RAL Tier1 Operations Report for 8th March 2017

Review of Issues during the week 1st to 8th March 2017.
  • Following a discussion at last week's liaison meeting an apparant cap on LHCb batch jobs was removed. However, it turned out that the restriction in the Condor configuration file was not erroneous and had no effect. LHCb batch jobs were not being limited.
  • There was a problem reported for access to AtlasScratchDisk in Castor this morning (8th Mar). Atlas have reported a large backlog of outstanding file transfers. Being worked on at time of meeting.
Resolved Disk Server Issues
  • None
Current operational status and issues
  • We are still seeing a rate of failures of the CMS SAM tests against the SRM. These are affecting our (CMS) availabilities but the level of failures is reduced as compared to a few weeks ago.
Ongoing Disk Server Issues
  • GDSS689 (AtlasDataDisk - D1T0) reported 'fsprobe' errors and was taken out of production this morning. Investigations ongoing.
Limits on concurrent batch system jobs.
  • Atlas Pilot (Analysis) 1500
  • CMS Multicore 460
Notable Changes made since the last meeting.
  • CMS PhEDEx debug transfers switched from CASTOR to CEPH ECHO.
  • Ongoing work applying security and other patches. More back-end database systems have been updated to remove a software layer ("asmlib").
  • IPv6 has been disabled across systems in preparation for enabling IPv6 through the routers.
  • This morning (8th March) work has been carried out to enabled IPv6 through the Tier's routers.
Declared in the GOC DB

None

Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.

Pending - but not yet formally announced:

  • Update Castor SRMs. Propose LHCb SRMs first - target date 22nd March.
  • Chiller replacement - work imminent.
  • Merge AtlasScratchDisk into larger Atlas disk pool.

Listing by category:

  • Castor:
    • Update SRMs to new version, including updating to SL6.
    • Bring some newer disk servers ('14 generation) into service, replacing some older ('12 generation) servers.
  • Databases
    • Removal of "asmlib" layer on Oracle database nodes. (Ongoing)
  • Infrastructure:
    • Two of the chillers supplying the air-conditioning for the R89 machine room will be replaced.
Entries in GOC DB starting since the last report.
Service Scheduled? Outage/At Risk Start End Duration Reason
Whole site SCHEDULED WARNING 08/03/2017 07:00 08/03/2017 11:00 4 hours Warning on site during network intervention in preparation for IPv6.
Open GGUS Tickets (Snapshot during morning of meeting)
GGUS ID Level Urgency State Creation Last Update VO Subject
126905 Green Less Urgent In Progress 2017-03-02 2017-03-02 solid finish commissioning cvmfs server for solidexperiment.org
126184 Green Less Urgent In Progress 2017-01-26 2017-02-07 Atlas Request of inputs for new sites monitoring
124876 Red Less Urgent On Hold 2016-11-07 2017-01-01 OPS [Rod Dashboard] Issue detected : hr.srce.GridFTP-Transfer-ops@gridftp.echo.stfc.ac.uk
117683 Red Less Urgent On Hold 2015-11-18 2017-03-02 CASTOR at RAL not publishing GLUE 2.
Availability Report

Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 845); Atlas HC ECHO = Atlas ECHO (Template 842);CMS HC = CMS HammerCloud

Day OPS Alice Atlas CMS LHCb Atlas HC Atlas HC ECHO CMS HC Comment
01/03/17 100 100 83 81 100 99 100 99 Atlas: Ongoing problems with SRM test; CMS - CE test failures due to poblem with argus server.
02/03/17 100 100 59 99 100 100 99 100 Atlas: Ongoing problems with SRM test; CMS - timeouts in SRM tests.
03/03/17 100 100 91 98 100 97 100 100 Atlas: Ongoing problems with SRM test; CMS - timeouts in SRM tests.
04/03/17 100 100 96 100 100 100 100 99 Atlas: Ongoing problems with SRM test.
05/03/17 100 97 98 88 92 97 100 100 Atlas: Ongoing problems with SRM test; CMS - timeouts in SRM tests; LHCb - some SRM test failures.
06/03/17 100 68 89 97 100 99 98 100 Alice: Central monitoring problem; Atlas: Ongoing problems with SRM test; CMS - timeouts in SRM tests.
07/03/17 100 100 100 93 100 94 99 100 Timeouts on CMS SRM tests.
Notes from Meeting.
  • ECHO: Two additional 'MON' boxes are being set-up bringing the total to five. The existing three can cope with normal activity but the additional ones would speed up recoveries and starts. Two additional gateway nodes are also being set-up (also bringing the total to five) which will improve bandwidth.
  • VO Dirac: some tar files moved from Edinburgh but little activity from sites other than Durham as yet.