Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,523 intermediate revisions by 38 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 27th July 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 4th August'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* [http://www.gridpp.ac.uk/gridpp35/index.html GridPP35 registration] closes tomorrow (5th August).
+
** https://indico.cern.ch/event/776832/
*  
+
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
  
'''Tuesday 28th July'''
+
'''Tuesday 11th June'''
* Science Board has convened... but the GridPP outcome will not be announced for some weeks. We should know by the GridPP35 meeting.
+
 
* GGUS was down at the weekend due to an unscheduled downtime.
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* Winnie: minor VOs sending to queues they're not allowed to after re-YAIM of CREAM CE. (24/07)
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* Brian: automating storage dumps and uploads for ATLAS to be extended to T2s ( possibly)
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
* LSST French CVMFS does not 'UK' software so is of limited use.
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
* The DIRAC server outage (also IC top BDII) - lessons learned and resilience options.
+
<!-- ***********************Start General text*********************** ----->'''
* Dan: how would you set up an xrootd server for another vo like snoplus? (22/07). Relates to Remote loading of Grid files for SNO+.
+
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
 +
 
  
'''Tuesday 21st July'''
 
* Various requests (e.g. via EGI) to express interest in "Compute Resources for PanCancer Analysis of Whole Genomes" call.
 
* MM raised a question about remote loading of Grid files for SNO+ (email 20th July).
 
* From Winnie: yaim on CREAM-CE - no update of var/lib/bdii/gip/ldif/ files. Should it?
 
* From Catalin (16th July): The decommissioning process of the 'gridpp.ac.uk' CVMFS space is about halfway, and it came to my attention the fact that sites are defining the CVMFS_REPOSITORIES variable at WN level. Whilst this variable was mandatory with cvmfs v2.0.X, this is not case with v2.1.Y. I would ask site admins to remove the 'gridpp.ac.uk' repository names from there, except the regional UK VO repositories (londongrid, scotgrid, southgrid, north grid)
 
* /cvmfs/gridpp-vo help. Down to the repository? Is more documentation needed here?
 
* Atlas ADC meeting containing discussion of the future of cloud support is at 4.30 on the 21st of July, and sites are welcome to attend.
 
* For those who missed it: [arxiv.org/abs/1507.03414 observation of a new particle with LHCb]! Also see the [http://lhcb-public.web.cern.ch/lhcb-public/Welcome.html#Penta press release].
 
* [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2587 Minutes of the last EGI operations meeting] are now available.
 
* Process for uploading files to CVMFS.
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 60: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 67: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 4th August'''
+
'''Tuesday 11th June'''
* There was a WLCG ops coordination meeting on Thursday 30th July:  [https://indico.cern.ch/event/393612/ Agenda] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150730 Minutes].
+
 
* News: Reminder of [https://ggus.eu/?mode=docu GGUS documentation] (and features like SOAP interface and report generator). There is a new [http://wlcg-ops.web.cern.ch ops portal]. See [http://wlcg-ops.web.cern.ch/article/06-2015/welcome-new-wlcg-operations-coordination-portal this explanation]. Feedback welcome/requested.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* MIddleware: dCache 2.6.x support ended in May. Decommission by 21st September ([https://wiki.egi.eu/wiki/Software_Calendars#dCache_v._2.6.x Calendar]). [https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/libuser-2015-07-24 Critical vulnerability affecting RedHat 5, 6 and 7] (access via local user account). [https://access.redhat.com/articles/1537873 Workaround until patched].
+
 
* T0/1 services: JINR, NL-T1 and PIC reported SE upgrades.
+
'''Tuesday 14th May'''
* T0 news: CMS & ATLAS assigned tickets to T0 by mistake. Upgrades for vulnerability underway. Clarification on support units requested.
+
* Next meeting this Thursday.
* T1 feedback: None.
+
 
* T2 feedback: None.
+
'''Tuesday 9th April'''
* ALICE: High activity. Raw data copies in CASTOR timing out at CERN and job submissions have become slow a few times. NDGF reported inefficient data transfers.
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* ATLAS: Tier-0 studies of "slow" nodes (1/2 to 1/3 others). Reviewing Central Service monitoring. Concern at GGUS unscheduled downtime. Kibana was down.
+
 
* CMS: DIGI-RECO using all T1s and 15T2s. Undertaking assignment of custodial location of Primary Datasets to T1 sites. Ops issues: PIC disk oversubscribed. SAM test dataset removed at several sites. HammerCloud monitoring issue affecting several sites. User tickets now in SNOW.
+
 
* LHCb: Ops: Finishing restripping of Run1 data and Run2 50s ramp. [https://ggus.eu/index.php?mode=ticket_info&ticket_id=115027 Problems with LSF and DIRAC]. Looking at Hammercloud testing and perfSONAR data extraction.
+
'''Tuesday 26th March'''
* glexec: NTR
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* RFC proxies: NTR
+
* Next meeting booked for 4th April
* Machine/Job features: Nagios probe running for LHCb SAM. Includes Imperial.
+
 
* MW readiness: ECDF and Grid to will look at CentOS7/SL7 in autumn. [http://indico.cern.ch/event/436138/ Next meeting 16th September].  
+
'''Monday 11th February 2019'''
* Multicore: No report.
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* IPv6: No report.
+
** End of CREAM support Dec 2020.
* Squid monitoring (& HTTP proxy discovery): Alastair has implemented next step.
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
* Network & Transfer metrics: Tested publishing perfSONAR to message bus directly for OSG collector. OSG datastore expected to be in production end July; Testing proximity service; Expt. use cases reviewed; FTS performance studies.  
+
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
* HTTP: NTR
+
** Experiment updates (see ATLAS discussion on DOMA)
* Info system: Implementing [https://twiki.cern.ch/twiki/bin/view/EGEE/AllAboutREBUS#REBUS_known_issues REBUS set of easy fixes]. [https://twiki.cern.ch/twiki/bin/view/EGEE/WLCGISEvolution#Task_Tracking_and_Timeline Set of actions defined].
+
** WG updates (few).
 +
 
 +
 
  
  
'''Tuesday 27th July'''
 
* The next WLCG ops meeting is this Thursday 30th July. [https://indico.cern.ch/event/393612/ Agenda].
 
  
  
Line 110: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 4th August'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-07-29 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* Ongoing testing of worker nodes running a new configuration where they obtain the grid middleware via cvmfs.
+
<!-- *********************************************************** ----->
* There will be an intervention on our faulty router on Tuesday 4th August. This is announced in the GOC DB. The production and Test FTS3 services will be drained of active transfers. The TopBDIIs and Castor will be stopped.
+
* There were two outages of the Tier1 - on Tuesday/Wednesday the 28th and 29th July. Both caused by problems affecting our (single) network router.
+
* Three additional disk servers have been deployed for both CMS and LHCb.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 131: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20150708-minutes.txt Wednesday 08 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Huge backlog of ATLAS data from Glasgow waiting to go to RAL, and oddly varying performance numbers - investigating
+
* DOME upgrade problems at Edinburgh
* How physics data is like your Windows 95 games
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20150701-minutes.txt Wednesday 01 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Feedback on CMS's proposal for listing contents of storage
+
* Rucio reporting
* Simple storage on expensive raided disks vs complicated storage on el cheapo or archive drives?
+
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20150624-minutes.txt Wednesday 24 June]'''
 
* Heard about the Indigo datacloud project, a H2020 project in which STFC is participating
 
* Data transfers, theory and practice
 
** Somewhat clunky tools to set up but perform well when they run
 
** Will continue to work on recommendations/overview document
 
** Worth having recommendations/experiences for different audiences - (potential) users, decision makers, techies
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 151: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 161: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 20th July'''
+
'''Tuesday 6th February'''
* Oxford publishing 0 cores from Cream today. Maybe they forgot to switch one off. [http://goc-accounting.grid-support.ac.uk/apel/jobs2_withsubmithost.html Check here].
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 14th July'''
 
* QMUL and Sheffield appear to be lagging with publishing by a week.
 
* Please check your multicore publishing status (especially those sites mentioned in June).
 
  
'''Tuesday 16th June'''
+
'''Tuesday 30th January'''
* Region not publishing accounting by number of cores.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
** "0" core submission hosts:
+
 
** ce3.dur.scotgrid.ac.uk
+
'''Tuesday 24th Oct'''
** ce4.dur.scotgrid.ac.uk
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
** cetest02.grid.hep.ph.ic.ac.uk
+
 
** hepgrid5.ph.liv.ac.uk
+
** hepgrid6.ph.liv.ac.uk
+
** hepgrid97.ph.liv.ac.uk
+
** svr009.gla.scotgrid.ac.uk
+
** t2ce06.physics.ox.ac.uk
+
  
'''Tuesday 9th June'''
+
'''Monday 16th January'''
* Delay noted for Sheffield
+
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
  
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
  
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 195: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 202: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 28th July'''
 
* Ewan:  /cvmfs/gridpp-vo help ... there's a lot of historical stuff on the GridPP wiki that makes it look a lot more complicated than it is now. We really should have a bit of a clear out at some point.
 
  
'''Tuesday 23rd June'''
+
''' Tue 9th July 2019'''
* Reminder that documents need reviewing!
+
  
'''Tuesday 9th June '''
+
LHCb has added this to their requirements:
  
LSST voms2 records are not present in VOID cards yet.
+
Sites not having an SRM installation must provide:
As a workaround, a temporary note of the actual
+
values has been added to the LSST section of
+
Approved VOs.
+
  
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
New VOMs rpms to match.
 +
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 +
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
  
 
'''General note'''
 
'''General note'''
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 227: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 234: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 13th July'''
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
* There was an EGI Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-13-07-2015 agenda]
+
''' Monday 11th March '''
* URT/UMD updates:
+
** UMD 3.13.0 released on 01.07.2015: http://repository.egi.eu/2015/07/01/release-umd-3-13-0/
+
*** APEL 1.4.1
+
*** Argus PAP v. 1.6.2
+
*** gLExec-wn - v. 1.2.3 (lcmaps and mkdir)
+
*** storm 1.11.8
+
*** fetch-crl 3.0.16
+
*** cream 1.16.5
+
*** dpm-xroot 3.5.2
+
*** Xroot 4.1.1.
+
*** Frontier Squid 2.7.24
+
*** CVMFS 2.1.20
+
*** GFAL2 2.8.4
+
*** GFAL2-PYTHON 1.7.1
+
** UMD 3.13.1 released on 13.07.2015: http://repository.egi.eu/2015/07/13/release-candidate-umd-3-13-1-rc1/ (link was not updated correctly during release)
+
*** ARC Nagios probes 1.8.3
+
  
* SR updates (small because it's summer):
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11
*** gfal2 2.9.1
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
*** storm 1.11.9
+
* DPM Legacy mode is going to end in June 2019
*** srm-ifce 1.23.1....
+
* EGI will open tickets after June
*** gfal2-python 1.8.1
+
* HTCondor CE accounting status?
** In Verification
+
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
*** gfal2-plugin-xrootd 0.3.4
+
  
* Accounting
 
** [John Gordon] "Of the WLCG sites we now have 97%+ of cpu reported with cores. I expect you all saw my recent email to GDB naming 16 sites. If one German and one Spanish site and the four Russians start publishing we will jump to 99%+"
 
** New list of sites needing to update multicore accounting being prepared this evening (Monday) by Vincenzo
 
  
* SL5 decommissioning date March 2016;
+
''' Tuesday 12th February '''
* Next meeting 10th August
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Monday 15th June'''
 
* There was an EGI operations meeting today: [https://wiki.egi.eu/wiki/Agenda-15-06-2015 agenda].
 
* New Action: for the NGIs: please start tracking which sites are still using SL5 services: how many services, and for each service if still needed on SL5, if upgrades on SL5 services are expected). [https://wiki.egi.eu/wiki/SL5_retirement A wiki has been provided to record updates]. Also interesting to understand who is using Debian.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 287: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 +
 
'''Tuesday 16th June'''
 
'''Tuesday 16th June'''
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
Line 293: Line 386:
  
  
''' Tuesday 31st March
 
 
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
 
'''Monday 7th December
 
 
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 314: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th July'''
+
'''Tuesday 5th February'''
* Quiet week, once the (unofficial) ARC fix was implemented on the nagios side.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Low/best efforts ROD effort after this week for 1-2 weeks.
+
* Few availability tickets on hold
 
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
'''Monday 6th July'''
+
* DB: Between the fake ARC alarms and the fake bdii alarms it's hard to see the real alarms.
+
 
+
'''Monday 22nd June'''
+
* Generally quiet. There are some 'glue2' errors that were ticketed. Tried to let these go and see if they would clear. However, in some cases the amount of time the error was outstanding was building up. Unclear if Glue2 is used anywhere.
+
  
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
  
Line 337: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th May'''
+
'''Monday 20th November'''
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 17th March'''
 
* Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
 
* There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
 
* Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.
 
  
'''References'''
+
 
 +
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 361: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 4th August'''
+
'''Tuesday 11th June
* Update on [https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/libuser-2015-07-24 Critical vulnerability affecting RedHat 5, 6, 7 broadcast by EGI CSIRT] EGI CSIRT are intending to turn on monitoring for vulnerable machines (libuser version and mitigation) in next days. Schedule depends on develop/testing the probe. It is understood SL6 library update is due out 3/7/15(Monday). Discussions following this alert are likely to result in some changes/clarification to the alert template.
+
* Next UK Security Team meeting is Weds 4th Aug.
+
 
+
'''Tuesday 27th July'''
+
* [https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/libuser-2015-07-24 Critical vulnerability affecting RedHat 5, 6, 7 broadcast by EGI CSIRT] which allows local root exploit. This vulnerability is present in the case of access via a local user account, so only UIs where access is given via local passwd file could be affected. A fix for the affected package  (libuser) is available for RedHat 6 and 7, but not for Red Hat 5, so sites should either upgrade to a new OS release or apply the [https://access.redhat.com/articles/1537873 workaround described]. According to the CSIRT procedures, sites not upgrading by 31/07 risk site suspension.
+
 
+
'''Tuesday 21st July'''
+
* Most exchanges on statement wording.
+
  
'''Monday 13th July'''
+
* NTR
* EGI SVG/CSIRT **Update** OpenSSL release on 9th July - CVE-2015-1793
+
 
+
'''Monday 29th June'''
+
* EUGridPMA have announced a new set of CA rpms. Based on this IGTF release a new set of CA RPMs have been packaged for EGI. There is a request to please upgrade within the next seven days at your earliest convenience. When this timeout is over, SAM will throw critical errors on CA tests if old CAs are still detected.
+
* The next security team meeting is this Wednesday 1st July.
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 396: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 404: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 14th July'''
+
'''Monday 5th March'''
* GridPP35 in September will have a part focus on networking and IPv6. This will include a review of where sites are with their deployment. Please try to firm up dates for your IPv6 availability between now and September. Please update the [https://gridpp.ac.uk/wiki/IPv6_site_status GridPP IPv6 status table].  
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
  
'''Tuesday 23rd June'''
+
'''Monday 10th September'''
* GridPP issued a position statement regarding LHCONE.  
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
** ...Concerning LHCONE for both T1 and T2. The high level summary is that the UK is not in favour, as within the UK we have no explicit need for LHCONE for any reason of T1 capacity planning, but to implement it involves additional complexity and possibly cost. The current system works fine and we therefore see no overriding reason to remove T1-T1 transit via LHCOPN. ...The UK is sensitive to the “collective” needs of the community, and as a general statement we would always seek to address any legitimate request agreed by the WLCG MB in order to play our role in meeting international expectations.
+
  
'''Tuesday 12th May'''
+
'''Monday 2nd July'''
* LHCOPN & LHCONE joint meeting at LBL June 1st & 2nd. [https://indico.cern.ch/event/376098/ Agenda] taking shape.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
'''Tuesday 31st March'''
 
* Duncan has been giving the IPv6 nodes a push! See [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html Steve's IPv6 transfers page].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 429: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 3rd August 2015, 14.30 BST'''<br />
 
 
23 Open tickets this month, full review time.
 
  
'''Sno+ "glite-wms-job-status warning"''' (3/8)<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
Glasgow: [https://ggus.eu/?mode=ticket_info&ticket_id=115435 115435]<br />
+
Tier 1:  [https://ggus.eu/?mode=ticket_info&ticket_id=115434 115434]<br />
+
Matt M submitted these tickets to Glasgow and the Tier 1 after having trouble with a proportion of Sno+ jobs. Both are being looked at- definitely worth collaborating on this one.
+
 
+
Wiki-leak...<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115399 115399](31/7)<br />
+
Jeremy noticed that the wiki didn't work for him on Friday - but it seems to work for Jeremy, Alessandra and myself now. As Jeremy notes the ticket can be closed, but out of interest did anyone else spot any problems? In progress (3/8)
+
 
+
'''Spare the ROD...'''<br />
+
'''LIVERPOOL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115433 115433] (3/8)<br />
+
Some CE problems noticed on the dashboard for the Liver-lads - who might be in mourning. Assigned (3/8)
+
 
+
'''RALPP & UCL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114764 114764]<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114851 114851]<br />
+
Both of these are "availability" alarm tickets, on-holding until they clear. I hope RALPP managed to get a re-computation for their unfair failures (IGTF-1.65 problems on ARC).
+
 
+
'''Sno+'d Under'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115387 115387] (30/7)<br />
+
I'm uncertain if this Sno+ ticket, probably somewhat related to Matt M's recent thread on TB-SUPPORT and concerning xrootd access, is meant for the Tier 1 or RALPP. Assigned (3/8)
+
 
+
'''First Tier Problems.'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115417 115417] (2/8)<br />
+
LHCB spotted a number of nodes with cvmfs problems at the Tier 1, which the RAL team had already jumped on and repaired this morning. They wonder if the problem persists. Waiting for reply (3/8)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115290 115290] (28/7)<br />
+
An FTS problem requiring some special CA magic to solve, but the current CA-wizard isn't about. On hold (29/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=113836 113836] (20/5)<br />
+
Glue 1 vs Glue 2 queue mismatches. It's being worked on perfecting cluster publishing for ARC CEs, but the ticket could either do with an update or on-holding. In progress (24/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114992 114992] (10/7)<br />
+
CMS transfers failing between RAL and, err, TAMU in the US. Assigned to RAL, where Brian has investigating and Andrew has posed an good question, asking if the user has considered managing the transfers with FTS. Quiet on the user side. In progress (21/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=108944 108944] (1/10/2014)<br />
+
One of the tickets from the before times, about CMS AA access tests. It has become a long and confusing saga, but Gareth rescued it with a handy summary of the issue in his last update. How goes the battle? In progress (17/7)
+
 
+
'''Oxford Squid is red.'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115230 115230] (24/7)<br />
+
Which might be the colour Ewan's seeing right now! The ticket is reopened, with a comment from Alessandra that the current recommendation is to allow all CERN addresses, and asks if this is something Oxford could do. Reopened (3/8)
+
 
+
'''Mavaricks and Gooses - GridPP Pilot roles.'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114485 114485] '''Bristol'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114460 114460] '''Sheffield'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114442 114442] '''RALPP'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114441 114441] '''RHUL'''<br />
+
Daniela hopped right back into the pilot seat after getting back from her holidays. Bristol and RALPP are looking good, Sheffield and RHUL are still in the Danger Zone - RHUL in particular were having troubles with argus and could do with some working configs from elsewhere to compare and contrast with their own.
+
 
+
'''My shame - tarball glexec'''<br />
+
https://ggus.eu/?mode=ticket_info&ticket_id=95303 95303] '''ECDF'''<br />
+
https://ggus.eu/?mode=ticket_info&ticket_id=95299 95299] '''Lancaster'''<br />
+
The tarball glexec tickets. Actually this is likely to become a defunct (or at least different) problem at Edinburgh with their SL7 move. Lancaster has a plan - we plan to deploy *something* (amazing plan there Matt) during our next big reinstall in September. Between now and then I have a test CE, cluster and most importantly some time.
+
 
+
'''Pot-luck tickets (or those I couldn't group).'''
+
 
+
'''Durham'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114381 114381] (16/6)<br />
+
A tiny fraction of jobs publishing 0 cores used. Looks to be a slurm oddity. Oliver upgraded their CEs to ARC5 last week and hopes this has fixed things. Fingers crossed! In progress (29/7)
+
 
+
'''Lancaster'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=100566 100566] (27/1/2014)<br />
+
My other shame - Lancaster's poor perfsonar performance. It's being worked on. On Hold (should be back in progress soon) (30/7)
+
 
+
'''Liverpool'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114248 114248] (21/7)<br />
+
Sno+ production problems at Liverpool, probably due to a lack of space in the shared area. Things are back in Sno+'s court, with the submitter consulting the Sno+ gurus (I think). In progress (21/7)
+
 
+
'''QMUL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114573 114573] (23/6)<br />
+
LHCB job submission problems due to the known about dual-stacking problems. Waiting for input from LHCB for a while now, as things look okay at QM now but at least check LHCB jobs still weren't running for some reason. Waiting for reply (21/7)
+
 
+
That's all folks!
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 521: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 09 June 2015'''
+
'''Monday 20th November'''
*ARC CEs were failing nagios test becuase of non-availability of egi repository. Nagios test compare CA version from EGI repo. It started on 5th June and one of the IP addresses behind webserver was not responding. Problem went away in approximately  3 hours. The same problem started again on 6th June. Finally it was fixed on 8th June. No reason was given in any of the ticket opened regarding this outage.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
 
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
'''Tuesday 17th February'''
+
* Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?
+
  
'''Tuesday 27th January'''
+
'''Tuesday 18th July'''
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
* [http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html Blog about VO Nagios]
 
* [https://vo-nagios.physics.ox.ac.uk/nagios/ Oxford VO Nagios] currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk.
 
  
  
Line 541: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 547: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 576: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  
Line 672: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 8th July 2015'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
[https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-07-08 Operations report]
+
* Lots of preparation for the RAL Open Days. These start today (8th) and culminate in the public day on Saturday (11th).
+
* Intervention on faulty router being prepared for 4th August.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A