RAL Tier1 weekly operations castor 26/10/2018

From GridPP Wiki
Jump to: navigation, search

Standing agenda

1. Problems encountered this week

2. Upgrades/improvements made this week

3. What are we planning to do next week?

4. Long-term project updates (if not already covered)

5. Special topics

6. Actions

7. Review Fabric tasks

  1.   Link

8. AoTechnicalB

9. Availability for next week

10. On-Call

11. AoOtherB

Operation problems

Failure of gdss732 and gdss739 (both from lhcbDst). Back in production

Many checksum errors reported for files sent to CASTOR by Elastic tape for ingest (Kevin)

The new tape accounting system broke

Operation news

Facilities patching complete

All CASTOR d0t1 disk pools and atlasStripInput and cmsDisk patched

Plans for next few weeks

  * Migrate ATLAS to the CASTOR WLCGTape
  * Kernel patching of Eris 
  * Upgrade CASTOR_REPACK schema on pluto to 2.1.17-35
  * Push gsi authentication for xrootd in production, instance by instance (mon 29/10)
  * Proceed with the cmsDisk decommissioning

Long-term projects

New CASTOR WLCGTape instance. Things need doing: 1) Update of the CASTOR ldif file and 2) Fix a misconfiguration on the Eris disk array (cannot bring WLCGTape into prod before this is done) 3) Create a seperate xrootd redirector for ALICE

Actions

John to document changes in the CASTOR ldif file

Ask TimA about whether remaining dark data can be deleted and wheteher ATLAS still needs the cinstancedlf alias

Staffing

RA on call