Operations Bulletin 291012

From GridPP Wiki
Revision as of 11:58, 29 October 2012 by Jeremy coles (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Bulletin archive


Week commencing 22nd October 2012
Task Areas
General updates

Tuesday 23rd October

  • Site contact lists have been added to the list wlcg-operations at cern.ch to improve the transmission of WLCG ops information. There will be an attempt to minimise 'noise'. Please let Jeremy know of any concerns to be fed back to the WLCG ops team.
  • The status of EMI releases was last given in this update.
  • When decommissioning services please remember to check the EGI procedures for steps.
  • Alessandra created this useful table to collate plans. Thank you to everyone for keeping it updated! Just 3 sites have yet to share their plans....
  • The ROD team have been given extended access to the Security Dashboard reports to help chase sites on middleware issues spotted by EGI.
  • It has been proposed that from 1st November, lcg-ce tests are removed from the three SAM profiles: ROC [1], ROC_OPERATORS [2] (the list of tests generating alarms into the operations portal), and ROC_CRITICAL [3] (the list of tests generating results that are taken into account for Availability/Reliability reports). This should not affect any UK sites as none are among the 29 services found by EGI as still active on gLite 3.1.
  • The Nagios tests need updating for SL6 as some issues have been found.
  • The final WLCG Tier-2 availability/reliability report for September 2012 is now available.


Monday 15th October

  • There is a new nagios test and through the alarms that come with it, sites and NGIs get an early warning that a site is about to fail the OLA requirements. This new test has recently been implemented in the Dashboard, raising alarms named egi.eu.lowAvailability. Availability alarms are to be handled by RODs in the Dashboard, and in the future are going to replace the Availability/Reliability tickets that the COD submits to underperforming NGI sites. These alarms are a warning for NGIs informing about poor performance of sites within the last 30 days.
  • HEPiX is this week. See talks via the agenda page or join via Vidyo
  • The status of the EMI-WN testing in captured here.
  • SAM test consequence of removing ATLASGROUPDISK Space tokens.
  • The official GDB meeting minutes from the October meeting are now available.

Wednesday 10th October


Tuesday 9th October

  • There is a GDB this week. Please look at the agenda.
  • gLite 3.2 CEs became unsupported at the end of September. Sites need to move fully to EMI CEs this month.
  • GridPP travel requests can now be done online via the web based approval system.


Tier-1 - Status Page

Tuesday 23rd October

  • Castor 2.1.12 update for CMS completed OK last Tuesday (16th). LHCb upgrade ongoing this morning.
  • Replacement of glite CREAM CEs with EMI CREAM CEs this morning.
  • Investigating some asymetric network links via perfsonar. One Tier1 (CNAF) fixed as it was routing packets to us via general network. Others under investigation.
  • Two of the WMSs (WMS01 & WMS03) have been upgraded to the EMI version. The other planned for this week.
  • Continuing test of hyperthreading. Plan to implement after CE updates completed.
  • Continue with ten EMI-2 SL-5 worker nodes in normal production.
  • Test instance of FTS version 3 now available. Non-LHC VOs that use the existing service have been enabled on it and looking for one of the VOs to test.
Storage & Data Management - Agendas/Minutes

Wednesday 10th October

  • DPM EMI upgrades:
    • 9 sites need to upgrade from gLite 3.2
  • QMUL asking for FTS settings to be increased to fully test Network link.
  • Initial discussion on how Brunel might upgrade it's SE and decommission is old SE
  • Classic SE support , both for new SEs and plan to remove current publishing of classic SE endpoint


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Friday 28th September

  • Tier-2 pledges to WLCG will be made shortly. The situation is fine unless there are significant equipment retirements coming up.
  • See Steve Lloyd's GridPP29 talk for the latest on the GridPP accounting.


Wednesday 6th September

  • Sites should check the atlas page reporting HS06 coefficient because according to the latest statement from Steve that is what it's going to be used Atlas Dashboard coefficients are averages over time.

I am going to suggest using the ATLAS production and analysis numbers given in hs06 directly rather than use cpu secs and try and convert them ourselves as we have been doing. There doesn't seem to be any robust way of doing it any more and so we may as well use ATLAS numbers which are the ones they are checking against pledges etc anyway. If the conversion factors are wrong then we should get them fixed in our BDIIs. No doubt there will be a lively debate at GridPP29!

Documentation - KeyDocs

Tuesday 23rd October

KeyDocs monitoring status: Grid Storage(7/0) Documentation(3/0) On-duty coordination(3/0) Staged rollout(3/0) Ticket follow-up(3/0) Regional tools(3/0) Security(3/0) Monitoring(3/0) Accounting(3/0) Core Grid services(3/0) Wider VO issues(3/0) Grid interoperation(3/0) Cluster Management(1/0) (brackets show total/missing)

Thursday 26th July

All the "site update pages" have been reconfigured from a topic oriented structure into a site oriented structure. This is available to view at https://www.gridpp.ac.uk/wiki/Separate_Site_Status_Pages#Site_Specific_Pages

Please do not edit these pages yet - any changes would be lost when we refine the template. Any comments gratefully received, contact: sjones@hep.ph.liv.ac.uk

Interoperation - EGI ops agendas

Monday 8th October

  • COD are about to launch monitoring tickets for 'out of support' services, (i.e. glite 3.2), for removal by the end of the month. (They seem to have missed some gLite 32 CREAM CE's, however - we need to make sure we don't).
  • EMI updates. EMI-2, expected today or so.

DPM 1.8.4 (Yay! But let it filter through staged rollout a bit...) LB and WMS 3.4 (Both with security updates). UI and WN (including 32bit libs, and a few other dependancies).

  • Tarballs were raised. Tiziana raised the need for a tarball (EMI-2) before the gLite 3.2 were retired.
  • Staged Rollout. The ARC 2.0.0 clients are in the production repositories due to the emi-ui being in production. (Don't think that affects anyone in the UK).
  • Released today: BDII Core and GFAL/lcgUtils.
  • Products in staged rollout: WMS 3.3.8; CREAM 1.13.4 (due to a mismatch between EMI and UMD versions, this is 1.13.5 in UMD)
  • It's been noted that there are a number of products without early adopters in EMI 2: EMIR, Pseudonymity, Wnodes, GridSAM and OGSA-DAI. These will not be included in UMD, unless there's an EA, and demand from NGI's. There's also a few with no EA in EMI-2, but there are in EMI-1, and these are expected to move to EMI-2 at some point: CLUSTER, CREAM-LSF. (VOMS was listed, but the EA was present, and pointed out they are on EMI-2).
  • Unsupported services on 8th October EGI list.


Monitoring - Links MyWLCG

Monday 2nd July

  • DC has almost finished an initial ranking. This will be reviewed by AF/JC and discussed at 10th July ops meeting

Wednesday 6th June

  • Ranking continues. Plan to have a meeting in July to discuss good approaches to the plethora of monitoring available.
  • Glasgow dashboard now packaged and can be downloaded here.
On-duty - Dashboard ROD rota

Friday 19th October

  • Many sites continue to have planned downtimes for EMI upgrades, with knock-on effects on other local services (eg SRM -> WN Rep alarms). Changeover back to Oxford GridPP Nagios midweek, with some caching weirdness (reloading the dashboard produced one of two different sets of results!) which quickly went away.

Friday 12th October

  • There is a new ROD newsletter available from EGI.
  • As of this week, John Walsh will no longer be contributing to the ROD work. Many thanks to John for his input over the years!


Rollout Status WLCG Baseline

Monday 1st October

  • All gLite 3.1 services and nodes should now have been upgraded or removed.

Thursday 13rd September

Updated all SR pages.

Monday 3rd September

  • Test queues for EMI WNs: RAL T1, Oxford, Liverpool?, Brunel

Tuesday 31st July

  • Brunel has a test EMI2/SL6 cluster almost ready for testing - who (smaller VOs?) will test it with their software.

Wednesday 18th July - Core ops

  • Sites (that needed a tarball install) will need to work on own glexec installs
  • Reminder that gLite 3.1 no longer supported. 3.2 support is also decreasing. Need to push for EMI.
Security - Incident Procedure Policies Rota

Monday 22nd October

  • Last week's UK security activity was very much business as usual; there are a lot of alarms in the dashboard for UK sites, but for most of the week they only related to the gLite 3.2 retirement.

Friday 12th October

  • The main activity over the last week has been due to new Nagios tests for obsoleted glite middleware and classic SE instances. Most UK sites have alerts against them in the security dashboard and the COD has ticketed sites as appropriate. Several problems have been fixed already, though it seems that the dashboard is slow to notice the fixes.

Tuesday 25th September


Services - PerfSonar dashboard

Thursday 18th October

  • VOMS sub-group meeting on Thursday with David Wallom to discuss the NGS VOs. Approximately 20 will be supported on the GridPP VOMS. The intention is to go live with the combined (upgrades VOMS) on 14th November.
  • The Manchester-Oxford replication has been successfully tested. Imperial to test shortly.

Tuesday 18th September

  • VOMS in Manchester is now installed with both NGS/GridPP VOs. There is some political decision to take about how to support the NGS VOs and how to maintain them but they have been installed. Replication tests between Manchester and Oxford can now start.
  • Meeting date/time for follow-up VOMS discussion needs to be agreed for later this week

Tuesday 11th September

  • Still some sites needing to deploy perfsonar
  • Meeting date/time for follow-up VOMS discussion needs to be agreed for later this week
Tickets

Monday 22nd of Octber 14:30 BST</br> 36 Open UK tickets today, 12 of them are Unsupported Glite Software tickets.

Unsupported GLite Software tickets:</br> No sites have left these tickets untouched, which is good. I'm sure these will be talked about elsewhere in the meeting. For completeness I summarised them below, with the dates they were opened and last updated.

BRUNEL: https://ggus.eu/ws/ticket_info.php?ticket=87469 (17/10) In Progress (18/10)</br> UCL: https://ggus.eu/ws/ticket_info.php?ticket=87468 (17/10) In Progress (17/10)</br> QMUL: https://ggus.eu/ws/ticket_info.php?ticket=87473 (17/10) Waiting for reply (18/10)</br> BRISTOL: https://ggus.eu/ws/ticket_info.php?ticket=87472 (17/10) In Progress (18/10)</br> OXFORD: https://ggus.eu/ws/ticket_info.php?ticket=87471 (17/10) In Progress (17/10)</br> CAMBRIDGE: https://ggus.eu/ws/ticket_info.php?ticket=87470 (17/10) In Progress (17/10)</br> MANCHESTER: https://ggus.eu/ws/ticket_info.php?ticket=87467 (17/10) On hold (17/10)</br> SHEFFIELD: https://ggus.eu/ws/ticket_info.php?ticket=87466 (17/10) On hold (17/10)</br> EDINBURGH: https://ggus.eu/ws/ticket_info.php?ticket=87171 (10/10) In progress (10/10)</br> GLASGOW: https://ggus.eu/ws/ticket_info.php?ticket=87170 (10/10) In progress (15/10)</br> EFDA-JET: https://ggus.eu/ws/ticket_info.php?ticket=87169 (10/10) In progress (10/10)</br> LIVERPOOL: https://ggus.eu/ws/ticket_info.php?ticket=87167 (10/10) In progress (10/10)</br>


TIER 1</br> https://ggus.eu/ws/ticket_info.php?ticket=86705 (3/10)</br> Sno+ job errors at RAL. Last word that Sno+ production users needed to be implemented, Matt M from Sno+ asks if there's been any progress, a reversed waiting for reply. The RAL chaps have probably been very busy with the move to EMI creams. In progress (17/10)

https://ggus.eu/ws/ticket_info.php?ticket=86152 (17/9)</br> Packets loss on the RAL Tier 1 Perfsonar. Under investigation, but due to the slow progress expected when debugging network niggles this probably should be On Holded. In progress (19/9)

SUSSEX</br> https://ggus.eu/ws/ticket_info.php?ticket=87535 (18/10)</br> This nagios ticket concerning your apel box might have flown under the Sussex radar it needs tending. Assigned (18/10)</br> (almost certainly an extension of the problem in https://ggus.eu/ws/ticket_info.php?ticket=86996)

https://ggus.eu/ws/ticket_info.php?ticket=81784 (1/5)</br> Ye Olde Sussex certification ticket. How did implementing Atlas Space Tokens go? In progress (11/10)

QMUL</br> https://ggus.eu/ws/ticket_info.php?ticket=86306 (22/09)</br> Chris is still having to regularly manually purge unkillable idle lhcb jobs from his system. This doesn't seem ideal - is there a way to break the cycle? In Progress (22/10)

Of interest:</br> https://ggus.eu/ws/ticket_info.php?ticket=81496</br> The current (AFAIK) "Where's the tarball?" ticket, thanks to Chris for reminding me in his ticket.

Tools - MyEGI Nagios

Wednesday 17th October

Monday 17th September

  • Current state of Nagios is now on this page.

Monday 10th September

  • Discusson needed on which Nagios instance is reporting for the WLCG (metrics) view



VOs - GridPP VOMS VO IDs Approved VO table

Tuesday 23 October

  • A local user is wanting to get on the grid and wants to set up his own UI. Do we have instructions?

Monday 15th October

  • Sno+ jobs now work at Dresden https://ggus.eu/ws/ticket_info.php?ticket=86741, but there has got to be a better way.
  • Discussion with SNO+ about their requirements - discussions started on the following topics:
  • Robot certificates and hardware keys
  • FCR
  • Managing storage - how to avoid users filling up the space

Monday 8th October

  • Sno+ had problems with EMI-2 WN and ganga - formatting changes in EMI-2 command output.
  • Now fixed by Mark Slater (8 hours to install EMI2-WN and 20 mins to fix ganga.
  • Snoplus jobs don't work at Dresden https://ggus.eu/ws/ticket_info.php?ticket=86741
  • Draft e-mail to warning "non LHC VOs" about upcoming updates sent to ops list. Comments please.


Friday 30th September

  • Summary of some VO activities given at GridPP29
  • Need more feedback/testing from smaller VOs ahead of EMI2-WN change and then SL6.

Tuesday 18 September 2012

  • No VOs reporting issues.
  • VOs have been asked for a brief summary for the GridPP meeting.

Monday 27th August


Site Updates

Tuesday 9th October

  • SUSSEX: Site working on enabling of ATLAS jobs.


Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Monday 1st October

  • ELC work


Tuesday 25th September

  • Reviewing pledges.
  • Q2 2012 review
  • Clouds and DIRAC
GridPP ops meeting - Agendas Actions Core Tasks

Tuesday 21st August - link Agenda Minutes

  • TBC


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda EVO meeting

Wednesday 24th October

  • Operations report
  • Castor 2.1.12 upgrade for LHCb instance successful yesterday (23rd Oct). Date for remaining instance (GEN) is 30th Oct.
  • Glite CREAM CEs replaced with new CEs running EMI version yesterday (23rd). Change successful but not all VO SUM tests yet pointing to new CEs.
  • Alastair gave a short presentation about hyperthreading. Plan to enable this around the first complete week in November.
  • Investigations are ongoing (using perfsonar) into asymmetric routing of data over (and not back over) the OPN.
WLCG Grid Deployment Board - Agendas MB agendas

October meeting Wednesday 10th October




NGI UK - Homepage CA

Wednesday 22nd August

  • Operationally few changes - VOMS and Nagios changes on hold due to holidays
  • Upcoming meetings Digital Research 2012 and the EGI Technical Forum. UK NGI presence at both.
  • The NGS is rebranding to NES (National e-Infrastructure Service)
  • EGI is looking at options to become a European Research Infrastructure Consortium (ERIC). (Background document.
  • Next meeting is on Friday 14th September at 13:00.
Events

WLCG workshop - 19th-20th May (NY) Information

CHEP 2012 - 21st-25th May (NY) Agenda

GridPP29 - 26th-27th September (Oxford)

UK ATLAS - Shifter view News & Links

Thursday 21st June

  • Over the last few months ATLAS have been testing their job recovery mechanism at RAL and a few other sites. This is something that was 'implemented' before but never really worked properly. It now appears to be working well and saving allowing jobs to finish even if the SE is not up/unstable when the job finishes.
  • Job recovery works by writing the output of the job to a directory on the WN should it fail when writing the output to the SE. Subsequent pilots will check this directory and try again for a period of 3 hours. If you would like to have job recovery activated at your site you need to create a directory which (atlas) jobs can write too. I would also suggest that this directory has some form of tmp watch enabled on it which clears up files and directories older than 48 hours. Evidence from RAL suggest that its normally only 1 or 2 jobs that are ever written to the space at a time and the space is normally less than a GB. I have not observed more than 10GB being used. Once you have created this space if you can email atlas-support-cloud-uk at cern.ch with the directory (and your site!) and we can add it to the ATLAS configurations. We can switch off job recovery at any time if it does cause a problem at your site. Job recovery would only be used for production jobs as users complain if they have to wait a few hours for things to retry (even if it would save them time overall...)
UK CMS

Tuesday 24th April

  • Brunel will be trialling CVMFS this week, will be interesting. RALPP doing OK with it.
UK LHCb

Tuesday 24th April

  • Things are running smoothly. We are going to run a few small scale tests of new codes. This will also run at T2, one UK T2 involved. Then we will soon launch new reprocessing of all data from this year. CVMFS update from last week; fixes cache corruption on WNs.
UK OTHER

Thursday 21st June - JANET6

  • JANET6 meeting in London (agenda)
  • Spend of order £24M for strategic rather than operational needs.
  • Recommendations to BIS shortly
  • Requirements: bandwidth, flexibility, agility, cost, service delivery - reliability & resilience
  • Core presently 100Gb/s backbone. Looking to 400Gb/s and later 1Tb/s.
  • Reliability limited by funding not ops so need smart provisioning to reduce costs
  • Expecting a 'data deluge' (ITER; EBI; EVLBI; JASMIN)
  • Goal of dynamic provisioning
  • Looking at ubiquitous connectivity via ISPs
  • Contracts were 10yrs wrt connection and 5yrs transmission equipment.
  • Current native capacity 80 channels of 100Gb/s per channel
  • Fibre procurement for next phase underway (standard players) - 6400km fibre
  • Transmission equipment also at tender stage
  • Industry engagement - Glaxo case study.
  • Extra requiements: software coding, security, domain knowledge.
  • Expect genome data usage to explode in 3-5yrs.
  • Licensing is a clear issue
To note

Tuesday 26th June