Operations Team Action items

From GridPP Wiki
Jump to: navigation, search

Count list for minute taking

Works left -> right. EVO meeting = 1: F2F meeting = 5 I've now added the last time minutes were taken in brackets.

IN: Duncan=10 Sam=10 Stephen=11 Chris=9 Kashif=11 Wahid=11 Pete=10 Daniela=12 (10.3.15) Andrew=10 Matt=11 David=11 Alessandra=11 Brian=11 Jeremy=12 Ewan=12 OUT: Mark=6 Minutes can be found at: UKI-ROC agenda

Action list

Action ID Action description Owner Target date Status Date closed Notes
O-120410-01 Some Action Some person 25-012-2012 Some status 25-012-2024 Template
O-140303-08 Follow up with SNO+ on https://ggus.eu/?mode=ticket_info&ticket_id=109694 Gareth/Matt 10-03-2014 Open
O-140303-07 create a DIRAC overview schematic and include information on the VM approach. Tom 10-04-2014 In progress. This can be found here. Comments welcome.


O-140303-06 review Matt’s networking (perfSONAR) issues to Storage Group Meeting Duncan 11-03-2014 Open Only if they impact production work not if they are perfsonar only.
O-140303-05 Look into perfsonar dashboards. And data extraction meeting. Jeremy 10-05-2014 In progress Testing and evaluation of the pilot instances for esmond/maddash ongoing as psds.grid.iu.edu and psmad.grid.iu.edu. The production instance of the infrastructure monitoring is at psomd.grid.iu.edu. Data extraction meeting slides: https://indico.cern.ch/event/377034/material/slides/1.pdf (see slides 1 and 2 only).


O-140303-03 check 'pap-admin lp' works and if not fix All sites 10-05-2014 Open -> Closed ? fix by updating argus
O-140303-02 Review Argo monitoring within UK NGI David and Frederico 10-05-2014 Open


O-140506-02 Puppet config to make cvmfs changes once for all relevant VOs Kashif Open ? Currently, when updating cvmfs information, it has to be done per VO rather than doing it once which then propagates as appropriate. CAN SOMEONE CHECK IF THIS HAS ACTUALLY BEEN DONE?


0-140812-01 RIPE probe deployment Jeremy (?) 2014-08-20 In Progress Discuss deployment of RIPE probes with sites at GridPP 33 -> Becomes (March 2015) chase the sites which still need to install RIPE probes that they were given at GridPP33. Sites remaining to install: ECDF



0-141216-02 Tom, Jeremy, Lancaster lads 2014-12-16 Open Engage with new northgrid VO members from UCLAN.

See also: Operations Team Completed Actions and Operations Issues .

See also the archived: Deployment Team Completed Actions and Deployment Issues .