Search results

Jump to: navigation, search
  • * CMS: Scale testing of HTCondor and GlideinWMS by OSG - various issues. Reminder: Participate in space moni
    39 KB (4,711 words) - 03:39, 21 October 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee
    40 KB (4,976 words) - 10:25, 27 October 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    42 KB (5,228 words) - 10:37, 4 November 2014
  • ...ed. More volunteer sites needed. DB designed to hold verification results. HTCondor testing request from ATLAS. MW Package Reporter designs discussed. Next mee ...Es. These are now largely resolved. The final fix being to move to per-job HTCondor history files.
    48 KB (6,138 words) - 09:19, 10 November 2014
  • * Ian circulated information about an [https://indico.cern.ch/event/272794/ HTCondor workshop] 8th/9th December. Vidyo will be available. If you have strong rea ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    39 KB (4,698 words) - 18:46, 16 November 2014
  • ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL
    41 KB (5,123 words) - 10:02, 1 December 2014
  • ...ng to HTCondor should be aware there are prototype APEL parsers in use for HTCondor so if you continue using CREAM as your CE then you can continue to use APEL ...et. Not much news, but Andrew L has a plan to discuss the problem with the HTCondor devs at CERN when he's there. On Hold (27/11)
    50 KB (6,536 words) - 00:08, 7 December 2014
  • * This week 8th-9th December there is an [http://indico.cern.ch/event/272794/ HTCondor workshop taking place] - Vidyo is available and most talks are being upload
    40 KB (4,992 words) - 19:01, 15 December 2014
  • ...unnecessary ticket filing. Gareth noted that the full migration to ARC and HTCondor, which should see the end of these issues, will hopefully be completed by t
    117 KB (18,736 words) - 11:05, 4 January 2016
  • * This week 8th-9th December there is an [http://indico.cern.ch/event/272794/ HTCondor workshop taking place] - Vidyo is available and most talks are being upload
    44 KB (5,642 words) - 20:59, 21 December 2014
  • |HTCondor
    3 KB (378 words) - 09:57, 27 June 2017
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    48 KB (6,074 words) - 10:36, 16 March 2015
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    44 KB (5,438 words) - 08:48, 23 March 2015
  • ** Temporary ATLAS solution has been found to publish the HTCondor CEs in the BDII and OIM in a way that satisfies both ATLAS and SAM needs.
    44 KB (5,487 words) - 08:53, 30 March 2015
  • ...2 enabled correctly. This is now done, as it turned out the problem wasn't HTCondor on DIRAC, but CERN's difficulties at installing a new VO.
    19 KB (3,141 words) - 12:14, 27 April 2020
  • * T0 news: batch HTCondor pilot is open for grid submission. Lower-than-usual WLCG availability figur
    46 KB (5,803 words) - 11:48, 16 May 2015
  • * T0 news: batch HTCondor pilot is open for grid submission. Lower-than-usual WLCG availability figur
    46 KB (5,732 words) - 18:32, 23 May 2015
  • ...sed by LIP. A new version of UMD (3.13) has been released. The size of the HTCondor pilot service at CERN is now 300 cores and fully used. Agreed to establish
    46 KB (5,777 words) - 09:41, 20 July 2015
  • | CREAM CEs to be replaced by HTCondor CE (end of May)
    2 KB (318 words) - 15:36, 29 March 2016
  • * Interest in HTCondor CE. (Ops thread 20/08).
    41 KB (5,000 words) - 04:11, 1 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    43 KB (5,351 words) - 16:49, 6 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    44 KB (5,604 words) - 10:22, 15 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    44 KB (5,552 words) - 22:25, 19 September 2015
  • * Interest in HTCondor CE. (Ops thread 20/08).
    45 KB (5,699 words) - 08:31, 28 September 2015
  • ...s at SARA when srm was overloaded by a local user. Working on interface to HTCondor-CE.
    48 KB (6,163 words) - 16:24, 29 November 2015
  • ...s at SARA when srm was overloaded by a local user. Working on interface to HTCondor-CE.
    47 KB (5,899 words) - 20:49, 6 December 2015
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    47 KB (5,834 words) - 10:11, 11 January 2016
  • * [ https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    53 KB (6,920 words) - 15:52, 4 January 2016
  • CMS validation of HTCondor CEs at Bristol - on hold awaiting the accounting getting sorted. On hold (2 CMS validation of the HTCondor CE at Bristol. Still waiting on the accounting getting sorted before things
    150 KB (23,740 words) - 12:54, 9 January 2017
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    51 KB (6,516 words) - 23:59, 18 January 2016
  • ...e the results of the Lightweight Site survey. There will be a sub-topic on HTCondor Accounting.
    46 KB (5,834 words) - 12:12, 28 November 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    47 KB (5,867 words) - 21:18, 31 January 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    46 KB (5,812 words) - 23:00, 8 February 2016
  • * [https://indico.cern.ch/e/Spring2016HTCondorWorkshop Workshop for HTCondor] and ARC CE in Barcelona 29-Feb to 04-Mar 2016]
    54 KB (7,071 words) - 09:10, 15 February 2016
  • Firstly, some basic HTCondor commands are as follows. To submit a job type: Note that lcgui03 and lcgui04 each have their own HTCondor schedd daemon, i.e. job queue. This is means that <code>condor_q</code> and
    5 KB (685 words) - 14:25, 26 February 2016
  • * Workshop on HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016. [https://indico.cern.ch/e/Sp
    43 KB (5,347 words) - 17:58, 6 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st). * Workshop on HTCondor and ARC CE in Barcelona 29-Feb to 04-Mar 2016. [https://indico.cern.ch/e/Sp
    47 KB (6,060 words) - 23:16, 13 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    42 KB (5,278 words) - 01:55, 20 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    44 KB (5,455 words) - 02:03, 29 March 2016
  • * Bristol T2 second site with HTCondor CE (lcgce02.phy.bris.ac.uk) outside the open science grid (CERN 1st).
    44 KB (5,446 words) - 23:24, 3 April 2016
  • * Andrew: HTCondor Machine/Job Features testing? = Request for volunteers please!
    45 KB (5,695 words) - 00:36, 24 May 2016
  • * Andrew: HTCondor Machine/Job Features testing? = Request for volunteers please!
    43 KB (5,401 words) - 01:24, 30 May 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    44 KB (5,505 words) - 16:19, 3 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?. Validation of a new HTCondor CE at Bristol by CMS. At last check Bristol were testing the CERN accountin
    51 KB (6,664 words) - 22:21, 13 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    44 KB (5,489 words) - 22:21, 19 June 2016
  • * Andrew L: HTCondor Machine/Job Features testing?.
    45 KB (5,697 words) - 11:17, 27 June 2016
  • CMS validation of the HTCondor CE at Bristol. Still waiting on the accounting getting sorted before things
    50 KB (6,425 words) - 22:25, 11 July 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    44 KB (5,485 words) - 07:57, 5 September 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor.
    45 KB (5,779 words) - 09:19, 22 August 2016
  • * Kashif: condor upgrade on WN breaks condor_config_val & TotalCpus in HTcondor. CMS validation of HTCondor CEs at Bristol - on hold awaiting the accounting getting sorted. On hold (2
    50 KB (6,392 words) - 07:47, 16 August 2016

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)