Operational Issues
Description | Start | End | Affected VO(s) | Severity | Status |
---|---|---|---|---|---|
lcgce01 | All WLCG vos have reduced resiliency | Replacement host lcgce09 in testing, will be moving into production shortly |
Downtimes
Description | Hosts | Type | Start | End | Affected VO(s) |
---|
Blocking Issues
Description | Requested Date | Required By Date | Priority | Status |
---|---|---|---|---|
HW needed for quattorised glite-LB | 11 Oct 2010 | medium | [18-10-2010]Fabric acknowledged the request | |
HW needed for XROOT non-Castor tests | 14 Oct 2010 | medium | [18-10-2010]Fabric acknowledged the request |
Developments/Plans
Highlights for Tier-1 Ops Meeting
Highlights for Tier-1 VO Liaison Meeting
Detailed Individual Reports
Alastair
- Working on ATLAS software server, testing CVMFS
- 825 test jobs have been run.
- lcg0805 has been setup for production style testing, need to add queue into ATLAS system.
- Production tasks submitted.
- Writing script to graph transfer times for FTS transfers [on hold]
- Investigating FTS glite-3.2 transfer problems. [ongoing]
- Finishing draining of gdss81 for removal from production.
- Working on Hammer cloud test of castor 2.1.9 [ongoing]
Andrew
- Re-quattorized lcgapel0676; submitted change control document [Ongoing]
- Capacity planning system project [Ongoing]
- Setting up / testing backup PhEDEx instances [Ongoing]
- CMS data ops
- Running data rereco at ASGC, sorting out problems due to lost files [Ongoing]
- Run backfill at the Tier-1s using WMAgent [To do]
Catalin
- work on glite-LB quattor profile [ongoing]
- investigate (x)ROOT(d) [ongoing]
- prepare deployment of production glite 3.2 LB [ongoing]
- work on making IPMI interfaces available on grid services nodes [ongoing]
Derek
- CREAM CE quattor profile [ongoing]
- Investigating CREAM CE instability [ongoing]
- Sync'd quattor templates to QWG
- QWG Workshop
- Change Control process development
Matt
- Further testing of Quattorised gLite3.2 FTS FEs. [Ongoing]
- Quattorisation of MyProxy nodes (Change Control approved). [Ongoing]
- Test FTS SRM/GridFTP ratio configuration.
- Disk Deployment meeting. [New]
- Quattor FTM profiles. [New]
- Prep for Tier-1 Resources meeting. [Done]
- Nagios logfile monitoring development. [Done]
Richard
- Change control request entered for update to RAL site-level BDIIs [Done]
- Developing a set of Quattor templates for an ARGUS server [Ongoing]
- Developing a "pseudo-update" to apply a gLite update to BDIIs
- Working on the "team status page" being developed as an action from team awayday [Ongoing]
- Reviewing G/S process documentation [Ongoing]
- CASTOR items:
VO Reports
ALICE
ATLAS
CMS
LHCb
OnCall/AoD Cover
- Primary OnCall:
- Grid OnCall: Matt