RAL T1 weekly ops Fabric 20110523

From GridPP Wiki
Jump to: navigation, search

Developments

  • All:
  • Tim:
  • James A:
  • Cheney
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Decommissioning old batch systems.(R 27)
    • quattor02 updated BIOS.
    • Viglen 2007 all disk servers firmware update. (ongoing)
    • Update firmware on Jetstor systems.(ongoing) Updated on three.
    • gdss432 replaced memory.
    • Add (SL09, V09 and SL10) in Adaptec Storage Manager for monitoring. (Ongoing)
    • Prepare for SL08 testing review.
    • gdss294 replaced raid card and re-created raid array.
    • gdss293 re-created raid array.
    • Dell system from Castor Rack H replaced motherboard and IDRAC by Dell engineer.
    • gdss515 replaced fan. (Back into production)
    • gdss94 given back to Castor team.


  • Martin:
  • Ian:


Operational Issues and Incidents

Index Description Start End Severity Affected VO(s)

Summary of plans for week ahead

Scheduled and Cancelled Down Times

Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB

Component Description Start End Affected VO(s) Type

Development priorities

  • All
  • Tim:
  • Cheney
  • James A:
  • Kash:
    • Drive replacement.
    • Fixing broken WNs.
    • Hardware failure metrics continue.
    • Continue SL08 testing.
    • Continuous decommissioning old batch systems.(R 27)
    • Continue Labelling racks and systems in UPS and HPD room.


  • Martin:
  • Ian:

Absences

Fabric On-Call

  • Monday - Sunday

Advanced Warning of Requirements and Blocking issues

Services Issues


RAL Tier1 weekly operations fabric

Category:RAL_Tier1