Production Team Report 2009-12-21
From GridPP Wiki
Contents
RAL Tier1 Production Team Report for 21st December 2009.
AoD This Week
Mon-Wed: Tiju Thu: Gareth
Last Week
- Gareth: AoD (1.5days), GridPP review, Change Control, Review of Post Mortems, 1 day A/L.
- John: Prepared CRL update; Looked at patching chkrootkit; Followed up a number of tickets; Extracted Wiki (and documented procedures for this). ESciece dinner.
- Tiju: AoD(3.5 days), OPN investigation, compiled and configured alpine for dutyadm mail
Changes to Operating procedures
- Change Control system up and running.
Declared Outages in GOC DB
- lcgvo0597 17/12 to 31/01 This SL4 VOBOX machine is being replaced by a SL5 VOBOX (lcgvo-alice). Created a long scheduled d/time and then will be removed from GOCDB.
- Castor & CEs: 21/12. For reboot of disk servers.