Operations Report 09/05/2011

From GridPP Wiki
Jump to: navigation, search

Summary of Previous Week

  • CASTOR: Fixed splitting Services
  • CASTOR: Tested quarterly patches (+ CERN recommended) on Pre-Prod
  • CASTOR: Installing new RAC in ATLAS building for Data Guard testing
  • CASTOR: Adjusting alerts from Grid Control for blocking session problems
  • CASTOR: Applied quarterly patches to Neptune production RAC
  • CASTOR: Installed schemas for the Name Server reports
  • 3D: Tested patches
  • FTS/LFC: Tested patches

Operational Issues and Incidents

  • Uranus (DLF server) down (intermittent SCSI errors)

Plans for Week(s) Ahead

  • CASTOR: Install Oracle on new hardware in ATLAS (once switched is replaced)
  • CASTOR: GEN SRM Upgrade (Tuesday)
  • 3D: Patching
  • LFC/FTS:Patching

Downtimes and At Risk

Description Start End Affected VO(s) Type
3D Patching 10/05/11 at 09:00am 10/05/11 at 11:00am ATLAS and LHCb At Risk
LFC/FTS patching 12:00pm 02:00pm All At Risk

Development Priorities

  • Test and migrate to new HW

Requirements and Blocking Issues

  • Waiting for hardware for Tier1 Data Guard testing


OnCall

  • Carmine

Absences

  • Rich - Wednesday/Thursday
  • Keir - Thursday