Difference between revisions of "RAL Tier1 weekly operations castor 20/1/2017"
(Created page with "== Draft agenda == 1. Problems encountered this week 2. Upgrades/improvements made this week 3. What are we planning to do next week? 4. Long-term project updates (if not ...") |
(→Operation news) |
||
(3 intermediate revisions by one user not shown) | |||
Line 26: | Line 26: | ||
11. AoOtherB | 11. AoOtherB | ||
− | == Operation problems == | + | == Operation problems == |
+ | gdss772 failed and removed from production [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=185050 RT185050] | ||
+ | |||
+ | Problems with the scheduling of transfers following 2.1.5 upgrade of LHCb [https://helpdesk.gridpp.rl.ac.uk/Ticket/Display.html?id=184998 RT184998] | ||
== Operation news == | == Operation news == | ||
Line 33: | Line 36: | ||
lhcb stager upgraded to 2.1.5 | lhcb stager upgraded to 2.1.5 | ||
− | + | To address the problem with the lhcb transfers, the number of TM threads TM | |
+ | and the memory DB has access to were increased | ||
== Plans for next week == | == Plans for next week == | ||
Line 42: | Line 46: | ||
== Long-term projects == | == Long-term projects == | ||
+ | |||
+ | Tape-server migration to aquilon and SL7 upgrade | ||
SRM 2.1.16 upgrade | SRM 2.1.16 upgrade |
Latest revision as of 10:17, 25 January 2017
Contents
Draft agenda
1. Problems encountered this week
2. Upgrades/improvements made this week
3. What are we planning to do next week?
4. Long-term project updates (if not already covered)
1. Castor 2.1.15 2. SL7 upgrade on tape servers
5. Special topics
6. Actions
7. Anything for CASTOR-Fabric?
8. AoTechnicalB
9. Availability for next week
10. On-Call
11. AoOtherB
Operation problems
gdss772 failed and removed from production RT185050
Problems with the scheduling of transfers following 2.1.5 upgrade of LHCb RT184998
Operation news
lhcb stager upgraded to 2.1.5
To address the problem with the lhcb transfers, the number of TM threads TM and the memory DB has access to were increased
Plans for next week
Security patch of lhcb on Mon
CASTOR 2.1.15 upgrade on ATLAS on Tue and on Gen on Thursday
Long-term projects
Tape-server migration to aquilon and SL7 upgrade
SRM 2.1.16 upgrade
Actions
Drain 10% of the 13 generation of disk servers (lhcbDst) for decommissioning
Add GP to the mail of CASTOR overwatch script
Staffing
RA on call next week