Search results

Jump to: navigation, search

Page title matches

  • ... not suitable for a production system, but allows people new to ARC and/or HTCondor to quickly have a fully functioning system for testing. This will install the NorduGrid 4.1.0 RPMs as well as any dependencies. For HTCondor it is important to use 4.1.0 (or above).
    10 KB (1,318 words) - 10:50, 20 February 2019
  • [[Category:HTcondor]]
    5 KB (560 words) - 15:18, 13 October 2014
  • == HTCondor configuration == The HTCondor configuration on the worker nodes includes the following, for example:
    2 KB (301 words) - 13:31, 8 September 2017
  • ...ound reading. In summary: there are two problems with the default way that HTCondor imposes resource limits on memory. First, limits are imposed on a per proc ...lso, to understand what follows, you need to be aware of an inconsistency: HTCondor measures virtual memory in KB, and physical memory in MB.
    14 KB (2,050 words) - 13:27, 27 October 2017
  • Firstly, some basic HTCondor commands are as follows. To submit a job type: Note that lcgui03 and lcgui04 each have their own HTCondor schedd daemon, i.e. job queue. This is means that <code>condor_q</code> and
    5 KB (685 words) - 14:25, 26 February 2016
  • ...ndor 8.6.3 or above is recommended. Add the following to sudoers to enable HTCondor to use the Docker CLI as root: and add the following line to the HTCondor configuration:
    5 KB (724 words) - 10:04, 9 July 2017
  • ... page explains different techniques to implement access policies in an ARC/HTCondor system. [[Category:HTcondor]]
    140 B (18 words) - 13:54, 11 February 2018
  • ...e major differences between a standard CREAM+Torque/maui system and ARC-CE+HTCondor is the lack of queues to partition the nodes. ... have a queue concept. To make queues work I had to patch the ARC code for HTCondor. I use the arc_ce puppet module in HEP_puppet though lately my clone is div
    8 KB (1,326 words) - 07:19, 28 March 2018
  • '''Building our HTCondor-CE cluster''' Note: The official source of information of HTCondor-CE is at this site:
    16 KB (2,635 words) - 15:21, 7 November 2019

Page text matches

  • Documentation done for HTCondor-CE apel accounting. * HTCondor CE accounting status?
    41 KB (5,018 words) - 14:09, 30 October 2019
  • ...et. Not much news, but Andrew L has a plan to discuss the problem with the HTCondor devs at CERN when he's there. On Hold (27/11)
    184 KB (30,332 words) - 17:18, 16 December 2014
  • |<span style="color:green">HTCondor (local)</span> |<span style="color:green">HTCondor</span>
    11 KB (1,661 words) - 12:47, 21 June 2019
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    46 KB (5,846 words) - 07:57, 9 March 2015
  • ... I got from [http://research.cs.wisc.edu/htcondor/downloads-v2/download.pl htcondor], leave tarball in /opt/tarballs) If you want to use 1024-bit proxies rather than the HTCondor default of 512, now is also a good time to change it. You have to include a
    16 KB (2,428 words) - 11:15, 25 November 2015
  • ... not suitable for a production system, but allows people new to ARC and/or HTCondor to quickly have a fully functioning system for testing. This will install the NorduGrid 4.1.0 RPMs as well as any dependencies. For HTCondor it is important to use 4.1.0 (or above).
    10 KB (1,318 words) - 10:50, 20 February 2019
  • [[Category:HTcondor]]
    5 KB (560 words) - 15:18, 13 October 2014
  • ... (head nodes, doors, pools, except Chimera), 50% WNs, Squids, HTcondor-CE, HTCondor, VO services (PhEDEx, LHCb DIRAC, XRootD redirectors), Enstore testbed ... (head nodes, doors, pools, except Chimera), 50% WNs, Squids, HTcondor-CE, HTCondor, VO services (XRootD redirectors)
    21 KB (3,336 words) - 09:51, 19 September 2017
  • == HTCondor configuration == The HTCondor configuration on the worker nodes includes the following, for example:
    2 KB (301 words) - 13:31, 8 September 2017
  • ...chine/job features: PBS/torque and LSF implemented. SLURM pending. SGE and HTCondor in progress. * AOB: OSG plan to migrate to HTCondor CEs by October.
    35 KB (4,220 words) - 09:11, 30 June 2014
  • ...group memory controller notify it when the per-cgroup OOM fires, therefore HTCondor knows when a job has been killed by the OOM killer.
    1 KB (241 words) - 10:28, 11 February 2015
  • ...chine/job features: PBS/torque and LSF implemented. SLURM pending. SGE and HTCondor in progress. * AOB: OSG plan to migrate to HTCondor CEs by October.
    43 KB (5,584 words) - 12:52, 7 July 2014
  • ...chine/job features: PBS/torque and LSF implemented. SLURM pending. SGE and HTCondor in progress. * AOB: OSG plan to migrate to HTCondor CEs by October.
    39 KB (4,936 words) - 09:03, 21 July 2014
  • ...chine/job features: PBS/torque and LSF implemented. SLURM pending. SGE and HTCondor in progress. * AOB: OSG plan to migrate to HTCondor CEs by October.
    39 KB (4,833 words) - 10:09, 28 July 2014
  • * [[Example Build of an HTCondor-CE Cluster]].
    200 B (27 words) - 13:24, 2 April 2019
  • ...er using one of the most capable batch systems currently available, called HTCondor (or CONDOR for short). We also decided to front the system with an ARC CE. research.cs.wisc.edu/htcondor/manual/v8.2/condor-V8_2_10-Manual.pdf
    121 KB (17,569 words) - 08:26, 28 November 2019
  • * OSG following up on how to discover HTCondor CEs in the information system.
    46 KB (6,062 words) - 10:07, 15 September 2014
  • * OSG following up on how to discover HTCondor CEs in the information system.
    48 KB (6,422 words) - 08:45, 23 September 2014
  • ...ound reading. In summary: there are two problems with the default way that HTCondor imposes resource limits on memory. First, limits are imposed on a per proc ...lso, to understand what follows, you need to be aware of an inconsistency: HTCondor measures virtual memory in KB, and physical memory in MB.
    14 KB (2,050 words) - 13:27, 27 October 2017
  • * CMS: Scale testing of HTCondor and GlideinWMS by OSG - various issues. Reminder: Participate in space moni
    46 KB (5,940 words) - 04:40, 13 October 2014
  • * CMS: Scale testing of HTCondor and GlideinWMS by OSG - various issues. Reminder: Participate in space moni
    39 KB (4,711 words) - 03:39, 21 October 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee
    40 KB (4,976 words) - 10:25, 27 October 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    42 KB (5,228 words) - 10:37, 4 November 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee ...Es. These are now largely resolved. The final fix being to move to per-job HTCondor history files.
    48 KB (6,138 words) - 09:19, 10 November 2014
  • * Ian circulated information about an [https://indico.cern.ch/event/272794/ HTCondor workshop] 8th/9th December. Vidyo will be available. If you have strong rea ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    39 KB (4,698 words) - 18:46, 16 November 2014
  • ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    41 KB (5,123 words) - 10:02, 1 December 2014
  • ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL ...et. Not much news, but Andrew L has a plan to discuss the problem with the HTCondor devs at CERN when he's there. On Hold (27/11)
    50 KB (6,536 words) - 00:08, 7 December 2014
  • * This week 8th-9th December there is an [http://indico.cern.ch/event/272794/ HTCondor workshop taking place] - Vidyo is available and most talks are being upload
    40 KB (4,992 words) - 19:01, 15 December 2014
  • ...unnecessary ticket filing. Gareth noted that the full migration to ARC and HTCondor, which should see the end of these issues, will hopefully be completed by t
    117 KB (18,736 words) - 11:05, 4 January 2016
  • * This week 8th-9th December there is an [http://indico.cern.ch/event/272794/ HTCondor workshop taking place] - Vidyo is available and most talks are being upload
    44 KB (5,642 words) - 20:59, 21 December 2014
  • |HTCondor
    3 KB (378 words) - 09:57, 27 June 2017
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    48 KB (6,074 words) - 10:36, 16 March 2015
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    44 KB (5,438 words) - 08:48, 23 March 2015
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    44 KB (5,487 words) - 08:53, 30 March 2015
  • ...2 enabled correctly. This is now done, as it turned out the problem wasn't HTCondor on DIRAC, but CERN's difficulties at installing a new VO.
    19 KB (3,141 words) - 12:14, 27 April 2020
  • * T0 news: batch HTCondor pilot is open for grid submission. Lower-than-usual WLCG availability figur
    46 KB (5,803 words) - 11:48, 16 May 2015
  • * T0 news: batch HTCondor pilot is open for grid submission. Lower-than-usual WLCG availability figur
    46 KB (5,732 words) - 18:32, 23 May 2015
  • ...sed by LIP. A new version of UMD (3.13) has been released. The size of the HTCondor pilot service at CERN is now 300 cores and fully used. Agreed to establish
    46 KB (5,777 words) - 09:41, 20 July 2015
  • | CREAM CEs to be replaced by HTCondor CE (end of May)
    2 KB (318 words) - 15:36, 29 March 2016
  • * Interest in HTCondor CE. (Ops thread 20/08).
    41 KB (5,000 words) - 04:11, 1 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    43 KB (5,351 words) - 16:49, 6 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    44 KB (5,604 words) - 10:22, 15 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    44 KB (5,552 words) - 22:25, 19 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    45 KB (5,699 words) - 08:31, 28 September 2015
  • ...s at SARA when srm was overloaded by a local user. Working on interface to HTCondor-CE.
    48 KB (6,163 words) - 16:24, 29 November 2015
  • ...s at SARA when srm was overloaded by a local user. Working on interface to HTCondor-CE.
    47 KB (5,899 words) - 20:49, 6 December 2015
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    47 KB (5,834 words) - 10:11, 11 January 2016
  • * [ https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    53 KB (6,920 words) - 15:52, 4 January 2016
  • CMS validation of HTCondor CEs at Bristol - on hold awaiting the accounting getting sorted. On hold (2 CMS validation of the HTCondor CE at Bristol. Still waiting on the accounting getting sorted before things
    150 KB (23,740 words) - 12:54, 9 January 2017
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    51 KB (6,516 words) - 23:59, 18 January 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    46 KB (5,834 words) - 12:12, 28 November 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    47 KB (5,867 words) - 21:18, 31 January 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    46 KB (5,812 words) - 23:00, 8 February 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    54 KB (7,071 words) - 09:10, 15 February 2016
  • Firstly, some basic HTCondor commands are as follows. To submit a job type: Note that lcgui03 and lcgui04 each have their own HTCondor schedd daemon, i.e. job queue. This is means that <code>condor_q</code> and
    5 KB (685 words) - 14:25, 26 February 2016
  • * Workshop on HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016. [https://indico.cern.ch/e/Sp
    43 KB (5,347 words) - 17:58, 6 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st). * Workshop on HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016. [https://indico.cern.ch/e/Sp
    47 KB (6,060 words) - 23:16, 13 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    42 KB (5,278 words) - 01:55, 20 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    44 KB (5,455 words) - 02:03, 29 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    44 KB (5,446 words) - 23:24, 3 April 2016
  • * Andrew: HTCondor Machine/Job Features testing? = Request for volunteers please!
    45 KB (5,695 words) - 00:36, 24 May 2016
  • * Andrew: HTCondor Machine/Job Features testing? = Request for volunteers please!
    43 KB (5,401 words) - 01:24, 30 May 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    44 KB (5,505 words) - 16:19, 3 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?. Validation of a new HTCondor CE at Bristol by CMS. At last check Bristol were testing the CERN accountin
    51 KB (6,664 words) - 22:21, 13 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    44 KB (5,489 words) - 22:21, 19 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    45 KB (5,697 words) - 11:17, 27 June 2016
  • CMS validation of the HTCondor CE at Bristol. Still waiting on the accounting getting sorted before things
    50 KB (6,425 words) - 22:25, 11 July 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    44 KB (5,485 words) - 07:57, 5 September 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    45 KB (5,779 words) - 09:19, 22 August 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor. CMS validation of HTCondor CEs at Bristol - on hold awaiting the accounting getting sorted. On hold (2
    50 KB (6,392 words) - 07:47, 16 August 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    45 KB (5,728 words) - 23:02, 29 August 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    44 KB (5,451 words) - 08:16, 12 September 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    52 KB (6,769 words) - 11:13, 18 September 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    46 KB (5,756 words) - 13:12, 30 January 2017
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. ...arting point, to provide a generic HTCondor client VM that will connect to HTCondor pools run by the local site, experiments, or larger sites.
    47 KB (6,026 words) - 09:22, 21 November 2016
  • ...arting point, to provide a generic HTCondor client VM that will connect to HTCondor pools run by the local site, experiments, or larger sites.
    50 KB (6,401 words) - 08:48, 31 October 2016
  • ...arting point, to provide a generic HTCondor client VM that will connect to HTCondor pools run by the local site, experiments, or larger sites.
    51 KB (6,619 words) - 11:34, 7 November 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. ...arting point, to provide a generic HTCondor client VM that will connect to HTCondor pools run by the local site, experiments, or larger sites.
    52 KB (6,786 words) - 05:33, 14 November 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    44 KB (5,462 words) - 10:47, 6 December 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. ... local batch, and now being tested for ALICE at Manchester using a pool of HTCondor jobs at CERN.
    45 KB (5,745 words) - 13:04, 12 December 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    49 KB (6,219 words) - 11:44, 9 January 2017
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. ... local batch, and now being tested for ALICE at Manchester using a pool of HTCondor jobs at CERN.
    46 KB (5,848 words) - 09:12, 20 December 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. ... local batch, and now being tested for ALICE at Manchester using a pool of HTCondor jobs at CERN.
    49 KB (6,317 words) - 09:33, 3 January 2017
  • ...ndor 8.6.3 or above is recommended. Add the following to sudoers to enable HTCondor to use the Docker CLI as root: and add the following line to the HTCondor configuration:
    5 KB (724 words) - 10:04, 9 July 2017
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    51 KB (6,530 words) - 08:56, 16 January 2017
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    47 KB (5,971 words) - 09:04, 23 January 2017
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting. * ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
    44 KB (5,446 words) - 15:00, 8 February 2017
  • * ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
    49 KB (6,270 words) - 11:57, 13 February 2017
  • * ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
    43 KB (5,356 words) - 10:15, 20 February 2017
  • * ATLAS MCORE VMs in testing. Correctly fetch HTCondor jobs associated with MCOREVAC PanDA queues.
    44 KB (5,413 words) - 16:17, 27 February 2017
  • |Arc/HTCondor |Torque/cream CE, HTCondor/ARC test
    4 KB (725 words) - 15:50, 4 April 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    43 KB (5,301 words) - 10:00, 22 May 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    45 KB (5,594 words) - 03:25, 18 April 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    45 KB (5,594 words) - 03:26, 18 April 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    45 KB (5,597 words) - 04:19, 23 April 2017
  • * Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
    48 KB (6,069 words) - 09:31, 10 July 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    44 KB (5,391 words) - 21:07, 1 May 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    44 KB (5,473 words) - 21:31, 6 May 2017
  • These feed jobs to a large HTCondor pool.
    314 B (48 words) - 10:24, 11 May 2017
  • ...day 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
    45 KB (5,648 words) - 10:05, 15 May 2017
  • * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    42 KB (5,118 words) - 09:19, 29 May 2017
  • ...this type which include a label, a scaling factor, the slot layout and the HTCondor headnode to be used. Last we add a local repository and an epel repository ...hat both the head node and the worker nodes share. You'll need to read the HTCondor Administration Manual for details on that. There is also a CGROUPS file for
    17 KB (2,792 words) - 16:35, 2 January 2018
  • ...e of site types as CMS (i.e. everyone using CREAM or ARC and possible even HTCondor).
    2 KB (259 words) - 12:52, 5 October 2020
  • * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    41 KB (5,091 words) - 19:49, 12 June 2017
  • * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    41 KB (5,069 words) - 16:29, 5 June 2017
  • * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    41 KB (5,091 words) - 08:07, 20 June 2017
  • * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    41 KB (5,107 words) - 09:34, 26 June 2017
  • * Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6 * HTCondor workshop in Europe 2017 6th-9th June. [https://indico.cern.ch/e/htcondor201
    42 KB (5,273 words) - 09:35, 3 July 2017
  • * Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
    43 KB (5,408 words) - 10:35, 17 July 2017
  • * Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
    42 KB (5,229 words) - 09:54, 31 July 2017
  • * Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
    42 KB (5,229 words) - 09:54, 31 July 2017
  • For CREAM/ARC/HTCondor-CE based sites the skatelescope.eu VO should be set up as for any other Gri
    3 KB (512 words) - 21:00, 18 October 2017
  • ... page explains different techniques to implement access policies in an ARC/HTCondor system. [[Category:HTcondor]]
    140 B (18 words) - 13:54, 11 February 2018
  • ...e major differences between a standard CREAM+Torque/maui system and ARC-CE+HTCondor is the lack of queues to partition the nodes. ... have a queue concept. To make queues work I had to patch the ARC code for HTCondor. I use the arc_ce puppet module in HEP_puppet though lately my clone is div
    8 KB (1,326 words) - 07:19, 28 March 2018
  • ==HTCondor==
    1,010 B (164 words) - 15:00, 12 June 2018
  • |<span style="color:green">HTCondor-CE APEL integration. https://twiki.cern.ch/twiki/bin/view/LCG/AccountingTas |<span style="color:green">WLCG/HTCondor-CE dev/GridPP</span>
    12 KB (1,774 words) - 10:36, 11 February 2019
  • == ARC CE/HTCondor == This job tracing example is based on HTCondor/ARC CE combination at Oxford.
    6 KB (1,046 words) - 09:33, 5 March 2019
  • '''Building our HTCondor-CE cluster''' Note: The official source of information of HTCondor-CE is at this site:
    16 KB (2,635 words) - 15:21, 7 November 2019
  • * We fixed a problem that prevent LSST jobs from running (HTCondor had not been updated with the new VOMS server).
    16 KB (1,609 words) - 08:38, 9 April 2019
  • * Provisional technical meeting this Friday@11am on HTCondor, and one is planned on EOS experiences soon(tm). * EGI has started an HTCondor integration process and captures progress here: https://ggus.eu/index.php?m
    7 KB (1,129 words) - 12:45, 17 June 2019

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)