Operations Report 19/12/2011

From GridPP Wiki
Jump to: navigation, search

Summary of Previous Week

  • 3D: Plan to upgrade to 11g (23rd to 26th January 12)
  • CASTOR: ATLAS SRM now running on new production hardware
  • CASTOR: DLF partitioning now fixed

Operational Issues and Incidents

  • CASTOR: Neptune3 instance suffered extremely high load (decision take to migrate ATLAS SRM)
  • CASTOR: Pluto database hang while trying to recompile invalid object

Plans for Week(s) Ahead

  • CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
  • 3D: Testing 11g upgrade


Downtimes and At Risk

Description Start End Affected VO(s) Type

Development Priorities

  • Test and migrate to new HW
  • Migrate to 11G
  • GC resilience

Requirements and Blocking Issues

  • None


OnCall

  • Rich until the 28th Dec
  • Carmine: 29Dec-08Jan

Absences

Keir: whole week Carmine: Wed-Fri Eddy: Thu All: back on the 3rd Jan