RAL Tier1 Operations Report for 1st June 2016

Review of Issues during the week 25th May to 1st June 2016.
  • Last week we reported a problem with the Tape Library control software that had started crashing. On Thursday (26th) we switched to using a backup server for the connection to the tape libraries. This still crashed but less frequently. Since then we have been running in this configuration. Crashes have still occurred but we have a re-starter in place plus monitoring so that we are aware of and can fix problems. Since then the tape libraries have delivered a reasonable service - although this is because we are managing the situation. This morning an engineer has come to fix a couple of hardware faults which are not show stoppers but need resolving. It is not clear if this will help the problem of the software crashing. We have put a 'warning' in the GOC DB for some hours today to cover this time. We continue to follow up with the vendor.
Resolved Disk Server Issues
  • GDSS698 (LHCbDst - D1T0) crashed overnight Monday/Tuesday 30/31 May. It was returned to service this morning following BIOS and firmware updates.
  • GDSS718 (LHCbDst - D1T0) crashed ysterday evening (Tuesday 31st May. It was returned to service this morning following BIOS and firmware updates.
Current operational status and issues
  • There is a problem seen by LHCb of a low but persistent rate of failure when copying the results of batch jobs to Castor. There is also a further problem that sometimes occurs when these (failed) writes are attempted to storage at other sites. A recent modification has improved, but not completed fixed this.
  • The intermittent, low-level, load-related packet loss seen over external connections is still being tracked. Likewise we have been working to understand some remaining low level of packet loss seen within a part of our Tier1 network.
Ongoing Disk Server Issues
  • None
Notable Changes made since the last meeting.
  • The migration of Atlas data from "C" to "D" tapes is ongoing. We have migrated around 400 of the 1300 tapes so far. This migration has carried on through this last week despite the tape library problems.
  • The HAProxy load balancers are now fully in use in front of the production FTS3 service.
  • New tape pools have been set-up for Atlas and LHCb.
Declared in the GOC DB
Service Scheduled? Outage/At Risk Start End Duration Reason
lcgwms06.gridpp.rl.ac.uk, SCHEDULED OUTAGE 01/06/2016 11:00 30/06/2016 11:00 29 days, Server lcgwms06.gridpp.rl.ac.uk Decommissioning
Advanced warning for other interventions
The following items are being discussed and are still to be formally scheduled and announced.
  • Decommissioning of "GEN Scratch" storage in Castor. (Formally announced by EGI broadcast). Write access to this area has now been stopped in preparation for completely stopping access on the 20th June.
  • Decommissioning of lcgwms06. This is being stopped from receiving new work today (1st June).

Listing by category:

  • Databases:
    • Switch LFC/3D to new Database Infrastructure.
  • Castor:
    • Update SRMs to new version, including updating to SL6. This will be done after the Castor 2.1.15 update.
    • Update to Castor version 2.1.15. This awaits successful resolution and testing of the new version.
    • Migration of data from T10KC to T10KD tapes (Affects Atlas & LHCb data).
  • Networking:
    • Replace the UKLight Router. Then upgrade the 'bypass' link to the RAL border routers to 2*40Gbit.
  • Fabric
    • Firmware updates on remaining EMC disk arrays (Castor, LFC)
  • Grid Services
    • Once the use of the Load Balancer (HAProxy) has been proven for the test FTS service it will be extended to other services.
Entries in GOC DB starting since the last report.
Service Scheduled? Outage/At Risk Start End Duration Reason
lcgwms06.gridpp.rl.ac.uk, SCHEDULED OUTAGE 01/06/2016 11:00 30/06/2016 11:00 29 days, Server lcgwms06.gridpp.rl.ac.uk Decommissioning
All Castor endpoints (SRM) with tape. SCHEDULED WARNING 01/06/2016 10:00 01/06/2016 15:00 5 hours Expected Break in Tape Access for Around Two Hours During this Time Window while Engineer Attends Tape Library.
All Castor endpoints (SRM) with tape. UNSCHEDULED WARNING 26/05/2016 18:00 27/05/2016 17:00 23 hours Ongoing problems with tape library. Tape mounts may be delayed.
All Castor endpoints (SRM) with tape. UNSCHEDULED WARNING 25/05/2016 19:30 26/05/2016 14:00 18 hours and 30 minutes At risk on tape system overnight following problem mounting tapes.
Open GGUS Tickets (Snapshot during morning of meeting)
GGUS ID Level Urgency State Creation Last Update VO Subject
121687 Green Less Urgent On Hold 2016-05-20 2016-05-23 packet loss problems seen on RAL-LCG perfsonar
120810 Amber Urgent In Progress 2016-04-13 2016-05-24 Biomed Decommissioning of SE srm-biomed.gridpp.rl.ac.uk - forbid write access for biomed users
120350 Green Less Urgent In Progress 2016-03-22 2016-05-06 LSST Enable LSST at RAL
119841 Red Less Urgent On Hold 2016-03-01 2016-04-26 LHCb HTTP support for lcgcadm04.gridpp.rl.ac.uk
117683 Yellow Less Urgent On Hold 2015-11-18 2016-04-05 CASTOR at RAL not publishing GLUE 2
Availability Report

Key: Atlas HC = Atlas HammerCloud (Queue ANALY_RAL_SL6, Template 729); CMS HC = CMS HammerCloud

Day OPS Alice Atlas CMS LHCb Atlas HC CMS HC Comment
25/05/16 100 100 100 100 100 100 95
26/05/16 100 100 100 100 100 100 100
27/05/16 100 100 100 100 100 100 100
28/05/16 100 100 100 100 100 100 100
29/05/16 100 100 100 100 100 100 N/A
30/05/16 100 100 100 100 100 100 100
31/05/16 100 100 100 100 100 100 100