Production Team Report 2010-07-12

From GridPP Wiki
Jump to: navigation, search

RAL Tier1 Production Team Report for 14th July 2010.

AoD This Week

Mon: John Tues: Gareth Wed: John Thu: Tiju Fri: John

Last two weeks

  • Gareth: AoD (3 day), WLCG workshop (preparation of talk), Post Mortem of CMS data loss, safe manual handling course.
  • John: AoD (5 days), WLCG workshop, looking at Nagios checks for Castor 2.1.9.
  • Tiju: A/L (last two weeks)

Changes to Operating procedures

  • Note: Further changes to disk server intervention procedure - extra check between Fabric & Castor representatives before action that would delete data.

Declared Outages in GOC DB

  • July 19-22 NEW LHC Technical Stop Dates. Transformer checks. (Site At Risk). TX1 & TX4. At Risk on whole Tier1 from 08:30 on Monday 19th to 17:00 on Thursday 22nd July. (May not take place as planned!)

Advanced Warning

  • Today (12th July) - WAN tuning on LHCb disk servers.
  • Thursday 15th July (tbc): Multipath configuration update for OGMA (10 - 2)
  • Monday 19th July (tbc): Multipath configuration update for LUGH (10 - 2)
  • Tuesday 20th July (tbc): Multipath configuration update for OGMA (10 - 2)
  • Monday 19th July: New robot controller brought into use.
  • Tuesday 20th July: Microcode update for tape robot
  • 2nd August: Stop SL4 batch service. (Turn off SL3 UIs)
  • Not yet scheduled: Restrict access to FTS & LFC databases via Oracle 'ACLs'

Other Changes

  • Fabric:
    • Double the network link to the tape robot stack (stack 12), postponed from the last TS. (Requires Castor stop).
    • Swap out the older of the pair of SAN switches in the Tier1 Oracle databases for its new replacement. (Requires FTS, LFC, 3D stop).
    • New kernels and glibc updates on non-castor Oracle RAC nodes. (Done for LUGH).
  • Database:
    • None
  • 'Grid Services:
    • Add Quatorised BDII to Top-BDII set. (Below threshold for technical stop).
  • Castor:
    • Possible SRM update
  • Networks:
    • Commissioning OPN link