Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 14th March 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 13th March 2017
 
|}
 
|}
  

Revision as of 10:15, 13 March 2017

Bulletin archive


Week commencing Monday 13th March 2017
Task Areas
General updates

Monday 6th March

  • We have received the WLCG T2 R/A figures for February.
    • ALICE
      • All okay
    • ATLAS
      • Oxford 84%:84%
    • CMS
      • All okay
    • LHCb
      • QMUL 84%:84%
      • Durham 88%:88%
    • Site responses:
      • QMUL: No known issues - possibly network related. Following up with LHCb.
      • Durham: Batch system upgrade led to one outage and a University wide internet connection loss led to another.

Monday 27th February


Monday 20th February


WLCG Operations Coordination - AgendasWiki Page

Monday 6th March

  • There was an ops coordination meeting on Thursday 2nd March - agenda | Minutes.
  • The overview talks were: Mid-SLAs | Machine Job Features.
  • The main summary items:
    • Lessons learned from ATLAS tape usage tests. Follow up via FTS steering group. Will share experience with other experiments.
    • "Mid SLA" resources. During the next months accumulate experience at CERN (providing such resources) and in experiments (using such resources). Review accumulated experience after a couple of months and decide what we need to do in terms of tagging, accounting, etc...
    • MJF deployment is not as successful as desired. Find help (at least temporary) for deployment campaign concentrating on the LHCb sites. See whether this task would become more important considering outcome of the benchmarking discussion.
    • In order to avoid inconsistencies in the naming of the service types along the WLCG IS chain (GocDB, OIM, SAM, experiment-specific systems like Dirac), there will be agreement between representatives from OSG, EGI and GocDB team and IS evolution task force on the policy for introducing of the new service types.
    • The next WLCG ops coordination meeting will be on 6th April.


Monday 27th February

  • The next WLCG Operations Coordination meeting will be Thursday this week starting at 15:30 CET.
  • Themes:
    • SLAs and usage of different kinds of computing resources
    • Machine/Job Features update
  • Experiments, T0, WGs & TFs are requested to add reports to the minutes page at least 1 HOUR before the meeting.
  • Tier-1 and Tier-2 sites are asked to please contact wlcg-ops-coord-chairpeople@cern.ch to have a specific slot added in the agenda if you have non-trivial feedback or announcements to be made.


Tuesday 21st February

  • Next meeting is on 2nd March.

Monday 6th February

  • Minutes from the WLCG Data Steering Group meeting of 2nd February are available on the meeting agenda page.


Tier-1 - Status Page

Tuesday 14th March A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here

  • Castor SRM updates: Planning for LHCb SRMs to be the first to be updated on 22nd March.
  • IPv6 is being enabled on the Tier1 routers on the 8th Match. Ahead of this IPv6 was disabled on systems - it will be re-enabled on a case by case basis.
  • Two (of the four) chillers supplying the A/C for the R89 machine room are being replaced in the coming weeks.
  • Ongoing tests ongoing with some batch jobs for the LHC VOs running in SL6 containers on worker nodes running SL7.
  • New capacity hardware has been delivered. (Storage delivered, CPU in process of being delivered).
Storage & Data Management - Agendas/Minutes

Wednesday 15 Feb

  • Space tokens! Use them!
  • Leafed through interesting topics (technology permitting) from the CS3 workshop

Wednesday 08 Feb

  • More on accounting (again)

Wednesday 01 Feb

  • Accounting - need to revisit (again); KeyDocs need updating
  • Hardware - Simon's got a disk array to test drive

Wednesday 18 Jan

  • Continued ZFS discussion
  • Updates from the non-LHC VOs, data-wise. Mostly no news, except for DiRAC, Cambridge HPC and Edingburgh EPCC are debugging and testing; LSST expecting to do MC workflows end of Jan.


Tier-2 Evolution - GridPP JIRA

Tuesday 28 February 2017

  • ATLAS jobs now running on Birmingham Vac VMs.
  • LHCb is now running its standard DIRAC VMs on Google Compute Engine using GridPP's Vcycle.

Tuesday 21 February 2017

  • Some ALICE production jobs running at Birmingham and Oxford in Vac VMs.

Tuesday 14 February 2017

  • Vac installed at Birmingham. Running LHCb production jobs. Preparing to run ALICE VMs.
  • ALICE VMs switched to using GSI proxies internally rather than host cert/keys.

Friday 3 February 2017

  • ATLAS MCORE VMs now successfully running PanDA production jobs.


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 7th Mar

I want to get rid of following stale docs...

  • Ten Easy Network Questions
  • GridPP Answers to 10 Easy Network Questions
  • SL5 status
  • Glasgow Middleware Operations Logbook
  • London Tier2 Shares
  • 23rd June 2010 Special Topic: NGS Technical Roadmap - Pete Gronbech
  • SAM availability: Monthly summary table
  • Transfer Tests Birmingham Endpoints
  • EVO Tips and Tricks
  • BaBar: bbrbsub270

Monday 13th Feb

  • Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
  • There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:


Monday 30th January

The fusion VO has been removed from GridPP Approved VOs.

Monday 9th January

  • Tom put these together:
    • A snapshot of the GridPP UserGuide is now available as an offline document in the Zenodo repository:
    • ...and the v1.0 release of the LaTeX code used to compile it is here.
    • There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release here.


Tue 22nd Nov

  • More on Accounting audit tools

The process for ARC, Toque and VAC is now documented here.

https://github.com/gridpp/audit/wiki


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas

Monday 13th February

  • There was an ops meeting on 13th February. Agenda
    • frontier-squid-3 in UMD 4.4.0 - changes to config
    • Assess IPv6 readiness:
      • Resource Centres: assess the IPv6 readiness of the site infrastructure (real machines, cloud managers)
      • NGIs/ROCs please start discussing with sites and provide suggestions for the overall plan
    • Decommissioning of dCache 2.10
    • Discussed stale ARGO results; being discussed with Product Teams.

Monday 16th January

  • There was an ops meeting on 9th January. Agenda.


Monday 7th November

  • There was an EGI Ops meeting today: agenda
  • UMD 3.14.5 released today
    • VOMS 3.5.0, which makes RFC proxies the default for voms-proxy-init
  • UMD 4.3.0 'October' release, release candidate ready, to be released by end of this week, including:
    • ARC, GFAL2, XROOT, Davix, dCache, ARGUS, Gridsite, edg-mkgrid, umd-release for CentOS7
  • please start using UMD4/SL6 or UMD4/CentOS7 instead of UMD3/SL6 & please don't use anymore EMI3
    • (think there may be a campaign around this soon)
  • Downtimes due to the vulnerability CVE-2016-5195: request an A/R recomputation
    • All the resource centres that were affected by the vulnerability CVE-2016-5195 and that declared a downtime between 2016-10-20 16:00 UTC and 2016-10-31 18:00 UTC are invited to request a recomputation of A/R figures for the days in which the downtime was ongoing.
Monitoring - Links MyWLCG

Monday 13th Febraury

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

27th February

  • Forwarded two tickets (RALPP and ECDF) to the monitoring team, as this looks like more ARC shenanigans.
  • There's also a bunch of low availability tickets which clog up the system.


Tuesday 21st February

  • Very quiet!
  • Rota responses enable planning through to May.

Monday 16th January

  • Rota to be updated this week. Gordon is on shift this week.
Rollout Status WLCG Baseline

Monday 13th February

  • Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
  • Does anyone want specific questions in this area tackled in a roundtable discussion?

Tuesday 7th December

  • Raul reports: validation of site BDII on Centos 7 done.

Tuesday 15th September

Tuesday 12th May

  • MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.


References


Security - Incident Procedure Policies Rota

Tuesday 7th February

  • EGI SVG Advisory [TLP:WHITE] 'HIGH' risk CVE-2017-6074 linux kernel (DCCP) privilege escalation vulnerability [1]
    • following last week's HEADS-UP
  • ISGC security sessions this week - [2] [3] [4]
  • UK Security Team meeting this afternoon.

Monday 27th February

  • EGI-SVG-2017-6074 - 23rd-Feb [HEADS-UP] Linux kernel root escalation vulnerability [5]
    • The publishing of an exploit is expected to make this a CRITICAL vulnerability. Sites are therefore advised to deploy the proposed mitigation now and to plan for a kernel update campaign (including reboot) within the time lines stated in: https://wiki.egi.eu/wiki/SEC03_EGI-CSIRT_Critical_Vulnerability_Handling
    • Updates are available for all major distributions.
  • Updated IGTF distribution 1.81 - updated trust anchors [6]

The EGI security dashboard.


Services - PerfSonar production dashboard |PerfSonar development dashboard | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 6th March

  • Last week it was noted that some ATLAS RIPE probes (the USB ones) have had hardware errors. If you need a replacement and RIPE are slow to respond then contact Jeremy.
  • Is anyone running any tests with their RIPE probe?

Tuesday 14th February

  • The development dashboard is now operational again. However the production dashboard is not currently displaying latency results (OSG ticket submitted).
  • Birmingham pS host had lost its entire network connection and both Lancaster's hosts their IPv6 connection. Durham results are incomplete, GGUS ticket submitted (#126587).

Tuesday 25th October

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

Thursday 9th March 2017
Matt's on leave so no ticket update from him, but console yourselves with a link to all the UK tickets!

Tools - MyEGI Nagios

29th November 2016

LSST monitoring is available through vo-nagios

https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail

13th September 2016


VOs - GridPP VOMS VO IDs Approved VO table
Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A