Operations Report 12/07/2010

From GridPP Wiki
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: Reinstalled DLF on PreProd
  • CASTOR: Reboots of nodes to fix read only file systems
  • CASTOR: Work on going for the schema cleanup plan
  • LFC/FTS: The test to check the ACL list of nodes that can connect to the database(Somnus) is done
  • DB Services: RMAN test recovery script to automatically check database backup is done (version v1.0)

Operational Issues and Incidents

None

Plans for Week(s) Ahead

  • CASTOR: Plan Schema Clean Ups (to be carried out before 2.1.9 upgrade)
  • DB Services: Install the new Grid Control
  • DB Services: Modify the RMAN test recovery script to work with database backup files on tape
  • FTS/LFC: Plan to migrate to a single disk array
  • 3D (Ogma): Roll out multipath configuration

Downtimes and At Risk

None


Development Priorities

  • Install ATLAS TAGs to 64bit systems
  • Investigate hardware architecture, backup and recovery strategy, resilience and validation of restored backup.
  • Automate restoration of database backup files from tape

Requirements and Blocking Issues

  • Waiting for new hardware for CASTOR databases
  • Waiting for test environment to test new multipath configuration

OnCall

  • Rich

Absences

  • Eter: Tuesday