RAL Tier1 Production Team Report for 16th August 2010.

AoD This Week

Mon & Tues: John Wed: Tiju Thu: Gareth Thu: Tiju

Last week

  • Gareth: AoD (1 day), EMCvUPS issues, Job Plan into SSC, Looking at batch scheduling.
  • John: A/L (3 days), Updating Nagios tests for Castor 2.1.9.
  • Tiju: AoD (1 day), Modem script tests, understanding iSCSI/Hyper-V/Windows 2008

Changes to Operating procedures

  • None (but note temporary arrangements for Networks callout).

Declared Outages in GOC DB

  • 12 - 19 August: WMS03 update to version 3.1.29-0. From the start of the Outage until Tuesday 17th August (10:00 UTC) WMS03 will be in draining mode when existing jobs will be allowed to finish and output retrieved.
  • 17 August: At Risk on Top-BDII for glite update.

Advanced Warning

  • Day not specified: Test of seal under 1st floor kitchen.
  • Wed/Thu 1/2 September: Possible transformer checks in R89 (during LHC technical stop).
  • Weekend 2/3 October: Power outage in atlas building.
  • Update WNs (glite update)
  • Replace RAL site-level BDII servers
  • Update RAID controller firmware on all Streamline 2008 disk servers
  • Replace SURE with new callout script.
  • Migrate Nagios checks for batch workers to new slave server
  • Update imapd X509 certificate on PAT

Other Changes

  • Fabric:
    • Double the network link to the tape robot stack (stack 12), postponed from the last TS. (Requires Castor stop).
    • Swap out the older of the pair of SAN switches in the Tier1 Oracle databases for its new replacement. (Requires FTS, LFC, 3D stop).
    • New kernels and glibc updates on non-castor Oracle RAC nodes. (Done for LUGH).
    • Updates to amanda backup - unblocking possible other updates.
  • Database:
    • Re-visit non-Castor database mulitpathing
  • Grid Services:
    • None apart from those listed above.
  • Castor:
    • Possible SRM update
    • Castor 2.1.9 upgrade
  • Networks:
    • Commissioning OPN link