Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • CMS disk/tape separation workshop [Done]
    • ARC CE + HTCondor testing
    • APR/workplan [Done]
    • CMS processing
  • Coming week:
    • ARC CE + HTCondor setup & testing
    • CMS processing

Catalin

  • Last week
    • phys.vo.ibergird.eu added to non-LHC CVMFS stratum-0
    • submitted Job Plan 2013
    • cvmfs stratum-0 tools integrated into Quattor
  • This week
    • Erasmus proposal - CVMFS client tool
    • look into WLCG VOBOX instalation for Alice, LHCb
    • look into CVMFS v2.1.x (stratum-1)

Ian

  • Last week:
    • visited CERN - attended GDB
    • Discussions with Jakob re cvmfs 2.1.x testing
    • Tier 1 review
    • APRs & workplans
  • Coming week:
    • Attending StratusLab/Quattor workshop at LAL
    • Reviewing Atlas outpost plans
    • investigate fix for new QWG vo/functions issue

James

  • Last Week
  • This Week

Orlin

  • Last Week
  • This Week

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Grid OnCall: Andrew (Mon-Sun)

Absences

James Tues-Weds (Workshop @ Daresbury)

Ian, Orlin Weds-Fri (StratusLab Workshop @ LAL)