Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(2,679 intermediate revisions by 40 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 25th May 2015
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 25th May'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* VO updates:
+
** https://indico.cern.ch/event/776832/
** LIGO issue looked like DNS resolution issue. Sam following up this week. Noted DIRAC errors truncated.  Suggested trying non-IC disk. Tom reported: CERN@school-enabled disks - QMUL-disk, GLASGOW-disk and LIVERPOOL-disk worked on every network tried with various instances of the GridPP CernVM with the DIRAC UI installed... so issue elsewhere.
+
* DIRAC downtime this week due to the move to Slough - good luck!
** LZ: Andy W: Met Paolo (Edinburgh) from LZ to walk through the basics (in parallel with LZ computing on the Grid being established). AW joined the GridPP VO to assist.
+
* EGI Ops meeting this week.
** gridpp-support at jiscmail ac uk created.
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* Friday WMS issue?: svr024.gla.scotgrid.ac.uk has been removed from the Nagios configuration. Most CEs quickly returned from 'unknown' state, and others came back to normal in the next round of tests.
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
* Tier-1problems with secondary database system for Castor - resolved quickly. 
+
** State of SRM usage at DPM sites?
  
'''Tuesday 19th May'''
 
* There was a GDB last week. The [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20150513 summary] is available.
 
* The [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20150512 summary of the pre-GDB about batch systems] is available.
 
* GridPP contacts for other VOs established (these are a current priority). Contacts expected to provide weekly updates on progress and status.
 
** DIRAC: Jens Jensen (-> Brian Davies?) – vo being created
 
** LIGO: Catalin Condurache – vo being created
 
** LOFAR: George Ryall
 
** LSST: Alessandra Forti
 
** LZ: David Colling
 
** UKQCD: Jeremy Coles
 
  
* Glexec: Matt is redirecting efforts from coming up with a relocatable glexec tarball, to a recipe that sites could follow. He comments that this would be a lot more involved than he would like for a tarball install, but thinks that it's the only way to proceed with any confidence.
+
'''Tuesday 11th June'''
* [http://gstat2.grid.sinica.edu.tw/gstat/summary/ gstat] is not supported. Note this [https://www.ggus.org/?mode=ticket_info&ticket_id=113521 ticket].
+
* The network issues resolution process/procedure...
+
* Assessment of the impact on User Communities/NGIs of the EGI core activities 2015 (results uploaded to the meeting page)
+
* The EGI conference is taking place this week - link to the [http://indico.egi.eu/indico/conferenceTimeTable.py?confId=2452#all.detailed detailed agenda].
+
* A reminder that the [http://hepwww.rl.ac.uk/sysman/June2015/main.html HEPSYSMAN & security training meeting] is taking place 1st-3rd June.
+
* STFC (through Catalin Condurache) are interested in investigating joining EGI Fed Cloud
+
  
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
  
  
'''Tuesday 12th May'''
 
* There is a [https://indico.cern.ch/event/319821/ pre-GDB on batch systems at CERN this week]. Tier-2 participation encouraged.
 
* There will be a [https://indico.cern.ch/event/319747/ GDB on Wednesday 13th].
 
* The next GridPP Technical Discussion meeting is scheduled for next Friday.
 
* LSST preparing test dataset (involves Manchester, Liverpool and Edinburgh).
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 70: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 77: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 26th May'''
+
'''Tuesday 11th June'''
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes150521 Minutes of the 21st May WLCG ops coordination meeting are available]. A snapshot of the updates:
+
 
* Baselines: New EMI release with Storm 1.11.8. dCache 2.10.28/2.12.8 verified and set as baseline. Torque 2.5.13 added to baselines table.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* MW issues: NTR.
+
 
* T0 services: CASTOR updated to 2.1.15. SRM validation ongoing. xroot is the main access protocol.
+
'''Tuesday 14th May'''
* T1 services: KIT, IN2P3 and RRC-KI-T1 dCahce upgrades.
+
* Next meeting this Thursday.
* T0 news: LFC to be stopped 22nd June. CMS pilot role mappings changed from static to pool account mapping (for tests and scheduling to work properly).
+
 
* T1 feedback: NTR
+
'''Tuesday 9th April'''
* T2 feedback: NTR
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* ALICE: Normal-high activity. No ops issues.
+
 
* ATLAS: >200k running jobs - requires single/multi-core job mix. Final data transfer tests this week. Request T1s to avoid major downtimes until the summer.
+
 
* CMS: Started Run2 DIGI-RECO. Several EOS issues. Increased use/dependence on global xrootd re-director at CERN (so criticality impact has increased).
+
'''Tuesday 26th March'''
* LHCb: Computing workshop last week. Problems with SARA SRM.
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* glexec: NTR
+
* Next meeting booked for 4th April
* RFC proxies: SAM-Nagios refresh_proxy probe fixed in UMD-3. Once sites check ok, central services of the experiments will be checked.
+
 
* Machine job features: NTR
+
'''Monday 11th February 2019'''
* MW readiness: dCahce v2.10.28 done. StoRM in progress. Progress on [http://indico.cern.ch/event/392665/contribution/3/material/slides/1.pdf MW Readiness App].
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* Multi-core:
+
** End of CREAM support Dec 2020.
** ATLAS goal is 80% production resources MC enabled. Looking to increase job lengths to 10-15hrs for 8-core slots to improve efficiency (also looking at a global fairshare). Sites should give more priority to multi-core over single core jobs. Sites that dynamically cap should adjust their cap to respect the 80% share.  
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
** CMS consolidating deployment to T1s. Looking into multicore pilots inefficiencies.
+
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
* IPv6: NTR
+
** Experiment updates (see ATLAS discussion on DOMA)
* Squid monitoring/HTTP proxy: No news.
+
** WG updates (few).
* Network & transfer metrics WG:  perfSONAR (be aware of logjam vulnerability). Network performance new GGUS SU from 24th June (WLCG network throughput). [https://indico.cern.ch/event/382624/ Next meeting 3rd June].
+
 
* HTTP deployment: [https://twiki.cern.ch/twiki/bin/view/LCG/HTTPDeployment First meeting took place]. Next: identification of an appropriate monitoring solution and the compilation of a full list of functionality that the experiments would like to see delivered via HTTP.
+
 
 +
 
  
  
Line 119: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
* A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting].
 
* The agenda follows this format:
 
** 1. Summary of Operational Status and Issues
 
** 2. Highlights/summary of the Tier1 Monday operations meeting (Grid Services; Fabric; CASTOR and Other)
 
** 3. Experiment plans and operational issues (CMS; ATLAS; LHCb; ALICE and Others)
 
** 4. Special presentations
 
** 5. Actions
 
** 6. Highlights for Operations Bulletin Latest
 
** 7. AoB
 
  
'''Tuesday 26th May'''
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The problems with our primary network router are still being followed up. Planned intervention this week (Thursday morning) to change routing for some non-Tier1 services. This will ease our ability to make future changes.
+
<!-- *********************************************************** ----->
* We moved the rack containing our Castor standby databases last Wednesday. There were some problems and Castor was in a 'warning' state in the GOC  DB for some time - although in the end the service was not affected.
+
* Our plans to update to the version of the Oracle database behind Castor are delayed so that we avoid interventions for this cause during at least the first part of LHC Run 2.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 147: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 27 May'''
 
* Working on troubleshooting DIRAC data for/with LIGO (not to be confused with DiRAC or with any of the other things called DiRAC)
 
* Working on setting up DiRAC at Tier 1 (not to be confused with DIRAC or Dirac or with any other thing called Dirac)
 
* New secret user support list!
 
  
'''Tuesday 18th May'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* [http://storage.esc.rl.ac.uk/weekly/ Minutes are available.]  
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
  
'''Tuesday 21st April'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Has there been any Tier-1 contact with DiRAC?
+
* Rucio reporting
* Proposal to setup an 'other VOs' users list. GridPP-Users is too tied with WLCG projects.
+
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20150415-minutes.txt Wednesday 15 April]'''
 
* Backing up data from [http://www.stfc.ac.uk/1263.aspx DiRAC] to GridPP (tape)
 
* More case studies on supporting non-LHC VOs on GridPP: we have a lot of great stuff that can do great stuff - non-LHC VOs tend to have less regimented data models so maybe we need more case studies.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 168: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 178: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 26th May'''
 
* Delay noted for Sheffield.
 
  
'''Tuesday 12th May'''
+
'''Tuesday 30th January'''
* Issues noted with sync for Brunel, Liv, ECDF (see EGI ticket 113473). Message broker issues (memory related) are likely the underlying EGI problem.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
* Need to check on VAC sync publishing.
+
  
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
  
* A reminder to keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC06 tables].
+
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 198: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 206: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
  
'''Tuesday 21st April'''
+
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
* The Approved VOs document has been updated to take account of changes to the Ops Portal VOID cards.For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503. Sites that support SNOPLUS.SNOLAB.CA should ensure that their configuration conforms to these settings: [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved VOs]
 
  
* KeyDocs still need updating since agreements reached at last core ops meeting.
 
  
* Question of where to direct new VOs. [http://operations-portal.egi.eu/vo/registrationWelcome EGI welcome page]?
+
'''General note'''
  
* New section in Wiki called "Project Management Pages".
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
The idea is to cluster all Self-Edited Site Tracking Tables
+
in here. Sites should keep entries in [[Current Activities]]
+
up to date. Once a Self-Edited Site Tracking Tables has
+
served its purpose, PM to move it to  [[Historical Archive]]
+
or otherwise dispose of the table.
+
  
 
|}
 
|}
Line 229: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 236: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 21st April'''
+
''' 14 May 2019 '''
* There was an EGI ops meeting on Monday 20th.
+
* Meeting for May cancelled. Next meeting is on 10th June.
* David updated the UK SL5 response.
+
* Please review the [https://wiki.egi.eu/wiki/Agenda-20-04-2015 agenda/minutes].
+
  
'''Monday 9th March'''
+
''' Monday 11th March '''
  
* The agenda for February's EGI ops meeting is [https://wiki.egi.eu/wiki/Agenda-09-03-2015 here]. Minutes are [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=2465 here]
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
** APEL 1.4.0
 
*** Added Month and Year columns to primary key of CloudSummaries table in cloud schema.
 
** DPM-Xrootd 3.5.2 is in EPEL stable - this is the first version of the component compatible with xrootd4
 
** gLExec-wn - v. 1.2.3: lcmaps-plugins-c-pep 1.3.0-1 & mkgltempdir 0.0.5-1
 
*** "The lcmaps-plugins-c-pep-1.3.0-1 preferably needs the argus-pep-api-c-2.3.0. This version will be released into EMI & UMD repositories in a near future."
 
** UMD 3.11.0 released on 16.02.2014, UMD 3.11.1 released on 4.03.2014
 
** lcg-CA 1.62 noted with an intention to broadcast these as they occur as opposed to monthly.
 
** EGI looking at the decommissioning of SL5, possibly by end of 2015, as a byproduct of adding CentOS 7 to UMD. NGIs to make a note if extended SL5 support is required.
 
** Vincenzo Spinoso has joined EGI Ops team from NGI_IT. Vincenzo will chair EGI Ops.
 
** Next meeting is April 20th.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 270: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
''' Tuesday 31st March
+
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 
  
* Glasgow Graphite/Grafana documentation: http://www.scotgrid.ac.uk/graphite/
+
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
  
'''Monday 7th December
 
  
* Meeting last Friday - agenda: https://indico.cern.ch/event/356853/ minutes: https://indico.cern.ch/event/356853/material/minutes/1.pdf
 
* This was the wrap-up meeting of the consolidation TF; the mailing list will remain extant for a while yet.
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 291: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 11th May'''
+
'''Tuesday 5th February'''
* Rota responses awaited from Andrew and Daniela.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Handover summary should be uploaded to the bulletin please.
+
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Tuesday 28th April'''
+
'''Tuesday 14th August'''
* Glasgow: A GLUE2 problem is transient and doesn't have a short-term solution (if the service status was checked a little more frequently it would help).  Currently on hold. IC sometimes see this too.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
 
+
* UCL: No change to the on-going situation. UCL has hopped from one downtime to another this week. Note – AM visiting UCL this week to setup VAC. Services will be decommissioned after this step.
+
 
+
 
+
'''Tuesday 21st April'''
+
* UCL have put themselves into a downtime until the 21st April. (Start of next week). Noted this in their outstanding tickets.
+
* Birmingham's availability has steadily recovered over the week - and the low availability ticket against them should be closable next week.
+
  
  
Line 317: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th May'''
+
'''Monday 20th November'''
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 +
 
 +
 
  
'''Tuesday 17th March'''
 
* Daniela has updated the [ https://www.gridpp.ac.uk/wiki/Staged_rollout_emi3 EMI-3 testing table]. Please check it is correct for your site. We want a clear view of where we are contributing.
 
* There is a middleware readiness meeting this Wednesday. Would be good if a few site representatives joined.
 
* Machine job features solution testing. Fed back that we will only commence tests if more documentation made available. This stops the HTC solution until after CHEP. Is there interest in testing other batch systems? Raul mentioned SLURM. There is also SGE and Torque.
 
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 341: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 18th May'''
+
'''Tuesday 11th June
* EGI SVG and CSIRT Advisory "Critical/Low?".  "VENOM: QEMU vulnerability (CVE-2015-3456)
+
* Issue with VM appliance - image ships with ...
+
* EGI SVG Advisory 'High' Risk - Dirac SQL injection vulnerability [EGI-SVG-2014-7553]
+
* IGTF is about to release an update to the trust anchor repository (1.64)
+
  
'''Tuesday 12th May'''
+
* NTR
* [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-2015-8479 EGI-SVG-2015-8479]
+
* Security rota under discussion.
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 369: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 377: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 12th May'''
+
'''Monday 5th March'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
  
* LHCOPN & LHCONE joint meeting at LBL June 1st & 2nd. [https://indico.cern.ch/event/376098/ Agenda] taking shape.
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
'''Tuesday 31st March'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* Duncan has been giving the IPv6 nodes a push! See [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html Steve's IPv6 transfers page].
+
  
'''Tuesday 10th March'''
 
* From the recent WLCG meeting, [https://indico.cern.ch/event/377034/material/slides/1.pdf two slides (1 & 2)] give the direction of the network monitoring and metrics progress: integration of perfSONAR event types into experiment monitoring and an architecture for data to get from RSV probes to client. Components described on slide 3.
 
* The [https://indico.cern.ch/event/376098/ next LHCOPN and LHCONE joint meeting] will take place on Monday 1st and Tuesday 2nd of June 2015 in Berkeley (US) (hosted by LBL and ESnet).
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 400: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th May 2015'''<br />
 
Matt's on leave until the 8th of June. But he's replaceable with handy links... 23 tickets today:
 
  
[https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?host=all&servicestatustypes=16&hoststatustypes=15 '''Other VO Nagios''']<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
 
+
[http://tinyurl.com/nwgrnys '''UK NGI GGUS tickets''']
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 420: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 17th February'''
+
'''Monday 20th November'''
* Another period where message brokers were temporarily unavailable seen yesterday. Any news on the last follow-up?
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
  
'''Tuesday 27th January'''
+
'''Tuesday 18th July'''
* Unscheduled outage of the EGI message broker (GRNET) caused a short-lived disruption to GridPP site monitoring (jobs failed) last Thursday 22nd January. Suspect BDII caching meant no immediate failover to stomp://mq.cro-ngi.hr:6163/ from stomp://mq.afroditi.hellasgrid.gr:6163/
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
* [http://southgrid.blogspot.co.uk/2014/10/nagios-monitoring-for-non-lhc-vos.html Blog about VO Nagios]
 
* [https://vo-nagios.physics.ox.ac.uk/nagios/ Oxford VO Nagios] currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk.
 
  
  
Line 437: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 443: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 19th May'''
 
* There is a current priority for enabling/supporting our joining communities.
 
  
'''Tuesday 5th May'''
+
'''Monday 20th November'''
* We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 28th April'''
 
* For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk  and voms03.gridpp.ac.uk  have both been updated from 15003 to 15503.
 
 
'''Tuesday 31st March'''
 
* LIGO are in need of additional support for debugging some tests.
 
* LSST now enabled on 3 sites. No 'own' CVMFS yet.
 
  
 
* Impact
 
* Impact
Line 472: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th February'''
+
'''Date'''
* Next review of status today.
+
 
+
'''Tuesday 27th January'''
+
* Squids not in GOCDB for: UCL; ECDF; Birmingham; Durham; RHUL; IC; Sussex; Lancaster
+
* Squids in GOCDB for: EFDA-JET; Manchester; Liverpool; Cambridge; Sheffield; Bristol; Brunel; QMUL; T1; Oxford; Glasgow; RALPPD.
+
 
+
'''Tuesday 2nd December'''
+
* [https://www.gridpp.ac.uk/wiki/Batch_system_status Multicore status]. Queues available (63%)
+
** YES: RAL T1; Brunel; Imperial; QMUL; Lancaster; Liverpool; Manchester; Glasgow; Cambridge; Oxford; RALPP; Sussex (12)
+
** NO: RHUL (testing); UCL; Sheffield (testing); Durham; ECDF (testing); Birmingham; Bristol (7)
+
 
+
* According to our [https://www.gridpp.ac.uk/wiki/Batch_system_status table] for cloud/VMs (26%)
+
** YES: RAL T1; Brunel; Imperial; Manchester; Oxford (5)
+
** NO: QMUL; RHUL; UCL; Lancaster; Liverpool; Sheffield; Durham; ECDF; Glasgow; Birmingham; Bristol; Cambridge; RALPP; Sussex (14)
+
 
+
* [http://www.gridpp.ac.uk/php/gridpp-dirac-sam.php?action=viewlcg GridPP DIRAC jobs] successful  (58%)
+
** YES: Bristol; Glasgow; Lancaster; Liverpool; Manchester; Oxford; Sheffield; Brunel; IC; QMUL; RHUL (11)
+
** NO: Cambridge; Durham; RALPP; RAL T1 (4) + ECDF; Sussex; UCL; Birmingham (4)
+
 
+
* [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 status]
+
** Allocation - 42%
+
** YES: RAL T1; Brunel; IC; QMUL; Manchester; Sheffield; Cambridge; Oxford (8)
+
** NO: RHUL; UCL; Lancaster; Liverpool; Durham; ECDF; Glasgow; Birmingham; Bristol; RALPP; Sussex
+
 
+
* Dual stack nodes - 21%
+
** YES: Brunel; IC; QMUL; Oxford (4)
+
** NO: RHUL; UCL; Lancaster; Glasgow; Liverpool; Manchester; Sheffield; Durham; ECDF; Birmingham; Bristol; Cambridge; RALPP; Sussex, RAL T1 (15)
+
 
+
 
+
 
+
'''Tuesday 21st October'''
+
* High loads seen in xroot by several sites: Liverpool and RALT1... and also Bristol (see Luke's TB-S email on 16/10 for questions about changes to help).
+
  
'''Tuesday 9th September'''
 
* Intel announced the new generation of Xeon based on Haswell.
 
  
  
Line 568: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 13th May 2015'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
[https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2015-05-13 Operations report]
+
* We are investigating some significant Castor performance issues for CMS.
+
* Revised (still draft) dates for the upgrade of the Oracle database behind Castor (to version 11.2.0.4) were presented.
+
* The decommissioning of the the CREAM CEs was effectively done a wek ago. They are now marked as being not in production in the GOC DB.
+
* We are still working to fix the problematic Tier1 router.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A