Operational Issues
Description
|
Start
|
End
|
Affected VO(s)
|
Severity
|
Status
|
|
|
|
|
|
|
Downtimes
Description
|
Hosts
|
Type
|
Start
|
End
|
Affected VO(s)
|
|
|
|
|
|
|
Blocking Issues
Description
|
Requested Date
|
Required By Date
|
Priority
|
Status
|
|
|
|
|
|
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Andrew
- Last week:
- May accounting/metrics
- Moved PhEDEx debug instance onto VM, upgraded to 4_1_0
- More kernel/errata upgrades
- Sorted out lcgsquid0678
- Dealt with FTS problems, APEL problems
- CMS processing
- Coming week:
- Job plan
- Preparations for resource review meeting
- Put VM APEL into production
- CMS processing
Catalin
- lcgwms03 re-installed as EMI WMS v3.3.5 [done]
- 'bdii status' workaround in place for topBDII [done]
- look into siteBDII virtualization [ongoing]
- work on cvmfs non-LHC [ongoing]
Ian
* Annual Leave
* Catchng up
* Job plan
* Work on team plans
James
- Catching up after two weeks collecting email.
- Installing some storage testbed systems.
Orlin
- Quattorise NFS server and integrate it in a test virtual machine environment. [done]
- Quattorise CE queue configuration templates and integrate it in the NFS server. [done]
- Test ARGUS EMI Server in virtual testbed environment with shared NFS gridmapdir accounts. [ongoing]
- Move EMI/UMD Worker Nodes lcg1060 lcg1062 in the GridTest queue with the latest kernel/errata. [done]
- Fix Argus VO accounts creation to be identical as CREAM CEs in production. [done]
- Modify Argus templates to work with EMI-2 SL6 in a virtual testbed. [ongoing]
- Create and submit Workplan for 2012/2013. [ongoing]
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
OnCall Rota
- Grid OnCall: Andrew (Mon-Sun)
- Primary OnCall: Ian (Mon-Sun)