Operations Report 30/01/2012

From GridPP Wiki
Jump to: navigation, search

Summary of Previous Week

  • 3D: Setting 3D Lugh for 11g uppgrade
  • CASTOR: Gen and ATLAS SRM ugraded to 2.11
  • CASTOR: Testing on 2.1.11 upgrade testing
  • CASOTR: Testing on the Transfer Manager
  • CASTOR: Preparation for final SRM upgrade for LHCb

Operational Issues and Incidents

  • N/A

Plans for Week(s) Ahead

  • 3D: 11g Upgrade
  • CASTOR: Transfer Manager testing
  • CASTOR: Upgrade LHCb SRM


Downtimes and At Risk

Description Start End Affected VO(s) Type
3D 11g Upgrade 31/01/2011 09:00 31/01/2011 16:00 LHCb Downtime
LHCb SRM upgrade 1/02/2011 10:00am 1/02/2011 12:00pm LHCb Downtime

Development Priorities

  • Test and migrate to new HW
  • Migrate to 11G
  • GC resilience

Requirements and Blocking Issues

  • None


OnCall

  • Carmine

Absences

  • N/A