RAL Tier1 weekly operations Grid 20110425

From GridPP Wiki
Jump to: navigation, search

Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Alastair

  • A/L

Andrew

  • On A/L all last week
  • OS errata updates on glite-APEL, CMS VOBOX, CMS Squids [done]
  • OS errata updates on MyProxy & FTS [to do]
  • Try to sort out Maui config for CMS [to do]
  • CPU capacity updates [to do]
  • CMS storage consistency checks (data data & missing files) [ongoing]

Catalin

  • take over BDII [ongoing]
  • OS errata and kernel updates [ongoing]
  • involved with BDII (top and site) installation and configuration [done]
  • involved with CREAM CEs installation and configuration [stalled]
  • work on quattorised ATLAS Frontier installation [stalled]

Derek

  • A/L this week
  • Deploying test quattorised WMS [ongoing]
  • lcgce02 removed from production
  • Deploying test CREAM CE on latest updates with Alice config in prep for lcgce03 change control [ongoing]

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Primary OnCall: Catalin
  • Grid OnCall:
  • AoD: