RAL Tier1 weekly operations Fabric 20110314
From GridPP Wiki
Contents
Developments
- All:
- Martin:
- Ian:
- Monitoring cvmfs replica squids
- Finalising locations for management network backbone
- Sort out firewall/routing issues for new subnet
- Working with infortrend support on iscsi issues
- Investigating open source filer projects
- Tim:
- James A:
- James T
- Cheney
- hinode infosec
- database backups hickups
- dmf disaster recovery
- rsync for diamond
- patching
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Decommissioning old batch systems.(R 27)
- Test room review. (Every Monday morning)
- gdss496 created JBOD's drives and started badblock on all drives.
- Install StroMan on SL09/Adaptec disk servers.
- Memory replaced in dell system.(UPS room)
- Update firmware on Jetstor systems.(ongoing) Updated on three.
- gdss221 check hardware logs.
- Check Clustervision new batch systems. (Testing)
- Disk catchup with James T.
- SL08 testing continue.
- Labelling racks and systems in UPS and HPD room.
Operational Issues and Incidents
Index | Description | Start | End | Severity | Affected VO(s) |
---|
Summary of plans for week ahead
Scheduled and Cancelled Down Times
Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB
Component | Description | Start | End | Affected VO(s) | Type |
---|
Development priorities
- All
- Martin:
- Ian:
- Catch up after weekends callouts
- Quattor workshop (CERN)
- Meet cvmfs developers at CERN
- Tim:
- Cheney
- dmf DR
- James T:
- James A:
- Quattor workshop @ CERN
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Hardware failure metrics continue.
- Continue SL08 testing.
- Continuous decommissioning old batch systems.(R 27)
- Continue Labelling racks and systems in UPS and HPD room.
Absences
- Ian at CERN Tues-Fri
- James A at CERN Tues-Fri
- James T a/l Monday
Fabric On-Call
- Kashif : Monday - Sunday