Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,618 intermediate revisions by 39 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 22nd June 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
 +
 +
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 
<!-- ***********************Start General text*********************** ----->'''
 
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 23rd June'''
 
* The BDII discussion of last week continued into the WLCG ops coordination meeting (see email thread).
 
* The IGTF is about to release an update to the trust anchor repository (1.65).
 
* hone has notified us that they have completed their use of the grid.
 
* CVMFS space for GridPP VO: /cvmfs/gridpp.gridpp.ac.uk or /cvmfs/gridpp.egi.eu
 
* supernemo data in Liverpool DPM - can it be removed?
 
* On July 17 a 4 hour long EGI Federated Cloud tutorial will be organised in London (at SAP near Heathrow). It's a free event, part of a 3-day long software carpentry workshop.
 
* GridPP35 @ Liverpool in September.
 
  
'''Tuesday 16th June'''
 
* The [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20150610 minutes] of the [[http://indico.cern.ch/event/319748/ GDB]] last week are available.
 
* ATLAS has re-classified the following sites as “ATLAS Tier 3” in AGIS (this classification being based upon minimum resource requirements): UKI-LT2-UCL-HEP UKI-LT2-IC-HEP; UKILT2-Brunel; UKI-SOUTHGRID-SUSX and UKI-SCOTGRID-DURHAM.
 
* JANET is working with Imperial College to establish a VRF to perform tests of a connection to LHCONE.
 
* Please could everyone who supports gridpp ensure that the site accepts jobs with the pilot role? In addition please also consider the other VOs mentioned in Daniela's email (17:30 on 15th June).
 
* Glasgow: VO Shares and ARC CE config question.
 
* WLCG workshop 2016: last call for volunteers.
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 53: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 60: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 23rd June'''
+
'''Tuesday 11th June'''
* There was a WLCG ops coordination meeting last Thursday 18th June: [https://indico.cern.ch/event/393609/ Agenda]. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150618Minutes].
+
 
* Highlights: Information System discussion started. Use cases and dependencies will be built up and reviewed. May have a pre-GDB on topic.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* All sites should enable multicore accounting
+
 
* News: No update.
+
'''Tuesday 14th May'''
* Baselines: Removed WMS & L&B. LFC will be removed soon.
+
* Next meeting this Thursday.
* MW issues: New globus-gss api released to mitigate problem reported last time.
+
 
* T0&1 services: T0 LHCb and shared LFC will be decommissioned 22nd June. Some dCache upgrades reported.
+
'''Tuesday 9th April'''
* T0 news: Efficiency meeting held. Cloud team making I/O changes. LHC exits see some improvement but T0 still behind other sites.
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* T1 feeedback: NTR
+
 
* T2 feedback: UK response on Information System: Useful for service discovery; minor VO usage; contains too much information; cloud raises new questions; mixed data types; YAIM helpful to fill schemas.
+
 
* OSG: Provide InfoSys as service to VOs. Best case deprecation early 2016 but depends on USATLAS.
+
'''Tuesday 26th March'''
* InfoSys: HTC > GLUE in OSG. AGIS uses it (ATLAS seek merge of GOCDB, OIM and BDII). LHCb uses for CE discovery. CMS no clear usage. ALICE for SAM and CERN IT C5 reports.
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* ALICE: High activity. CASTOR issue with xrd3cp. Request sites to plan for Xrootd v4.1.
+
* Next meeting booked for 4th April
* ATLAS: Good data taking. T0 some issues with batch/OpenStack improving. CERN network issue had impacts. CERN to BNL data backlog due to FTS not pushing hard enough.
+
 
* CMS: Data taking but technical stops. MC going well. T1 CPU should be 90% production role and 10% pilot. File transfer FNAL-RAL - possible WAITIO on storage nodes due to many CMS jobs.
+
'''Monday 11th February 2019'''
* LHCb: Run2 offline processing workflows validated. Some issues with old files at RAL without checksums.  
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* gLEexec: NTR
+
** End of CREAM support Dec 2020.
* RFC proxies: SAM - okay now for ALICE. CMS PhEDEx instances being switched.
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
* Machine/Job features: NTR
+
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
* Middleware readiness: Good work. Credit to ECDF and GRIF for DPM work. New pakiti-client imminent in EPEL stable. MW readiness App now available on a production instance. EL7 support for ARGS urgent. Next meeting 16th September.
+
** Experiment updates (see ATLAS discussion on DOMA)
* Multicore: Several sites still not publishing. APEL tickets on NGIs. Issues identified for CREAM and ARC MC publishing.
+
** WG updates (few).
* IPv6: NTR
+
 
* Network and transfers WG: PS: proposed mesh for upto 100 sites. Potential bug noted. Next meeting 8th July.
+
 
* HTTP: 2nd meeting on 3rd June. [https://twiki.cern.ch/twiki/bin/view/LCG/HTTPTFStorageRecommendations Draft conclusions]. Next meeting 15th July.
+
 
  
'''Tuesday 16th June'''
 
* The next WLCG ops coordination meeting is this Thursday 18th June: [https://indico.cern.ch/event/393609/ Agenda]. There will be presentations and discussions on the Information System.
 
* The next middleware readiness meeting is on Wednesday 17th June @ 3pm BST: [http://indico.cern.ch/event/393222/ Agenda].
 
  
  
Line 106: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
* A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting].
 
* The agenda follows this format:
 
** 1. Summary of Operational Status and Issues
 
** 2. Highlights/summary of the Tier1 Monday operations meeting (Grid Services; Fabric; CASTOR and Other)
 
** 3. Experiment plans and operational issues (CMS; ATLAS; LHCb; ALICE and Others)
 
** 4. Special presentations
 
** 5. Actions
 
** 6. Highlights for Operations Bulletin Latest
 
** 7. AoB
 
  
'''Tuesday 23rd June'''
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The short outage last Wednesday (17th June) took place as planned. As agreed at last week's meeting we stopped/started the ToP BDIIs around this intervention. Following that we test need to plan a longer (few hour) outage for an intervention on our problematic router.
+
<!-- *********************************************************** ----->
* DiRAC file transfers from Durham now working.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 134: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20150624-minutes.txt Wednesday 24 June]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Heard about the Indigo datacloud project, a H2020 project in which STFC is participating
+
* DOME upgrade problems at Edinburgh
* Data transfers, theory and practice
+
* Data management support/development for IRIS users
** Somewhat clunky tools to set up but perform well when they run
+
** Will continue to work on recommendations/overview document
+
** Worth having recommendations/experiences for different audiences - (potential) users, decision makers, techies
+
  
'''Tuesday 23rd June'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Good progress with DiRAC transfers from Durham - data flowing since Monday.
+
* Rucio reporting
  
'''[http://storage.esc.rl.ac.uk/weekly/20150617-minutes.txt Wednesday 17 June]'''
+
'''Wed 16 Oct'''
* EU projects - SAGE: HSM for HPC
+
* CEPH workshop at CERN report
* Progress on new VOs.  Can test as members of 'gridpp' or similar until they get their own allocations.
+
** We've talked about it before; should VOs have individual T2 allocations to avoid stepping on each other's toes?
+
** Case for expanding back-up-into-T1 to other VOs?
+
  
'''Wednesday 27 May'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* Working on troubleshooting DIRAC data for/with LIGO (not to be confused with DiRAC or with any of the other things called DiRAC)
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Working on setting up DiRAC at Tier 1 (not to be confused with DIRAC or Dirac or with any other thing called Dirac)
+
* Roadmap for xroot and http TPC for RAL FTS(es)
* New secret user support list!
+
  
'''Tuesday 18th May'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
* [http://storage.esc.rl.ac.uk/weekly/ Minutes are available.]  
+
* Storage support for IRIS VOs?
  
'''Tuesday 21st April'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
* Has there been any Tier-1 contact with DiRAC?
+
* Report from yesterday's Rucio Face Meeting at Coseners
* Proposal to setup an 'other VOs' users list. GridPP-Users is too tied with WLCG projects.
+
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20150415-minutes.txt Wednesday 15 April]'''
 
* Backing up data from [http://www.stfc.ac.uk/1263.aspx DiRAC] to GridPP (tape)
 
* More case studies on supporting non-LHC VOs on GridPP: we have a lot of great stuff that can do great stuff - non-LHC VOs tend to have less regimented data models so maybe we need more case studies.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 171: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 181: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 16th June'''
 
*  Region not publishing accounting by number of cores.
 
** "0" core submission hosts:
 
** ce3.dur.scotgrid.ac.uk
 
** ce4.dur.scotgrid.ac.uk
 
** cetest02.grid.hep.ph.ic.ac.uk
 
** hepgrid5.ph.liv.ac.uk
 
** hepgrid6.ph.liv.ac.uk
 
** hepgrid97.ph.liv.ac.uk
 
** svr009.gla.scotgrid.ac.uk
 
** t2ce06.physics.ox.ac.uk
 
  
'''Tuesday 9th June'''
+
'''Tuesday 30th January'''
* Delay noted for Sheffield
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
'''Tuesday 26th May'''
+
'''Tuesday 24th Oct'''
* Delay noted for Sheffield.
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
  
'''Tuesday 12th May'''
 
* Issues noted with sync for Brunel, Liv, ECDF (see EGI ticket 113473). Message broker issues (memory related) are likely the underlying EGI problem.
 
* Need to check on VAC sync publishing.
 
  
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
  
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 216: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 224: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 23rd June'''
+
''' Tue 9th July 2019'''
* Reminder that documents need reviewing!
+
  
'''Tuesday 9th June '''
+
LHCb has added this to their requirements:
  
LSST voms2 records are not present in VOID cards yet.
+
Sites not having an SRM installation must provide:
As a workaround, a temporary note of the actual
+
values has been added to the LSST section of
+
Approved VOs.
+
  
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''General note'''
+
New VOMs rpms to match.
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
  
'''Tuesday 21st April'''
+
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
  
* The Approved VOs document has been updated to take account of changes to the Ops Portal VOID cards.For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503. Sites that support SNOPLUS.SNOLAB.CA should ensure that their configuration conforms to these settings: [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved VOs]
 
  
* KeyDocs still need updating since agreements reached at last core ops meeting.
+
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
* Question of where to direct new VOs. [http://operations-portal.egi.eu/vo/registrationWelcome EGI welcome page]?
+
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
 
 +
 
 +
'''General note'''
  
* New section in Wiki called "Project Management Pages".
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
The idea is to cluster all Self-Edited Site Tracking Tables
+
in here. Sites should keep entries in [[Current Activities]]
+
up to date. Once a Self-Edited Site Tracking Tables has
+
served its purpose, PM to move it to  [[Historical Archive]]
+
or otherwise dispose of the table.
+
  
 
|}
 
|}
Line 261: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 268: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Monday 15th June'''
+
''' 14 May 2019 '''
* There was an EGI operations meeting today: [https://wiki.egi.eu/wiki/Agenda-15-06-2015 agenda].
+
* Meeting for May cancelled. Next meeting is on 10th June.
* New Action: for the NGIs: please start tracking which sites are still using SL5 services: how many services, and for each service if still needed on SL5, if upgrades on SL5 services are expected). [https://wiki.egi.eu/wiki/SL5_retirement A wiki has been provided to record updates]. Also interesting to understand who is using Debian.
+
  
'''Tuesday 21st April'''
+
''' Monday 11th March '''
* There was an EGI ops meeting on Monday 20th.
+
 
* David updated the UK SL5 response.
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
* Please review the [https://wiki.egi.eu/wiki/Agenda-20-04-2015 agenda/minutes].
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''  
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.  
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
  
Line 292: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 16th June'''
+
'''Tuesday 4th July'''
* FN & DC decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
+
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
* Feedback welcome.
+
+
  
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
  
''' Tuesday 31st March
+
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
  
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
 
  
'''Monday 7th December
+
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
 +
 
  
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 319: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 22nd June'''
+
'''Tuesday 5th February'''
* Generally quiet. There are some 'glue2' errors that were ticketed. Tried to let these go and see if they would clear. However, in some cases the amount of time the error was outstanding was building up. Unclear if Glue2 is used anywhere.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
 
+
'''Tuesday 14th August'''
'''Monday 8th June'''
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* The eu.repository has now made a comeback, so the arc alarms, cleared, but I the site availabilities (probably) need to be corrected.
+
* Still getting on/off bdii alarms for a variety of sites.
+
 
+
'''Monday 11th May'''
+
* Rota responses awaited from Andrew and Daniela.
+
* Handover summary should be uploaded to the bulletin please.
+
  
  
Line 343: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th May'''
+
'''Monday 20th November'''
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 +
 
 +
 
  
'''Tuesday 17th March'''
 
* Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
 
* There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
 
* Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.
 
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 367: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 16th June'''
+
'''Tuesday 11th June
* Security team meeting this Wednesday.
+
* One topic for review concerns ES.
+
  
'''Tuesday 9th June'''
+
* NTR
* EGI SVG Advisory - Up to 'High' RISK - Persistent XSS in OpenStack Horizon admin dashboard. CVE-2015-3988
+
* CA website access issue. Possibly related to [[https://developer.mozilla.org/en-US/docs/Mozilla/Projects/NSS/NSS_3.19.1_release_notes this issue]].
+
* [ https://wiki.egi.eu/wiki/EGI_IGTF_ReleaseEuropean Grid Infrastructure EGI Trust Anchor release 1.64]        ( 2015.06.03)
+
 
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 395: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 403: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 23rd June'''
+
'''Monday 5th March'''
* GridPP issued a position statement regarding LHCONE.  
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
** ...Concerning LHCONE for both T1 and T2. The high level summary is that the UK is not in favour, as within the UK we have no explicit need for LHCONE for any reason of T1 capacity planning, but to implement it involves additional complexity and possibly cost. The current system works fine and we therefore see no overriding reason to remove T1-T1 transit via LHCOPN. ...The UK is sensitive to the “collective” needs of the community, and as a general statement we would always seek to address any legitimate request agreed by the WLCG MB in order to play our role in meeting international expectations.
+
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.  
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
'''Tuesday 12th May'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* LHCOPN & LHCONE joint meeting at LBL June 1st & 2nd. [https://indico.cern.ch/event/376098/ Agenda] taking shape.
+
  
'''Tuesday 31st March'''
 
* Duncan has been giving the IPv6 nodes a push! See [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html Steve's IPv6 transfers page].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 425: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 22nd June 2015, 14.00 BST'''
 
  
35 Open UK Tickets this week (!!!)
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
 
+
'''GridPP Pilot Role'''<br />
+
A dozen of them are from Daniela (who painstakingly submitted them all) concerning getting the gridpp (and other) pilot role enabled on the site in question's CEs.
+
 
+
An example of one of these tickets is:<br />
+
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=114440  114440] (Lancaster's smug solved ticket).
+
 
+
Ticketed sites are: Durham, Bristol, Cambridge, Glasgow, ECDF (who are also having general gridpp VO support problems), EFDA-JET (looking solved), Oxford, Liverpool, Sheffield, Brunel, RALPP and RHUL. Most tickets are being worked on fine, but the Bristol and Liverpool ones were still just in an "assigned" state at time of writing. <br />
+
''Update - good progress on this, just one ticket left "assigned". Cambridge are done, as are JET (ticket needs to be closed). Oxford and Manchester are ready for to have their new setups tried out, with Oxford kindly road-testing glexec for the pilot roles. Good stuff.''
+
 
+
'''Core Count Publishing'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114233 114233] (10/6)<br />
+
Of the sites mentioned in this ticket (Durham[1], IC, Liverpool, Glasgow, Oxford) who *hasn't* had a go at changing their core count publishing? I know Oxford have. Daniela had a pertinent question about publishing for VMs, which John answered. In progress (17/6)
+
 
+
[1] Durham have another ticket on this which may explain their lack of core count publishing:
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114381 114381] (16/6)
+
 
+
'''DIRAC'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114379 114379] (16/6)<br />
+
Sam S formed this ticket over having trouble accessing the majority of SEs over Dirac, after some discussion around this last week. Sam acknowledges that this could be a site problem, not a DIRAC problem, but you gotta start somewhere (he worded that point more eloquently). Daniela has posted her latest and greatest DIRAC setup gubbins for Sam to try out. Another, unrelated,  point to have are the names missing from Sam's list - for example I'm pretty sure Lancaster should support gridpp VO storage but I've forgotten to roll it out! Waiting for reply (22/6)
+
 
+
'''LIVERPOOL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114248 114248] (10/6)<br />
+
Final ticket today, and another one discussed last week in the storage meeting. Steve's explanation of why (and how) Sno+ would need to start to using space tokens was fantastically well worded in a way to not spook easily startled users. David is digesting the information, but it will likely need to wait for Matt M's return before we'll see progress. In progress (16/6)
+
 
+
'''MANCHESTER'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=114444 114444](18/6)<br />
+
I told a pork pie when I said that was the last ticket - this one caught my eye. A ticket from lhcb over files not having their checksums stored on Manchester's DPM. A link was given to another ticket at CBPF for a similar issue which got the DPM devs involved ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=111403 111403]) - although Andrew McNab was already subscribed to the ticket. In progress (19/6)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 470: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 09 June 2015'''
+
'''Monday 20th November'''
*ARC CEs were failing nagios test becuase of non-availability of egi repository. Nagios test compare CA version from EGI repo. It started on 5th June and one of the IP addresses behind webserver was not responding. Problem went away in approximately  3 hours. The same problem started again on 6th June. Finally it was fixed on 8th June. No reason was given in any of the ticket opened regarding this outage.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
 
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
'''Tuesday 17th February'''
+
* Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?
+
  
'''Tuesday 27th January'''
+
'''Tuesday 18th July'''
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
* [http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html Blog about VO Nagios]
 
* [https://vo-nagios.physics.ox.ac.uk/nagios/ Oxford VO Nagios] currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk.
 
  
  
Line 490: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 496: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 525: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  
Line 621: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 10th June 2015'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
[https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-06-10 Operations report]
+
* Ongoing investigation into Castor performance issues for CMS.
+
* The second tranche of 2014 Worker Node purchases has been put into production.
+
* There is a short outage announced for next Wednesday (17th June) to test the recent change in the network routing and confirm the problem with the Tier1 network router can still be reproduced.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A