Operational Issues

Description Start End Affected VO(s) Severity Status

Downtimes

Description Hosts Type Start End Affected VO(s)

Blocking Issues

Description Requested Date Required By Date Priority Status

Developments/Plans

Highlights for Tier-1 Ops Meeting

Highlights for Tier-1 VO Liaison Meeting

Detailed Individual Reports

Andrew

  • Last week:
    • SLURM batch system testing
    • GridPP/HLT farm cloud testing
    • xrootd diagram for ISGC talk
    • MyProxy certificate issue; various FTS changes
    • Submitted change control for changing niceness; testing
    • CMS processing
  • Coming week:
    • Performance management course (all Thursday)
    • WLCG accounting for February
    • Batch system testing (mainly SLURM)
    • Upgrade FTS3
    • Deploy niceness change to batch farm; change production MyProxy certificate
    • CMS processing

Catalin

  • Last week
    • prepared site BDII migration to EMI-2
    • prepared WMS migration to EMI-2
    • installed lcgsbdii01 as EMI-2 SL5 site-BDII
    • installed lcgwms04 as EMI-2 SL5 WMS
  • This week
    • install lcgsbdii02 as EMI-2 SL5
    • install and configure lcgwms05, lcgwms06 as EMI-2 SL5 WMS
    • look into ncm-yaim component

Ian

  • Last week:
    • Follow up from public engagmenet meeting
    • Quattor Workshop
    • Prepared OS templates for SL59
  • Coming week:
    • Prep for travel
    • pre=GDB (cloud computing discussions)
    • GDB
    • Travel to ISGC
    • dCache workshop (Sunday)

James

  • Last Week
  • This Week

Orlin

  • Last Week
    • A/L
  • This Week
    • Upgrade and Test the latest CREAMCE update [to do]
    • Ask Adrian & learn about Stratus Lab functionality [to do]
    • Replace the backup CLUSTER host lcgvm04 with lcgcluster02 [to do]
    • Add 2012 gen subclusters to the CLUSTER configuration [to do]
    • Bring the Testbed back in order, check the list of services [ongoing]
    • Install & Test Latest EMI2 update for SL5 production WNs [testing ongoing]
    • Learn more about Cloud computing - Open Nebula; EC2; OpenStack & do some tests [ongoing]
    • Prepare & Install Open Nebula on a physical host suitable for virtualization [ongoing]

VO Reports

ALICE

ATLAS

CMS

LHCb

OnCall/AoD Cover

OnCall Rota

  • Grid OnCall: Catalin (Mon-Sun)

Absences

Ian Tues-Weds (pr-GDB & GDB) Ian Thus-Fri (travel to Taipei for ISGC)