Difference between revisions of "RAL Tier1 weekly operations Fabric 20100405"
From GridPP Wiki
James adams (Talk | contribs) |
(No difference)
|
Latest revision as of 13:45, 12 April 2010
Contents
Developments
- All:
- Martin:
- Ian:
- Tim:
- sort out ADS mess after weekend
- get dougal back into production after engineer intervention
- Rhubarb - get new disk into operation
- Cheney:
- Building new robot controller
- sort out atlasbackup space problem
- cleaning the machine room
- updates to docco on wiki
- move cdbd03 to new chassis with proc and memory upgrade
- replace psu kevin's array (preprod)
- replace drive vtl
- James T:
- Tier1 tours for open day and OPB events.
- Viglen09 testing.
- A/L Wednesday and Thursday
- Jonathan:
- fixed atlasbackup problems on some nodes
- new version of tier1-nagios-plugins RPM
- killed many lftp processes on install02
- Nagios configuration updates
- James A:
- Monday-Wednesday: Tier1 OPB and Open-Day Tours
- Continued SL54 upgrade.
- Some work on BMS-ARTEMIS-NAGIOS integration with Operations.
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Decommissioning old batch systems.(R 27)
- install01 faulty heatsink fan.(Intervention)
Absences
- Jonathan on partial retirement (not in on Monday and Friday); also 1 day Annual Leave (Wed 31/3)
Operational Issues and Incidents
Index | Description | Start | End | Severity | Affected VO(s) |
---|
Summary of plans for week ahead
Scheduled and Cancelled Down Times
Type=Down/At Risk/Cancelled entries in/planned to go to GOCDB
Component | Description | Start | End | Affected VO(s) | Type |
---|
Development priorities
- All
- Martin:
- Ian:
- Tim:
- new ASD hardware into production
- DMF disk areas newwd enlarging
- T10K on castor - testing finalised
- T10K on castor - New tape servers installed
- Cheney:
- job plan
- James T:
- Viglen09 testing
- Chase up Streamline09 disk
- TOASTER prep
- SL5 disk server build
- Jonathan:
- Nagios configuration updates
- continue reconfiguration of nagios06
- continue work on disposal of old kit from A1 Upper machine room
- James A:
- Finish SL54 Upgrade on WNs.
- Benchmark and calculate scaling factors for Viglen 2009 WNs so they can go into production.
- Provide network cables for new ADS racks.
- Kash:
- Drive replacement.
- Fixing broken WNs.
- Continuous decommissioning old batch systems.(R 27)
Absences
- Everyone away on Bank Holiday Monday
- Jonathan on partial retirement (not in on Monday and Friday)
- James T on Annual Leave Tuesday.