RAL Tier1 weekly operations Fabric 20100405

From GridPP Wiki
Jump to: navigation, search

Developments

  • All:
  • Martin:
  • Ian:
  • Tim:
    • sort out ADS mess after weekend
    • get dougal back into production after engineer intervention
    • Rhubarb - get new disk into operation
  • Cheney:
    • Building new robot controller
    • sort out atlasbackup space problem
    • cleaning the machine room
    • updates to docco on wiki
    • move cdbd03 to new chassis with proc and memory upgrade
    • replace psu kevin's array (preprod)
    • replace drive vtl
  • James T:
    • Tier1 tours for open day and OPB events.
    • Viglen09 testing.
    • A/L Wednesday and Thursday
  • Jonathan:
    • fixed atlasbackup problems on some nodes
    • new version of tier1-nagios-plugins RPM
    • killed many lftp processes on install02
    • Nagios configuration updates
  • James A:
    • Monday-Wednesday: Tier1 OPB and Open-Day Tours
    • Continued SL54 upgrade.
    • Some work on BMS-ARTEMIS-NAGIOS integration with Operations.
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Decommissioning old batch systems.(R 27)
    • install01 faulty heatsink fan.(Intervention)

Absences

  • Jonathan on partial retirement (not in on Monday and Friday); also 1 day Annual Leave (Wed 31/3)

Operational Issues and Incidents

Index Description Start End Severity Affected VO(s)

Summary of plans for week ahead

Scheduled and Cancelled Down Times

Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB

Component Description Start End Affected VO(s) Type

Development priorities

  • All
  • Martin:
  • Ian:
  • Tim:
    • new ASD hardware into production
    • DMF disk areas newwd enlarging
    • T10K on castor - testing finalised
    • T10K on castor - New tape servers installed
  • Cheney:
    • job plan
  • James T:
    • Viglen09 testing
    • Chase up Streamline09 disk
    • TOASTER prep
    • SL5 disk server build
  • Jonathan:
    • Nagios configuration updates
    • continue reconfiguration of nagios06
    • continue work on disposal of old kit from A1 Upper machine room
  • James A:
    • Finish SL54 Upgrade on WNs.
    • Benchmark and calculate scaling factors for Viglen 2009 WNs so they can go into production.
    • Provide network cables for new ADS racks.
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Continuous decommissioning old batch systems.(R 27)

Absences

  • Everyone away on Bank Holiday Monday
  • Jonathan on partial retirement (not in on Monday and Friday)
  • James T on Annual Leave Tuesday.

Fabric On-Call

Advanced Warning of Requirements and Blocking issues

Services Issues


RAL Tier1 weekly operations fabric

Category:RAL_Tier1