Summary of Previous Week
- 3D: Ogma (3D ATLAS conditions) upgraded to 11g
- CASTOR: CMS SRM upgraded
- CASTOR: ATLAS SRM Upgrade rolled back (rescheduled)
- CASTOR: Deploying non-idle wait time test (ongoing)
- CASTOR: Certification patched with January PSU
Operational Issues and Incidents
N/A
Plans for Week(s) Ahead
- CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
- 3D: Preparation for LHCb 11g upgrade
- CASTOR: Calculate thresholds for non-idle wait time test
- CASTOR: Patch pre-prod with January PSU
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|
Development Priorities
- Test and migrate to new HW
- Migrate to 11G
- GC resilience
Requirements and Blocking Issues
- New hardware for primary CASTOR (waiting on Fabric)
OnCall
- Rich
Absences
Adrian: Mon
Eddy: Mon-Wed