RAL Tier1 weekly operations Grid 20120611

From GridPP Wiki
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • May accounting/metrics
    • Moved PhEDEx debug instance onto VM, upgraded to 4_1_0
    • More kernel/errata upgrades
    • Sorted out lcgsquid0678
    • Dealt with FTS problems, APEL problems
    • CMS processing
  • Coming week:
    • Job plan
    • Preparations for resource review meeting
    • Put VM APEL into production
    • CMS processing

Catalin

  • lcgwms03 re-installed as EMI WMS v3.3.5 [done]
  • 'bdii status' workaround in place for topBDII [done]
  • look into siteBDII virtualization [ongoing]
  • work on cvmfs non-LHC [ongoing]

Ian

  • Last week
* Annual Leave
  • This week
* Catchng up
* Job plan
* Work on team plans

James

  • Catching up after two weeks collecting email.
  • Installing some storage testbed systems.

Orlin

  • Quattorise NFS server and integrate it in a test virtual machine environment. [done]
  • Quattorise CE queue configuration templates and integrate it in the NFS server. [done]
  • Test ARGUS EMI Server in virtual testbed environment with shared NFS gridmapdir accounts. [ongoing]
  • Move EMI/UMD Worker Nodes lcg1060 lcg1062 in the GridTest queue with the latest kernel/errata. [done]
  • Fix Argus VO accounts creation to be identical as CREAM CEs in production. [done]
  • Modify Argus templates to work with EMI-2 SL6 in a virtual testbed. [ongoing]
  • Create and submit Workplan for 2012/2013. [ongoing]

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Grid OnCall: Andrew (Mon-Sun)
  • Primary OnCall: Ian (Mon-Sun)