Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,547 intermediate revisions by 39 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 20th July 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 20th July'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* Various requests (e.g. via EGI) to express interest in "Compute Resources for PanCancer Analysis of Whole Genomes" call.
+
** https://indico.cern.ch/event/776832/
* MM raised a question about remote loading of Grid files for SNO+ (email 20th July).
+
* DIRAC downtime this week due to the move to Slough - good luck!
* From Winnie: yaim on CREAM-CE - no update of var/lib/bdii/gip/ldif/ files. Should it?
+
* EGI Ops meeting this week.
* From Catalin (16th July): The decommissioning process of the 'gridpp.ac.uk' CVMFS space is about halfway, and it came to my attention the fact that sites are defining the CVMFS_REPOSITORIES variable at WN level. Whilst this variable was mandatory with cvmfs v2.0.X, this is not case with v2.1.Y. I would ask site admins to remove the 'gridpp.ac.uk' repository names from there, except the regional UK VO repositories (londongrid, scotgrid, southgrid, north grid)
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* /cvmfs/gridpp-vo help. Down to the repository? Is more documentation needed here?
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
* Atlas ADC meeting containing discussion of the future of cloud support is at 4.30 on the 21st of July, and sites are welcome to attend.
+
** State of SRM usage at DPM sites?
* For those who missed it: [arxiv.org/abs/1507.03414 observation of a new particle with LHCb]! Also see the [http://lhcb-public.web.cern.ch/lhcb-public/Welcome.html#Penta
+
press release].
+
* [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2587 Minutes of the last EGI operations meeting] are now available.
+
* Process for uploading files to CVMFS.
+
  
'''Tuesday 14th July'''
 
* There was a GDB at CERN last Wednesday [http://indico.cern.ch/event/319749/ agenda]: [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20150708 minutes].
 
* Very worthwhile reviewing Romain's [http://indico.cern.ch/event/319749/session/0/contribution/2/attachments/616106/847753/20150709_Wartel_GDB.pdf talk from the GDB on threats].
 
* Raja noted: It looks like some certificates have problems when submitted to CEs with RHEL5 variant OS-es underneath. Does this need further investigation/work?
 
* Matt: reports that the EMI WN tarball now contains gfal CLI utilities.
 
  
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 7th July'''
 
* Reminder: on July 17 a 4 hour long EGI Federated Cloud tutorial will be organised in London (at SAP near Heathrow). It's a free event, part of a 3-day long software carpentry workshop.
 
* Q2 15 quarterly reports are now due!
 
* There is a [https://ggus.eu/index.php?mode=ticket_info&ticket_id=114233 UKNGI ticket on multicore accounting] that still requires some sites to act.
 
* Proposal for a DPM workshop 16-17th of November or possibly 19-20th. Any comments?
 
* The [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/ draft T2 reliability and availability figures for June] have been produced.
 
** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_ALICE_Jun2015.pdf ALICE]: All okay.
 
** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_ATLAS_Jun2015.pdf ATLAS]: All okay.
 
** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_CMS_Jun2015.pdf CMS]: Bristol (89%:100%) - so just under the cut-off.
 
** [http://wlcg-sam.cern.ch/reports/2015/201506/wlcg/WLCG_All_Sites_LHCB_Jun2015.pdf LHCb]: Sheffield: (64%:64%); RALPP: (83%:83%).
 
* EGI Community Forum 2015: Call for Participation open! Deadline: 12 July
 
* A summary of a recent [https://indico.cern.ch/event/406078/material/minutes/minutes.html ARGUS collaboration meeting] is now available.
 
* There is a [http://indico.cern.ch/event/319749/ WLCG GDB] this week.
 
  
  
Line 69: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 76: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Monday 20th July'''
+
'''Tuesday 11th June'''
* There was a WLCG ops coordination meeting last Thursday 16th July. [https://indico.cern.ch/event/393611/ Agenda] : [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150716 Minutes].
+
 
* News: Next WLCG workshop in Lisbon 1-3 February 2016 (DPHEP event 3-4 February).
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* New TF: Future of the IS. OSG may stop publishing to BDII. eGroup created. Meetings TBD. REBUS issues will be first focus.
+
 
* Middleware: NTR
+
'''Tuesday 14th May'''
* T0 news: CVMFS incident written up (led to CMS job failures) - caused by symlink issue.
+
* Next meeting this Thursday.
* T1 feedback: Concerns about FTS3-Rucio bugs being filed against sites.
+
 
* T2 feedback: NTR
+
'''Tuesday 9th April'''
* ALICE: CERN LSF cap removed (15k-> 27k+ jobs reached). CNAF tape upgrade to Xrootd 4.1.3.
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* ATLAS: Data taking back at reduced rate. Grid full (upto 200k slots).Lost files due to Rucio and FTS race condition in May/June now fixed but file checks ongoing.
+
 
* CMS: High demand DIGI-RECO starting. T0 now creates MINIAOD. CVMFS bug encountered (link in SITCONF dir).
+
 
* LHCb: NTR.
+
'''Tuesday 26th March'''
* gLExec: NTR
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* RFC proxies: NTR
+
* Next meeting booked for 4th April
* Machine/Job features: NTR
+
 
* Middleware readiness: Volunteer sites active. Polling sites for interest in testing CentOS7/SL7 MW. Pakiti-client v3.0.1 available.
+
'''Monday 11th February 2019'''
* Multicore: Accounting check. UK sites now resolved.
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* IPv6: NTR
+
** End of CREAM support Dec 2020.
* Squid monitoring & HTTP proxy discovery: NTR
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
* Network and transfer metrics: NTR
+
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
* HTTP deployment: [https://indico.cern.ch/event/401396/ 3rd meeting on 15th July]. Functional validation of storage will use a shared SAM probe in experiment instances. For access monitoring a UDP stream compatible with rooted f-stream and publication of son messages were two presented solutions.  
+
** Experiment updates (see ATLAS discussion on DOMA)
* Actions:
+
** WG updates (few).
** ATLAS MC sites to review cap (80% T2 prod to MC). T2 is 50:50 analysis and production.
+
 
** CMS asks all T1 and T2 sites to provide Space Monitoring information to complete the picture on space usage at the sites. Please have a look at the [https://twiki.cern.ch/twiki/bin/view/CMSPublic/CompProjSpaceMon general description] and also some [https://twiki.cern.ch/twiki/bin/view/CMSPublic/SpaceMonSiteAdmin instructions for site admins].
+
 
 +
 
 +
 
  
  
Line 117: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 14th July'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-07-15 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* RAL Open Days went very well.
+
<!-- *********************************************************** ----->
* We are extending the number of worker nodes running a test configuration (these obtain the grid middleware via cvmfs).
+
* There will be an intervention on our faulty router on Tuesday 4th August. This is announced in the GOC DB.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 137: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20150708-minutes.txt Wednesday 08 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Huge backlog of ATLAS data from Glasgow waiting to go to RAL, and oddly varying performance numbers - investigating
+
* DOME upgrade problems at Edinburgh
* How physics data is like your Windows 95 games
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20150701-minutes.txt Wednesday 01 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Feedback on CMS's proposal for listing contents of storage
+
* Rucio reporting
* Simple storage on expensive raided disks vs complicated storage on el cheapo or archive drives?
+
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20150624-minutes.txt Wednesday 24 June]'''
 
* Heard about the Indigo datacloud project, a H2020 project in which STFC is participating
 
* Data transfers, theory and practice
 
** Somewhat clunky tools to set up but perform well when they run
 
** Will continue to work on recommendations/overview document
 
** Worth having recommendations/experiences for different audiences - (potential) users, decision makers, techies
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 157: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 167: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 20th July'''
+
'''Tuesday 6th February'''
* Oxford publishing 0 cores from Cream today. Maybe they forgot to switch one off. [http://goc-accounting.grid-support.ac.uk/apel/jobs2_withsubmithost.html Check here].
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 14th July'''
 
* QMUL and Sheffield appear to be lagging with publishing by a week.
 
* Please check your multicore publishing status (especially those sites mentioned in June).
 
  
'''Tuesday 16th June'''
+
'''Tuesday 30th January'''
* Region not publishing accounting by number of cores.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
** "0" core submission hosts:
+
 
** ce3.dur.scotgrid.ac.uk
+
'''Tuesday 24th Oct'''
** ce4.dur.scotgrid.ac.uk
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
** cetest02.grid.hep.ph.ic.ac.uk
+
 
** hepgrid5.ph.liv.ac.uk
+
** hepgrid6.ph.liv.ac.uk
+
** hepgrid97.ph.liv.ac.uk
+
** svr009.gla.scotgrid.ac.uk
+
** t2ce06.physics.ox.ac.uk
+
  
'''Tuesday 9th June'''
+
'''Monday 16th January'''
* Delay noted for Sheffield
+
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
  
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
  
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 201: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 209: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 23rd June'''
+
''' Tue 9th July 2019'''
* Reminder that documents need reviewing!
+
  
'''Tuesday 9th June '''
+
LHCb has added this to their requirements:
  
LSST voms2 records are not present in VOID cards yet.
+
Sites not having an SRM installation must provide:
As a workaround, a temporary note of the actual
+
values has been added to the LSST section of
+
Approved VOs.
+
  
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''General note'''
+
New VOMs rpms to match.
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
  
'''Tuesday 21st April'''
+
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
  
* The Approved VOs document has been updated to take account of changes to the Ops Portal VOID cards.For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503. Sites that support SNOPLUS.SNOLAB.CA should ensure that their configuration conforms to these settings: [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved VOs]
 
  
* KeyDocs still need updating since agreements reached at last core ops meeting.
+
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
* Question of where to direct new VOs. [http://operations-portal.egi.eu/vo/registrationWelcome EGI welcome page]?
+
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
 
 +
 
 +
'''General note'''
  
* New section in Wiki called "Project Management Pages".
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
The idea is to cluster all Self-Edited Site Tracking Tables
+
in here. Sites should keep entries in [[Current Activities]]
+
up to date. Once a Self-Edited Site Tracking Tables has
+
served its purpose, PM to move it to  [[Historical Archive]]
+
or otherwise dispose of the table.
+
  
 
|}
 
|}
Line 246: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 253: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 13th July'''
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
* There was an EGI Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-13-07-2015 agenda]
+
''' Monday 11th March '''
* URT/UMD updates:
+
** UMD 3.13.0 released on 01.07.2015: http://repository.egi.eu/2015/07/01/release-umd-3-13-0/
+
*** APEL 1.4.1
+
*** Argus PAP v. 1.6.2
+
*** gLExec-wn - v. 1.2.3 (lcmaps and mkdir)
+
*** storm 1.11.8
+
*** fetch-crl 3.0.16
+
*** cream 1.16.5
+
*** dpm-xroot 3.5.2
+
*** Xroot 4.1.1.
+
*** Frontier Squid 2.7.24
+
*** CVMFS 2.1.20
+
*** GFAL2 2.8.4
+
*** GFAL2-PYTHON 1.7.1
+
** UMD 3.13.1 released on 13.07.2015: http://repository.egi.eu/2015/07/13/release-candidate-umd-3-13-1-rc1/ (link was not updated correctly during release)
+
*** ARC Nagios probes 1.8.3
+
  
* SR updates (small because it's summer):
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11
*** gfal2 2.9.1
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
*** storm 1.11.9
+
* DPM Legacy mode is going to end in June 2019
*** srm-ifce 1.23.1....
+
* EGI will open tickets after June
*** gfal2-python 1.8.1
+
* HTCondor CE accounting status?
** In Verification
+
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
*** gfal2-plugin-xrootd 0.3.4
+
  
* Accounting
 
** [John Gordon] "Of the WLCG sites we now have 97%+ of cpu reported with cores. I expect you all saw my recent email to GDB naming 16 sites. If one German and one Spanish site and the four Russians start publishing we will jump to 99%+"
 
** New list of sites needing to update multicore accounting being prepared this evening (Monday) by Vincenzo
 
  
* SL5 decommissioning date March 2016;
+
''' Tuesday 12th February '''
* Next meeting 10th August
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Monday 15th June'''
 
* There was an EGI operations meeting today: [https://wiki.egi.eu/wiki/Agenda-15-06-2015 agenda].
 
* New Action: for the NGIs: please start tracking which sites are still using SL5 services: how many services, and for each service if still needed on SL5, if upgrades on SL5 services are expected). [https://wiki.egi.eu/wiki/SL5_retirement A wiki has been provided to record updates]. Also interesting to understand who is using Debian.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 306: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 +
 
'''Tuesday 16th June'''
 
'''Tuesday 16th June'''
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
Line 312: Line 386:
  
  
''' Tuesday 31st March
 
 
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
 
'''Monday 7th December
 
 
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 333: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th July'''
+
'''Tuesday 5th February'''
* Quiet week, once the (unofficial) ARC fix was implemented on the nagios side.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Low/best efforts ROD effort after this week for 1-2 weeks.
+
* Few availability tickets on hold
 
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
'''Monday 6th July'''
+
* DB: Between the fake ARC alarms and the fake bdii alarms it's hard to see the real alarms.
+
 
+
'''Monday 22nd June'''
+
* Generally quiet. There are some 'glue2' errors that were ticketed. Tried to let these go and see if they would clear. However, in some cases the amount of time the error was outstanding was building up. Unclear if Glue2 is used anywhere.
+
  
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
  
Line 356: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th May'''
+
'''Monday 20th November'''
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 +
 
 +
 
  
'''Tuesday 17th March'''
 
* Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
 
* There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
 
* Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.
 
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 380: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 21st July'''
+
'''Tuesday 11th June
* Most exchanges on statement wording.
+
  
'''Monday 13th July'''
+
* NTR
* EGI SVG/CSIRT **Update** OpenSSL release on 9th July - CVE-2015-1793
+
 
+
'''Monday 29th June'''
+
* EUGridPMA have announced a new set of CA rpms. Based on this IGTF release a new set of CA RPMs have been packaged for EGI. There is a request to please upgrade within the next seven days at your earliest convenience. When this timeout is over, SAM will throw critical errors on CA tests if old CAs are still detected.
+
* The next security team meeting is this Wednesday 1st July.
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 408: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 416: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 14th July'''
+
'''Monday 5th March'''
* GridPP35 in September will have a part focus on networking and IPv6. This will include a review of where sites are with their deployment. Please try to firm up dates for your IPv6 availability between now and September. Please update the [https://gridpp.ac.uk/wiki/IPv6_site_status GridPP IPv6 status table].  
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
  
'''Tuesday 23rd June'''
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
* GridPP issued a position statement regarding LHCONE.
+
** ...Concerning LHCONE for both T1 and T2. The high level summary is that the UK is not in favour, as within the UK we have no explicit need for LHCONE for any reason of T1 capacity planning, but to implement it involves additional complexity and possibly cost. The current system works fine and we therefore see no overriding reason to remove T1-T1 transit via LHCOPN. ...The UK is sensitive to the “collective” needs of the community, and as a general statement we would always seek to address any legitimate request agreed by the WLCG MB in order to play our role in meeting international expectations.
+
  
'''Tuesday 12th May'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* LHCOPN & LHCONE joint meeting at LBL June 1st & 2nd. [https://indico.cern.ch/event/376098/ Agenda] taking shape.
+
  
'''Tuesday 31st March'''
 
* Duncan has been giving the IPv6 nodes a push! See [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html Steve's IPv6 transfers page].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 441: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 20th July 2015, 14.30 BST'''<br />
 
27 Open UK Tickets this week.
 
  
'''Brunel'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=115113 115113] (17/7)<br />
+
This Brunel Ops ticket (otherwise okay) is a good reminder that when removing CEs from the GOCDB for your site make sure to get all the services, or else you just might end up still monitored (and thus end up ticketed!). Reopened (can probably be closed soon) (20/7) ''Update - ticket solved''
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114006 114006] (31/5)<br />
+
This ticket about problems with Brunels accounting figures was looking promisingly close to being solved (at least to my layman's eyes) 3 weeks ago. Any word offline? In progress (30/6)
+
 
+
'''Lancaster'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114845 114845] (6/7)<br />
+
LHCB jobs were failing at Lancaster a fortnight ago, but things should have been fixed quite promptly. Are they still broken? Waiting for reply (14/7)
+
 
+
'''QMUL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114573 114573] (23/6)<br />
+
A similar case for this LHCB ticket for QM (part of their ongoing dual-stack saga). Waiting for reply (13/7)
+
 
+
Note: The related issue [https://ggus.eu/index.php?mode=ticket_info&ticket_id=115017 115017] has been "solved" pending further testing.
+
 
+
'''Sheffield'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114649 114649] (26/6)<br />
+
This Sno+ ticket has been in "Waiting for Reply" for a little while, no word from the user (who isn't Matt M). Could we poke Sno+ though another channel about this? Waiting for reply (6/7)
+
 
+
'''Liverpool'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114248 114248] (10/6)<br />
+
We could do with finding out from Sno+ the state of play at Liverpool too, although we might have to wait until Steve is back from his hols later this week to field any replies. In progress (17/6)
+
 
+
'''Durham'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114381 114381] (16/6)<br />
+
Ticket concerning the small percentage of Durham jobs that aren't publishing their core count (probably a slurm oddity). Now that Oliver's back from holiday has he had time to look at this? On Hold (19/6)
+
 
+
'''Tier 1'''<br />
+
https://ggus.eu/?mode=ticket_info&ticket_id=113836 (20/5)<br />
+
I suspect that whilst the work described chugs along in the background we consider on holding this ticket. In progress (24/6)
+
 
+
'''UCL'''
+
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=114746 114746] (30/6)<br />
+
Ben has been battling getting his DPM working, and spotted an interesting problem where SELinux was blocking the httpd from accessing mysql. It's nice to see someone not just switching SELinux off (like I have a habit of doing...). In progress (20/7)
+
 
+
'''ECDF'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=115003 115003] (12/7)<br />
+
Andy having some problems on a test SE at ECDF - he seems ot be suffering a series of unfortunate errors. Maybe the storage group could help? In progress (17/7)
+
 
+
'''GridPP Pilot Roles.'''<br />
+
Bristol are ready for testing, Govind discovered a possible bug in argus that needs a bit more testing at RHUL. Things seem quiet at RALPP and Sheffield, and Brunel too.
+
 
+
''Supplemental - In the region multicore publishing ticket ([ https://ggus.eu/?mode=ticket_info&ticket_id=114233 114233]) only Oxford have a CE still appearing to publish 0 cores - but I thought this CE was Old-Yeller'ed?''
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 503: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 09 June 2015'''
+
'''Monday 20th November'''
*ARC CEs were failing nagios test becuase of non-availability of egi repository. Nagios test compare CA version from EGI repo. It started on 5th June and one of the IP addresses behind webserver was not responding. Problem went away in approximately  3 hours. The same problem started again on 6th June. Finally it was fixed on 8th June. No reason was given in any of the ticket opened regarding this outage.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
 
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
'''Tuesday 17th February'''
+
* Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?
+
  
'''Tuesday 27th January'''
+
'''Tuesday 18th July'''
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
* [http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html Blog about VO Nagios]
 
* [https://vo-nagios.physics.ox.ac.uk/nagios/ Oxford VO Nagios] currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk.
 
  
  
Line 523: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 529: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 558: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  
Line 654: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 8th July 2015'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
[https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-07-08 Operations report]
+
* Lots of preparation for the RAL Open Days. These start today (8th) and culminate in the public day on Saturday (11th).
+
* Intervention on faulty router being prepared for 4th August.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A