our thanks to Sam and Mohit, Year in Industry students, who have now finished. There will be ** SAM probes Task Force has been setup to assess the support status of probes and
    42 KB (5,358 words) - 10:48, 1 September 2014
  • ** [http://sam-reports.web.cern.ch/sam-reports/2014/201408/wlcg/WLCG_All_Sites_ALICE_Aug2014.pdf ALICE]: All good. ** [http://sam-reports.web.cern.ch/sam-reports/2014/201408/wlcg/WLCG_All_Sites_ATLAS_Aug2014.pdf ATLAS]: Durham (8
    46 KB (6,062 words) - 10:07, 15 September 2014
  • * There were problems with the SAM tests on the CEs from Tuesday through to Wednesday. Believed due to a probl
    13 KB (1,429 words) - 10:06, 8 October 2014
  • ...broadcast/archive/id/1190 Broadcast sent]. Deadline 15th September. Switch SAM. Then expt. job and data systems. 88->55 tickets. * WMS decommissioning: Condor-based SAM probes due 1st October.
    48 KB (6,422 words) - 08:45, 23 September 2014
  • ** SAM probe changes for ops have been agreed (e.g. removing the FTS2 tests); * T0: Investigating use cases for AFS-UI; from October will use EGI WMS for SAM tests; plus5:batch5 still used by users to build binaries under SLC5; KB [h
    49 KB (6,449 words) - 10:22, 29 September 2014
  • * We have received the WLCG T2 R/A figures [http://wlcg-sam.cern.ch/reports/2017/201702/wlcg/ for February]. ** [http://wlcg-sam.cern.ch/reports/2017/201702/wlcg/WLCG_All_Sites_ALICE_Feb2017.pdf ALICE]
    42 KB (5,079 words) - 18:37, 19 March 2017
  • WLCG Nagios is replacement of old centralized SAM system to monitor WLCG grid infrastructure. It enabled regional entities, s ...nder EGI and current home page of WLCG Nagios is [https://wiki.egi.eu/wiki/SAM here]. Apart from Nagios, main component of WLCG nagios are
    10 KB (1,644 words) - 09:44, 14 June 2018
  • ** SAM probe changes for ops have been agreed (e.g. removing the FTS2 tests); * T0: Investigating use cases for AFS-UI; from October will use EGI WMS for SAM tests; plus5:batch5 still used by users to build binaries under SLC5; KB [h
    41 KB (5,169 words) - 09:22, 6 October 2014
  • ...k there was a problem with one of the site BDIIs that caused a problem for SAM tests against CEs through Tuesday/Wednesday last week (20/9 - 01/10).
    15 KB (1,740 words) - 10:50, 15 October 2014
  • ** SAM probe changes for ops have been agreed (e.g. removing the FTS2 tests); * WMS decommissioning: with the deployment of the Condor SAM probes nothing is using WMS anymore. Machines off. WG will end.
    46 KB (5,940 words) - 04:40, 13 October 2014
  • The GridPP DIRAC SAM tests are run several times a day to verify that sites are able to run DIRA * a script on the GridPP web server is contacted to record that a SAM job has been submitted
    976 B (176 words) - 15:43, 21 October 2022
  • * WMS decommissioning: with the deployment of the Condor SAM probes nothing is using WMS anymore. Machines off. WG will end.
    39 KB (4,711 words) - 03:39, 21 October 2014
  • * The following ROC profile SAM tests have been removed: ch.cern.FTS-ChannelList; ch.cern.FTS-InfoSites and * IPv6: All T1s should join HEPiX IPv6 WG. Dual-stack SAM to be put in place. Deploy PS in dualstack in 2015. OSG infrastructure read
    40 KB (4,976 words) - 10:25, 27 October 2014
  • * Non LHC Nagios /Sam tests failing due to Kashif ( @Oxford) DN being used by all , and failing
    2 KB (355 words) - 10:19, 3 November 2014
  • .../wlcg/WLCG_All_Sites_CMS_Oct2014.pdf CMS]. [http://sam-reports.web.cern.ch/sam-reports/2014/201410/wlcg/WLCG_All_Sites_LHCB_Oct2014.pdf LHCb]. * The following ROC profile SAM tests have been removed: ch.cern.FTS-ChannelList; ch.cern.FTS-InfoSites and
    42 KB (5,228 words) - 10:37, 4 November 2014
  • * [[Random DPM errors in SAM]] - Collection of intermittent failures seen in SAM - this is older but maybe still useful {{KeyDocs|responsible=Sam Skipsey|reviewdate=2017-07-18|accuratedate=2014-11-11|percentage=80}}
    5 KB (882 words) - 10:18, 1 August 2018
  • .../wlcg/WLCG_All_Sites_CMS_Oct2014.pdf CMS]. [http://sam-reports.web.cern.ch/sam-reports/2014/201410/wlcg/WLCG_All_Sites_LHCB_Oct2014.pdf LHCb]. * The following ROC profile SAM tests have been removed: ch.cern.FTS-ChannelList; ch.cern.FTS-InfoSites and
    48 KB (6,138 words) - 09:19, 10 November 2014
  • ... This is triggered by the numbers of reads using xroot and has led to some SAM test failures.
    13 KB (1,376 words) - 15:37, 12 November 2014
  • ** EGI.eu OLA covers: Site Availability/Reliability, top-BDII, SAM, support quality, ROD performance. NGI gets a ticket if non-conformant. ** SAM update 23 will include new FTS probes and gstat probes replaced by GLUE2 va
    39 KB (4,698 words) - 18:46, 16 November 2014
  • ... This is triggered by the numbers of reads using xroot and has led to some SAM test failures.
    12 KB (1,302 words) - 14:14, 19 November 2014
  • * SRM SAM test failures on LHCB/CMS and callout on pluto. Some deadlocking on dbases,
    2 KB (265 words) - 14:14, 21 November 2014
  • ... This is triggered by the numbers of reads using xroot and has led to some SAM test failures.
    14 KB (1,484 words) - 15:28, 26 November 2014
  • * Last week's SRM SAM test failures on LHCB/CMS and callout on pluto have been explained, and are
    2 KB (364 words) - 15:03, 2 December 2014
  • * SAM/ARGO update: SAM update-23 progressing (probes to UMD; SAM-GridMon removed..) and in staged rollout. ops VOMS config changes: old ops ...me tests were removed from CE and probes are moved to UMD3 repository from SAM repository.
    41 KB (5,123 words) - 10:02, 1 December 2014
  • * SAM/ARGO update: SAM update-23 progressing (probes to UMD; SAM-GridMon removed..) and in staged rollout. ops VOMS config changes: old ops ...o what I believe is an incompatibility with the latest DPM version and the SAM tests (and I wasn't rolling back to pass nagios tests!). Waiting on a new s
    50 KB (6,536 words) - 00:08, 7 December 2014
  • * [http://wlcg-sam.cern.ch/reports/2014/201411/wlcg/ SAM3 results for November] have been circ ** ALICE: High activity. Progressing ARC CE SAM tests.
    40 KB (4,992 words) - 19:01, 15 December 2014
  • ... reported last week continued into this reporting period with intermittent SAM test failures. The problem has been mitigated: The particular LHCb workflow
    14 KB (1,514 words) - 17:14, 21 January 2015
  • An atlas ticket about http support at Glasgow's endpoints. Sam noticed that this is likely a problem with some older dmlite versions on so ...larly with a view of these tests: http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg Any news? On hold (6/11)
    117 KB (18,736 words) - 11:05, 4 January 2016
  • * RAL Ops SAM tests (lcgccvm02) have been fixed (initially causing false positives) - ini
    3 KB (386 words) - 11:33, 19 December 2014
  • ...od on 12th December due to a water leak in the building. This impacted the SAM tests. * [http://wlcg-sam.cern.ch/reports/2014/201411/wlcg/ SAM3 results for November] have been circ
    44 KB (5,642 words) - 20:59, 21 December 2014
  • *SAM OPS ...ses in PY5. Failover improved. SSLv3 disabled. SAM/ARGO: ARGO will replace SAM in 2015 (for start EGI-Engage): enhance customisation; better metric store.
    46 KB (5,865 words) - 23:34, 26 December 2014
  • *SAM OPS ...ses in PY5. Failover improved. SSLv3 disabled. SAM/ARGO: ARGO will replace SAM in 2015 (for start EGI-Engage): enhance customisation; better metric store.
    47 KB (5,942 words) - 15:24, 8 January 2015
  • * The draft [http://wlcg-sam.cern.ch/reports/2014/201412/wlcg/ December Tier-2 reliability/availability *SAM OPS
    44 KB (5,523 words) - 22:20, 18 January 2015
  • * The draft [http://wlcg-sam.cern.ch/reports/2014/201412/wlcg/ December Tier-2 reliability/availability *SAM OPS
    44 KB (5,505 words) - 10:46, 26 January 2015
  • * The draft [http://wlcg-sam.cern.ch/reports/2014/201412/wlcg/ December Tier-2 reliability/availability ...me tests were removed from CE and probes are moved to UMD3 repository from SAM repository.
    45 KB (5,609 words) - 09:48, 2 February 2015
  • Amendments: Sam Skipsey, University of Glasgow. Wahid Bhimji, University of Edinburgh
    13 KB (1,952 words) - 16:03, 3 February 2015
  • ...me tests were removed from CE and probes are moved to UMD3 repository from SAM repository. org.sam.WN-RepDel
    46 KB (5,740 words) - 12:49, 8 February 2015
  • * SAM tests for the ARC CEs for CMS failed during 3-5 February - the problem was
    13 KB (1,290 words) - 11:23, 11 February 2015
  • .../wlcg/WLCG_All_Sites_CMS_Jan2015.pdf CMS]; [http://sam-reports.web.cern.ch/sam-reports/2015/201501/wlcg/WLCG_All_Sites_LHCb_Jan2015.pdf LHCb]. ...me tests were removed from CE and probes are moved to UMD3 repository from SAM repository.
    48 KB (6,051 words) - 10:02, 16 February 2015
  • ...orts/2015/201502/wlcg/WLCG_All_Sites_CMS_Feb2015.pdf CMS] and [http://wlcg-sam.cern.ch/reports/2015/201502/wlcg/WLCG_All_Sites_LHCB_Feb2015.pdf LHCb]. .../372875/ http deployment task force] has been approved and will meet soon. Sam S will represent GridPP sites.
    43 KB (5,265 words) - 10:52, 6 April 2015
  • ...[http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=view GridPP DIRAC SAM] monitoring can be used to see the current state of many of these sites. Th
    3 KB (378 words) - 09:57, 27 June 2017
  • ... Problems with SAM Nagios given (e.g. effort to upgrade, support). ARGO is SAM refactored (no heavy DB). -> Need a UK view on this as being pushed for EGI ** RFC proxies: Presentation at GDB. Checking experiment usage. SAM-Nagios fix easy. Default later this year.
    48 KB (6,074 words) - 10:36, 16 March 2015
  • ...orts/2015/201502/wlcg/WLCG_All_Sites_CMS_Feb2015.pdf CMS] and [http://wlcg-sam.cern.ch/reports/2015/201502/wlcg/WLCG_All_Sites_LHCB_Feb2015.pdf LHCb]. .../372875/ http deployment task force] has been approved and will meet soon. Sam S will represent GridPP sites.
    44 KB (5,438 words) - 08:48, 23 March 2015
  • ...orts/2015/201502/wlcg/WLCG_All_Sites_CMS_Feb2015.pdf CMS] and [http://wlcg-sam.cern.ch/reports/2015/201502/wlcg/WLCG_All_Sites_LHCB_Feb2015.pdf LHCb]. .../372875/ http deployment task force] has been approved and will meet soon. Sam S will represent GridPP sites.
    44 KB (5,487 words) - 08:53, 30 March 2015
  • ...orts/2015/201502/wlcg/WLCG_All_Sites_CMS_Feb2015.pdf CMS] and [http://wlcg-sam.cern.ch/reports/2015/201502/wlcg/WLCG_All_Sites_LHCB_Feb2015.pdf LHCb]. ...usy. Problems with frontier/squid infrastructure. Scheduling (conflict) of SAM tests. T1 tape stage tests done.
    44 KB (5,515 words) - 13:09, 12 April 2015
  • ** [http://wlcg-sam.cern.ch/reports/2015/201503/wlcg/WLCG_All_Sites_ALICE_Mar2015.pdf ALICE.] N ** [http://wlcg-sam.cern.ch/reports/2015/201503/wlcg/WLCG_All_Sites_ATLAS_Mar2015.pdf ATLAS.]
    49 KB (6,238 words) - 08:07, 18 April 2015
  • ** [http://wlcg-sam.cern.ch/reports/2015/201503/wlcg/WLCG_All_Sites_ALICE_Mar2015.pdf ALICE.] N ** [http://wlcg-sam.cern.ch/reports/2015/201503/wlcg/WLCG_All_Sites_ATLAS_Mar2015.pdf ATLAS.]
    43 KB (5,339 words) - 06:42, 27 April 2015
  • |GridPP DIRAC SAM tests for skatelescope.eu run at DataCentred. Manchester storage associated |QMUL joins Manchester, Imperial, Cambridge in passing SAM tests and providing storage. More volunteer sites welcome: need 10-20TB on
    19 KB (3,141 words) - 12:14, 27 April 2020
  • * RFC proxies: RFC proxy readiness to be followed up per experiment. SAM-Nagios proxy renewal code fix to support RFC proxies. * MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
    46 KB (5,803 words) - 11:48, 16 May 2015
  • * RFC proxies: RFC proxy readiness to be followed up per experiment. SAM-Nagios proxy renewal code fix to support RFC proxies. * MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
    46 KB (5,732 words) - 18:32, 23 May 2015
  • ** LIGO issue looked like DNS resolution issue. Sam following up this week. Noted DIRAC errors truncated. Suggested trying non * RFC proxies: SAM-Nagios refresh_proxy probe fixed in UMD-3. Once sites check ok, central ser
    43 KB (5,271 words) - 22:18, 31 May 2015
  • ** LIGO issue looked like DNS resolution issue. Sam following up this week. Noted DIRAC errors truncated. Suggested trying non * RFC proxies: SAM-Nagios refresh_proxy probe fixed in UMD-3. Once sites check ok, central ser
    43 KB (5,271 words) - 13:02, 6 June 2015
  • * [http://wlcg-sam.cern.ch/reports/2015/201505/wlcg/Tier-2 A/R for May]: ** [http://wlcg-sam.cern.ch/reports/2015/201505/wlcg/WLCG_All_Sites_ALICE_May2015.pdf ALICE:]
    43 KB (5,391 words) - 15:50, 14 June 2015
  • * [http://wlcg-sam.cern.ch/reports/2015/201505/wlcg/Tier-2 A/R for May]: ** [http://wlcg-sam.cern.ch/reports/2015/201505/wlcg/WLCG_All_Sites_ALICE_May2015.pdf ALICE:]
    45 KB (5,632 words) - 13:32, 21 June 2015
  • ..., OIM and BDII). LHCb uses for CE discovery. CMS no clear usage. ALICE for SAM and CERN IT C5 reports. * RFC proxies: SAM - okay now for ALICE. CMS PhEDEx instances being switched.
    45 KB (5,792 words) - 21:55, 28 June 2015
  • ...; DDM-srm-Get and DDM-srm-Put.From 1st July these will move to http://wlcg-sam-atlas.cern.ch/. ..., OIM and BDII). LHCb uses for CE discovery. CMS no clear usage. ALICE for SAM and CERN IT C5 reports.
    45 KB (5,742 words) - 21:15, 5 July 2015
  • ... lightgrey;" | 0 || 100 || 100 || 100 || 100 || 100 || 100 || Problem with SAM monitoring of ARC-CEs. ... lightgrey;" | 0 || 100 || 100 || 100 || 100 || 100 || 100 || Problem with SAM monitoring of ARC-CEs.
    13 KB (1,329 words) - 09:31, 8 July 2015
  • * The [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/ draft T2 reliability and availability fig ** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_ALICE_Jun2015.pdf ALICE]: A
    46 KB (5,777 words) - 09:41, 20 July 2015
  • * The [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/ draft T2 reliability and availability fig ** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_ALICE_Jun2015.pdf ALICE]: A
    47 KB (5,972 words) - 08:49, 27 July 2015
  • |Vo and SAM-Nagios are running SL5
    2 KB (318 words) - 15:36, 29 March 2016
  • ** [http://wlcg-sam.cern.ch/reports/2015/201507/wlcg/WLCG_All_Sites_ALICE_Jul2015.pdf ALICE]. A ** [http://wlcg-sam.cern.ch/reports/2015/201507/wlcg/WLCG_All_Sites_ATLAS_Jul2015.pdf ATLAS]. A
    52 KB (6,730 words) - 22:58, 9 August 2015
  • ** [http://wlcg-sam.cern.ch/reports/2015/201507/wlcg/WLCG_All_Sites_ALICE_Jul2015.pdf ALICE]. A ** [http://wlcg-sam.cern.ch/reports/2015/201507/wlcg/WLCG_All_Sites_ATLAS_Jul2015.pdf ATLAS]. A
    52 KB (6,730 words) - 23:00, 9 August 2015

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)