Operations News

  • xrootd security advisory with FAX component within xrootd
  • SL6 Headnode work - tested in vcert, next test in prepord including stress testing
  • Draining going well - 40TB in a week, ETA finish in c15 weeks for draining of 1Gb systems


Operations Problems

  • gdss720 / gdss763 are both drained, out of production and currently being worked on by Fabric team
  • gdss659 had been previously drained and is currently undergoing final tests before returning to production
  • A few SUM test failures this week across a number of VOs
  • Non LHC Nagios /Sam tests failing due to Kashif ( @Oxford) DN being used by all , and failing due to SRM not being voms aware.


Blocking Issues

  • grid ftp bug in SL6 - stops any globus copy if a client is using a particular library. This is a show stopper for SL6 on disk server.
  • webdav access for LHCb requires firewall changes by Fabric


Planned, Scheduled and Cancelled Interventions

  • A Tier 1 Database cleanup is planned so as to eliminate a number of excess tables and other entities left over from previous CASTOR versions. This will be change-controlled in the near future.


Advanced Planning

Tasks

  • Plan to ensure PreProd represents production in terms of hardware generation are underway
  • Possible future upgrade to CASTOR 2.1.14-15 post christmas
  • Switch from admin machines: lcgccvm02 to lcgcadm05
  • New VM configured to run against the standby CASTOR database will be created as a front-end for dark data etc queries.
  • Correct partitioning alignment issue (3rd CASTOR partition) on new castor disk servers

Interventions

Actions

  • Brian to talk to atlas re periods of stress and if these are reflected in poor service at atlas. If not then possibly just leave xroot weighting as it is.
  • Brian - check atlas disk pledge with 720 / 763 out ..
  • Rob - document findings of investigations relating to high wait IO on atlas
  • Rob - to document preprod SL6 upgrade on wiki as he goes
  • Bruno to present changes to castor quattor / doc
  • CIP into instructions for castor failover


Staffing

  • Castor on Call person
    • Chris


  • Staff absence/out of the office:
    • Bruno all week
    • Chris Thurs (poss half day TBC)
    • Matt Monday