Difference between revisions of "Operations Team Action items"
From GridPP Wiki
(→Count list for minute taking) |
(→Action list) |
||
Line 68: | Line 68: | ||
| Testing and evaluation of the pilot instances for esmond/maddash ongoing as psds.grid.iu.edu and psmad.grid.iu.edu. The production instance of the infrastructure monitoring is at psomd.grid.iu.edu. Data extraction meeting slides: https://indico.cern.ch/event/377034/material/slides/1.pdf (see slides 1 and 2 only). | | Testing and evaluation of the pilot instances for esmond/maddash ongoing as psds.grid.iu.edu and psmad.grid.iu.edu. The production instance of the infrastructure monitoring is at psomd.grid.iu.edu. Data extraction meeting slides: https://indico.cern.ch/event/377034/material/slides/1.pdf (see slides 1 and 2 only). | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
Line 125: | Line 117: | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
|- | |- |
Revision as of 12:52, 10 March 2015
Count list for minute taking
Works left -> right. EVO meeting = 1: F2F meeting = 5 I've now added the last time minutes were taken in brackets.
IN: Duncan=10 Sam=10 Stephen=11 Chris=9 Kashif=11 Wahid=11 Pete=10 Daniela=12 (10.3.15) Andrew=10 Matt=11 David=11 Alessandra=11 Brian=11 Jeremy=12 Ewan=12 OUT: Mark=6 Minutes can be found at: UKI-ROC agenda
Action list
Action ID | Action description | Owner | Target date | Status | Date closed | Notes | ||
---|---|---|---|---|---|---|---|---|
O-120410-01 | Some Action | Some person | 25-012-2012 | Some status | 25-012-2024 | Template | ||
O-140303-08 | Follow up with SNO+ on https://ggus.eu/?mode=ticket_info&ticket_id=109694 | Gareth/Matt | 10-03-2014 | Open | ||||
O-140303-07 | create a DIRAC overview schematic and include information on the VM approach. | Tom | 10-04-2014 | In progress. | This can be found here. Comments welcome.
| |||
O-140303-06 | review Matt’s networking (perfSONAR) issues to Storage Group Meeting | Duncan | 11-03-2014 | Open | Only if they impact production work not if they are perfsonar only. | |||
O-140303-05 | Look into perfsonar dashboards. And data extraction meeting. | Jeremy | 10-05-2014 | In progress | Testing and evaluation of the pilot instances for esmond/maddash ongoing as psds.grid.iu.edu and psmad.grid.iu.edu. The production instance of the infrastructure monitoring is at psomd.grid.iu.edu. Data extraction meeting slides: https://indico.cern.ch/event/377034/material/slides/1.pdf (see slides 1 and 2 only).
| |||
O-140303-03 | check 'pap-admin lp' works and if not fix | All sites | 10-05-2014 | Open | fix by updating argus | |||
O-140303-02 | Review Argo monitoring within UK NGI | David and Frederico | 10-05-2014 | Open | ||||
O-140303-01 | contact Catalin regarding a discussion next week on CVMFS | Jeremy | 10-03-2014 | Closed | Catalin will attend on 10th March and give a summary of the UK CVMFS status and provide a review of the CVMFS workshop. | |||
O-140506-02 | Puppet config to make cvmfs changes once for all relevant VOs | Kashif | Open ? | Currently, when updating cvmfs information, it has to be done per VO rather than doing it once which then propagates as appropriate. CAN SOMEONE CHECK IF THIS HAS ACTUALLY BEEN DONE?
| ||||
0-140812-01 | RIPE probe deployment | Jeremy (?) | 2014-08-20 | In Progress | Discuss deployment of RIPE probes with sites at GridPP 33 -> Becomes (March 2015) chase the sites which still need to install RIPE probes that they were given at GridPP33. | Sites remaining to install: ECDF
| ||
0-141216-02 | Tom, Jeremy, Lancaster lads | 2014-12-16 | Open | Engage with new northgrid VO members from UCLAN. |
See also: Operations Team Completed Actions and Operations Issues .
See also the archived: Deployment Team Completed Actions and Deployment Issues .