Summary of Previous Week

  • 3D: Ogma (3D ATLAS conditions) upgraded to 11g
  • CASTOR: CMS SRM upgraded
  • CASTOR: ATLAS SRM Upgrade rolled back (rescheduled)
  • CASTOR: Deploying non-idle wait time test (ongoing)
  • CASTOR: Certification patched with January PSU

Operational Issues and Incidents

N/A

Plans for Week(s) Ahead

  • CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
  • 3D: Preparation for LHCb 11g upgrade
  • CASTOR: Calculate thresholds for non-idle wait time test
  • CASTOR: Patch pre-prod with January PSU

Downtimes and At Risk

Description Start End Affected VO(s) Type

Development Priorities

  • Test and migrate to new HW
  • Migrate to 11G
  • GC resilience

Requirements and Blocking Issues

  • New hardware for primary CASTOR (waiting on Fabric)


OnCall

  • Rich

Absences

Adrian: Mon