Operations Report 04/06/2010
From GridPP Wiki
Contents
Summary of Previous Week
- Castor: Investigating Tape Restores
- Castor: Upgrade Pre-Prod to 2.1.8-18
- Castor: Investigating ways to improve backups strategy to optimise space and recovery time
- Castor: Preparation purchaising plan for Castor hardware
- Castor: Preparation hardware migration plan for Castor databases
- LFC/FTS: Data Guard testing is almost finished
- 3D: Apply Apr PSU
- LFC/FTS: Attempt to apply Apr PSU and rolling it back due to Oracle bug
- Castor: PL/SQL training
Operational Issues and Incidents
- Castor: blocking session from ATLASSRM due to hanging daemon host
Plans for Week(s) Ahead
- Castor: Tape backup restoration
- Castor: Preparation hardware migration plan for Castor databases
- Castor: apply Jan PSU on Vulcan (pre-prod) in a month
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|---|---|---|---|
Rebalance of diskgroups. | 08.06.2010 08:00 | 08.06.2010 11:00 | 3D LHCb database | transparent |
Development Priorities
- Install ATLAS TAGs to 64bit systems
- Investigate ORACLE replication technique for LFC/FTS resilience
- Investigate hardware architecture, backup and recovery strategy, resilience and validation of restored backup.
Requirements and Blocking Issues
- Waiting for new hardware for CASTOR databases (have some progress but still waiting)
- Waiting for test environment to test new multipath configuration
OnCall
- Eter
Absences
- Carmine on CRISTAL course from Monday to Wednesday
- Eter on UKOUG conference on Thursday
- Keir on Annual Leave from Thursday