RAL T1 weekly ops Fabric 20110829

From GridPP Wiki
Jump to: navigation, search

Developments

  • All:
  • Tim:
  • James A:
  • Cheney


  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Decommissioning old disk servers/batch systems.
    • Catch-up with John Kelly.
    • Update hardware spread sheet.
    • gdss581 multiple drives failure.
    • gdss240 re-create raid array.
    • Update firmware on 7 Viglen 2007 Amd disk server and re-create raid array.
    • Start acceptance testing on 7 Viglen 2007 AMD disk servers.


  • Martin:
  • Ian:


Operational Issues and Incidents

Index Description Start End Severity Affected VO(s)

Summary of plans for week ahead

Scheduled and Cancelled Down Times

Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB

Component Description Start End Affected VO(s) Type

Development priorities

  • All
  • Tim:
  • Cheney
  • James A:
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Hardware failure review and metrics continue.
    • Continuous decommissioning old disk servers/batch systems.(R 27)
    • Continue Labelling racks and systems in UPS and HPD room.


  • Martin:
  • Ian:

Absences


Fabric On-Call

Advanced Warning of Requirements and Blocking issues

Services Issues


RAL Tier1 weekly operations fabric

Category:RAL_Tier1