Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,306 intermediate revisions by 43 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 6th October 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 7th October'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* A reminder to please share your work with everyone via blog posts. In the core-ops meeting it was suggested that there be an incentive... we'll consider that!
+
** https://indico.cern.ch/event/776832/
* Ewan will take a closer look at the middleware package reporter (the Pakiti contender... or ally).
+
* DIRAC downtime this week due to the move to Slough - good luck!
* Matt will be (trialing) following up on VO Nagios errors from GridPP Nagios.
+
* EGI Ops meeting this week.
* There is an [https://indico.cern.ch/event/331983/ IPv6 quarterly meeting] this week.
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* There is a [http://indico.cern.ch/event/272778/ GDB tomorrow 8th October].
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
* GridPP collaboration meeting now scheduled for April 28th to 30th 2015
+
** State of SRM usage at DPM sites?
  
'''Tuesday 30th September'''
 
* There is an [http://indico.cern.ch/event/340113/ IPv6 meeting next week 6th-7th October].
 
* There is a [http://indico.cern.ch/event/272778/ GDB next week on 8th October].
 
  
'''Monday 22nd September'''
+
'''Tuesday 11th June'''
* [https://operations-portal.in2p3.fr/broadcast/archive/id/1194 Operations Portal  v3.0.5 is now online].
+
 
* There were some reports of CMS overloading WNs... discussion needed?
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* There was an EGI OMB last week ([https://indico.egi.eu/indico/conferenceDisplay.py?confId=2281 agenda]: [https://indico.egi.eu/indico/getFile.py/access?resId=0&materialId=minutes&confId=2281 minutes]):
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
** we have a few more days to feed back on the revised OLAs;
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
** gstat has now got some support again;
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
** feedback is requested on the EGI.eu SLA;
+
<!-- ***********************Start General text*********************** ----->'''
** site certification (tagging and process) within the EGI federated cloud is being re-evaluated;
+
'''Tuesday 4th June 2019'''
** ARGUS central banning is being piloted following which rollout across EGI will be expected early 2015;
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
** SAM probe changes for ops have been agreed (e.g. removing the FTS2 tests);
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
** Some products are still seeking early adopter sites (e.g. CREAM-LSF and CVMFS).
+
* iris.ac.uk VO - Andrew explained this.
* The [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2282 next EGI OMB is on 30th October].
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
* There is an EGI conference this week [https://indico.egi.eu/indico/conferenceTimeTable.py?confId=2160#all Challenges and Solutions for Big Data processing on Cloud].
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
  
* Storage placement - survey TBC.
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 64: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 71: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 7th October'''
+
'''Tuesday 11th June'''
* * There was a WLCG ops coordination meeting last Thursday. ([https://indico.cern.ch/event/341734/ Agenda]: [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes141002 Minutes]). Some notes follow...
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
 +
 
  
* News: [https://twiki.cern.ch/twiki/bin/view/LCG/CentOS7DependencyRPM HEP_OSlibs-7.0.0-0.el7.cern.x86_64.rpm] for CentOS7 has been released; CHEP 2015 15th October [s://indico.cern.ch/event/304944/call-for-abstracts/ abstract deadline] approaching; comments on Shellshock.
 
* MW baselines: New version of the UI and WN estimated for next UMD end October; dCache 2.2.x decommissioning deadline is 31-10-2014
 
* MW issues: xroot package deployed with ROOT 6 breaks access to dCache storage, affecting LHCb. Fix coming.  CREAM, WMS, L&B, UI, WN cannot be installed at the moment because the classads package ( dependency for all of them ) was declared an orphan in EPE!
 
* T0 & T1 updates: Mainly SE upgrades
 
* Oracle: [https://twiki.cern.ch/twiki/bin/view/LCG/OracleDeployment Upgrade plans] updated.
 
* T0 news: WMSes decommissioned 1st October.Lxplus5 will be stopped in October; AFS UI (removal) discussion ongoing.
 
* T1 feedback: NTR
 
* T2 feedback: NTR
 
* ALICE: Investigation of job failure rates and inefficiencies;  HLT farm running as an ALICE site since Sep 24.
 
* ATLAS: DC14 ongoing. Multi-core recommendation: 16GB physical memory per job. Serial production tasks in future will be limited. ARC-CE tests in ATLAS-CRITICAL from 1st October.
 
* CMS: Scale testing of HTCondor and GlideinWMS by OSG - various issues. Reminder: Participate in space monitoring; Update xrootd fallback configuration.
 
* LHCb: dCache storage sites broken when accessed by ROOT6/xrootd; new stripping campaign is currently being prepared; testing new VOMS.
 
* glexec: NTR
 
* Machine job features: NTR
 
* MW readiness: [http://indico.cern.ch/event/332224/ Meeting on 1st October]. DPM, CREAM and BDII verification exercises. [http://indico.cern.ch/event/332224/contribution/3/material/slides/0.pdf MW package reporter development]. Next meeting 19th November.
 
* Multi-core: 50M events/daily for ATLAS. Continue deployment.
 
* SHA-2: Testing new VOMS for each experiment.
 
* WMS decommissioning: with the deployment of the Condor SAM probes nothing is using WMS anymore. Machines off. WG will end.
 
* IPv6: LHCbDIRAC tested and working
 
* Squid monitoring/HTTP proxy: NTR
 
* Network & Tmetrics WG: Shellshock & perfSONAR [https://twiki.cern.ch/twiki/bin/view/LCG/ShellShockperfSONAR news]. PS 3.4 coming.
 
  
  
Line 112: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 7th October'''
+
 
* Access for all VOs to our CREAM CEs has been stopped (apart from ALICE and SNO+).
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* We are currently experiencing a problem with a disk array that holds the Castor databases. Castor performance may be degraded and we await an engineer to fix the faulty array.
+
<!-- *********************************************************** ----->
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 130: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Wedn 01 Oct'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Summary of all the exciting events in Amsterdam last week - EUDAT, EGI big data, RDA
+
* DOME upgrade problems at Edinburgh
* DPM 1.8.9 early testing, and (separately) xroot4 early-ish testing. Supporting multiple VOs in one xroot server.
+
* Data management support/development for IRIS users
  
'''Wedn 17 Sept'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* iRODS - what it is and why it should choose to collapse on Betelgeuse 7.
+
* Rucio reporting
* Technical problems with Vidyo
+
  
'''Wedn 10 Sept.'''
+
'''Wed 16 Oct'''
* High load at L'pool causing low throughput - how to throttle xroot transfers (and is the load necessary or a bug?)
+
* CEPH workshop at CERN report
* Still testing WebFTS
+
* Prep for DPM workshop
+
  
'''Monday 1st September'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* FAX sites to update the C++ N2N rpms .
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* There is interest regarding issues/performance when placing storage outside firewalls. JC will shortly start a (closed) discussion/survey.
+
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''Monday 11th August'''
 
* Pool nodes at RHUL have received test errors.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 155: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 165: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 7th October'''
 
* GridPP metrics need updating for CMS. Any comments on the [http://pprc.qmul.ac.uk/~lloyd/gridpp/metrics.html metrics] page at the moment?
 
* APEL issues for Birmingham and Sussex, and the portal appears to stop at 1st October (being followed-up).
 
  
'''Tuesday 30th September'''
+
'''Tuesday 30th January'''
* Slight delay for Birmingham and Sussex.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
'''Tuesday 23rd September'''
+
'''Tuesday 24th Oct'''
* Slight APEL delay for Birmingham .
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
  
 +
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
  
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
 
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
Line 186: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 194: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
  
'''Tuesday 7th October'''
+
LHCb has added this to their requirements:
* Keydocs were reviewed at the core-ops meeting last week. The situation with updates is improving.
+
* Main GridPP website expected to use Wordpress with a plug-in to cover the gridsite aspects.
+
  
 +
Sites not having an SRM installation must provide:
 +
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
New VOMs rpms to match.
 +
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 +
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
 +
 +
'''General note'''
 +
 +
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 207: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 213: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 6th October'''
 
  
There was a meeting today - link: https://wiki.egi.eu/wiki/Agenda-06-10-2014
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
 +
 
 +
''' Monday 11th March '''
 +
 
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
 +
 
  
* EMI-WN 3.1.0 in SR: if anyone is running this in production please get in touch to help get this past rollout
 
* MySQL 5.0 noted to be under Oracle Lifetime Sustaining Support (for some time now).
 
** See agenda for guidance on middleware consequences
 
* classads "retired" from EPEL repos
 
** See Kashif's ticket: https://ggus.eu/index.php?mode=ticket_info&ticket_id=108878
 
** In the short term these are in the EMI 3 third party repo
 
** long term seek to return these to EPEL
 
* SL/SLC/CentOS 5 Support Lifetime
 
** This was highlighted, though not suggested to be urgent
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 240: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
  
''' Tuesday 30th September'''
+
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
  
* Monitoring meeting last Friday, link : https://indico.cern.ch/event/341748/ , minutes: https://indico.cern.ch/event/341748/material/minutes/minutes.html
+
'''Tuesday 1st December'''
** Of note, we had identified a couple of differences between SAM2/3 where entries were appearing in SAM3 which had not been in SAM2. This is because they were being picked up from the vofeed - from the minutes, "Pablo and Maarten confirm that the VOfeed is the only authoritative source of topology; agreed that all services in the VOfeed will be tested and their availability will be calculated; agreed to add a new attribute to VOfeed to flag which services should be excluded from the official reports."
+
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
  
''' Tuesday 23rd September'''
 
  
* Monitoring Consolidation meeting from Friday cancelled, however, T2 A/R report comparison posted on validation wiki: https://twiki.cern.ch/twiki/bin/view/LCG/ValidationStatus . Comparisons conducted to within 3%.
+
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.  
 +
  
* Next (replacement) meeting this Friday to continue discussions.
 
 
''' Tuesday 16 September '''
 
 
* SAM Nagios probes refactoring TF meeting
 
 
We had first SAM Nagios probe refactoring TF meeting on 12 September. Some of identified issues are listed in TF wiki
 
 
https://wiki.egi.eu/wiki/SAM_Nagios_probes_refactoring_TF
 
 
 
We need operations team opinion on some of the issues
 
 
** Removing LFC tests : Everyone agreed in the meeting that it should be removed
 
** Use of WMS for SAM test
 
** Testing SRM client tools from WN
 
 
 
''' Tuesday 2nd September
 
 
* Monitoring consolation meeting last Friday
 
 
** Validation of SAM2/3 results: https://twiki.cern.ch/twiki/bin/view/LCG/ValidationStatus
 
** 4 UK sites (ECDF, Brunel, Durham, Oxford) had slight discrepancies: Looks either to be because more metrics are now being represented (blue = unknown, site not penalised), or older service still in vo feed (AGIS).
 
** Next step is to compare availabilities for August for SAM2/3 and compare for sites
 
** If sites see any discrepancies between http://dashb-atlas-sum.cern.ch/dashboard/request.py/historicalsmryview-sum and http://wlcg-sam-atlas.cern.ch/dashboard/request.py/historicalsmry for their site, please let me know
 
 
* Squid monitoring TF meeting last Thursday
 
 
** Cosmin presented ALICE CVMFS proposal to revived TF
 
** Notes from meeting: https://twiki.cern.ch/twiki/bin/view/LCG/SquidMonitoringTF20140828MeetingNotes
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 294: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 29th September'''
+
'''Tuesday 5th February'''
* Rota being updated.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 
+
* Few availability tickets on hold
'''Monday 22nd September'''
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
* Quiet week - little to report.
+
* EGI is looking for people to join the ops portal review and testing TF.
+
 
+
'''Tuesday 2nd September'''
+
* Sussex is back in business -  kept closing their low availability alarm wrt the GGUS ticket.
+
* The UCL ticket is now finally receiving some attention.
+
* Ongoing problems at RAL.
+
 
+
'''Tuesday 26th August'''
+
* RAL : Nagios jobs staying in queue for long time - to be investigated.
+
* Sussex : Matt needs help probably from some SGE experts.
+
* UCL : No acknowledgement from the site (ticket escalated to second level).
+
* 100IT : There is an alarm from EGI federated cloud - this needs discussion.
+
* Durham : Availability alarms - require constant closing with some comments. Ticket with devs is open.
+
  
'''Tuesday 12th August'''
+
'''Tuesday 14th August'''
* Last week was quiet.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* Still one or to responses needed for next rota allocations.
+
  
  
Line 329: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th August'''
+
'''Monday 20th November'''
* EMI3 WN tarball update needed soon ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=107869 GGUS 107869])
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Monday 28th July'''
 
* [https://operations-portal.egi.eu/broadcast/archive/id/1180 UMD v.3.8.0] was released on 24th July.
 
  
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 352: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 30th September'''
+
'''Tuesday 11th June
* Shellshock - advice and follow-up.
+
* Note particularly the advisories from WLCG/EGI.
+
 
+
'''Tuesday 23rd September'''
+
* High priority vs critical tests in pakiti.
+
 
+
 
+
* FAX update
+
 
+
'''Monday 8th August'''
+
* There was a security team meeting last Wednesday.
+
* There was a CA TAG meeting also last Wednesday.
+
 
+
'''Monday 11th August'''
+
* Topics as mentioned during the last GridPP technical meeting.
+
 
+
* There is an issue at the moment in the evaluation of vulnerabilities causing everything rated 'High' by Pakiti to display as 'Critical' in the Dashboard.
+
 
+
  
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
* NTR
  
 
|}
 
|}
Line 390: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 398: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 7th October'''
+
'''Monday 5th March'''
* There was a [http://indico.cern.ch/event/342995/ perfSONAR operations meeting last Friday 4th October]. See the [http://indico.cern.ch/event/342995/material/minutes/minutes.html minutes.]
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
  
'''Tuesday 23rd September'''
+
'''Monday 10th September'''
* There was an [https://indico.cern.ch/event/318811/ LHCONE/LHCOPN meeting last week]. These few talks will be of general interest: [https://indico.cern.ch/event/318811/contribution/16/material/slides/0.pdf LHCONE global NOC proposal]; [https://indico.cern.ch/event/318811/contribution/12/material/slides/ perfSONAR update] and [https://indico.cern.ch/event/318811/contribution/20/material/slides/?subContId=0 CMS P2P applications].
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
'''Tuesday 16th September'''
 
* Another reminder of the [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html IPv6 network tests].
 
* There is an [https://indico.cern.ch/event/318811/ LHCONE/LHCOPN meeting] taking place yesterday and today.
 
* RIPE A at Glasgow now live (but tagged ...). Hope to see others soon.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 421: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 6th October 2014, 14.30 BST'''<br />
 
On top of the lovely tickets there was a discussion in the Ops team last week and it was mentioned how it would be handy to look how sites were doing on the VO nagios, so I thought I'd go over that here.
 
 
[https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?host=all&servicestatustypes=16&hoststatustypes=15 VO Nagios]
 
 
Site's that seem to be having trouble on one or more of their nodes at the time of writing are:<br />
 
Durham: pheno and gridpp<br />
 
Lancaster: pheno and gridpp<br />
 
Sussex: snoplus<br />
 
EFDA-JET: gridpp, pheno, southgrid<br />
 
Liverpool: gridpp, snoplus<br />
 
Sheffield: gridpp, snoplus<br />
 
QMUL: t2k.org<br />
 
TIER 1: snoplus and t2k<br />
 
Although only Lancaster, Sheffield and the Tier 1 seem to be having really long term problems.
 
 
(I'm still trying to think how best to parse this information, so my apologies that it's poorly presented).
 
 
On to the tickets.
 
 
Only 24 open UK tickets this month (organised by site).
 
 
'''SUSSEX'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108765 108765](24/9)
 
Sussex have a ROD ticket, originating from a glue validation error (although it's just picked up some SHA-2 failures). Matt RB was away
 
though, so not much progress - Matt can you get to it this week? In progress (3/10)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=109115 109115](6/10)<br />
 
A fresh ticket from cms, complaining that RALPP don't have any backup squids listed in their site xml file. Assigned (6/10) and closed on (7/10) as the site name was old.
 
 
'''BRISTOL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106325 106325](18/6)<br />
 
CMS pilots losing network connectivity. CMS have confirmed that it is only a subset of the Bristol clusters seeing pilots dropping connections. Winnie has continued to poke and prod this, and between her and CMS they've (more or less) ruled out natting as the cause of the problem. Bristol are still quite stuck, and kind of hoping some unrelated network tweaks might sweep this issue away. On Hold (2/10)
 
 
'''ECDF'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95303 95303](1/7/13)<br />
 
tarball glexec deployment - see Lancaster entry on the same issue. On hold (29/8)
 
 
'''DURHAM'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108273 108273](5/9)<br />
 
Durham experienced a sudden, odd change in their perfsonar results (outbound bandwidth went up, in bound dropped). The Durham chaps were looking into this but were interrupted by this shellshock business. Oliver has included some long term plans in the ticket and will update it again when they have their perfsonar back. On hold (6/10)
 
 
'''SHEFFIELD'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108716 108716](23/9)<br />
 
Snoplus jobs not running at Sheffield. Elena had to bash one of her CEs into shape, but it should be fixed now and has asked Matt M if he still sees a problem. Waiting for reply (6/10)
 
 
'''MANCHESTER'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=109001 109001](2/10)<br />
 
Not quite a site problem, but David M was having trouble committing to the SVN hosted at Manchester (and a reminder that I believe the "official" way of reporting problems with these services is to ticket the site). It looks like this has been solved and the ticket can probably be closed. In progress (3/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=109049 109049](4/10)<br />
 
Atlas transfer problems - the underlying issue being a downed (and dead) disk server. Alessandra is doing the lost file declaration stuff and offered to provide lists of these files to the users directly. Not much more that Manchester can do. In progress (6/10)
 
 
'''LANCASTER'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=100566 100566](27/1)<br />
 
Poor, unexplained perfsonar performance. Although some ideas have been made how to tackle this, holidays then shellshock have got in the way of implementing them. On hold (1/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108715 108715](23/9)<br />
 
Sno+ jobs not running at Lancaster. Hopefully after a tweak to the information system on our CEs I fixed this - as Duncan pointed out things are looking okay on the VO nagios. I've asked Matt M how things are looking for "real" Sno+ work. Waiting for reply (1/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95299 95299](1/7/13)<br />
 
tarball glexec ticket. As mentioned in last week's Ops meeting, due to holidays there has been no progress over the last month but things look hopeful. On hold (9/9)
 
 
'''UCL'''
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95298 95298](1/7/13)<br />
 
Non-tarball glexec ticket. Ben's been trying to install this, but having dependency troubles - did anyone who uses rpms notice this when they last tried to install the glexec WN? In progress (29/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=109039 109039](3/10)<br />
 
Another Glue2 validation ROD ticket. In progress (3/10)
 
 
'''IMPERIAL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108723 108723](23/9)<br />
 
Chris W has ticket Imperial with a few dirac file catalogue queries. Duncan responded with some documentation that others might also find useful and some other information. I believe the ticket is now waiting for feedback from Chris (who may in turn be waiting for feedback from the other VO user groups). Waiting for reply (1/10)
 
 
'''EFDA-JET'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108735 108735](23/9)<br />
 
biomed have asked that JET activate the biomed cvmfs repo at their site. Ticket seen but no news or action. In progress (23/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=97485 97485](21/9/13)<br />
 
One of the ancient tickets. LHCB having authentication errors at Jet. No change. On hold (1/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=109080 109080](6/10)<br />
 
A fresh ROD ticket about a number of alarms - at first glance I would say a certificate has expired. In progress (6/10)
 
 
'''100IT'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108356 108356](10/9)<br />
 
VM images from fedcloud.egi.eu not available at 100IT. This ticket showed up an issue with creating an AppDB profile, but that has since been solved. No news on the state of this ticket other then that the issue persists. In progress (1/10)
 
 
'''THE TIER 1'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107935 107935](27/8)<br />
 
"BDII vs SRM inconsistent storage capacity numbers". No news on this for a long time. This ticket really could do with some love (or at least on holding!). In progress (3/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106324 106324](18/6)<br />
 
CMS pilots losing connection, similar to the Bristol ticket. The issue has been tracked to being *something* in the Tier 1's internal network after comparing firewall rules to RALPP. CMS have updated the ticket with some more information and some nice plots, but the long and the short of it is the problem persists. In progress (1/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108546 108546](16/9)<br />
 
atlas seeing failures on the RAL-LCG2_HIMEM_SL6 queue. Ticket in an odd state - the atlas shifters seem to think the problem was transient but Gareth and go are seeing a lot of load on diskservers despite nothing on BiGpanda. The RAL team is keeping an eye, but this ticket could do with some updates/on holding in the mean time. In progress (22/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107880 107880](26/8)<br />
 
Sno+ asking RAL for help/alternatives with srmcping for a small group of seemingly awkward Suse using users. Some input from others but not much word from Sno+ or the Tier 1 - Chris, could you please take a peek with your small VO hat on? In progress (30/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108944 108944](1/10)<br />
 
CMS running into a lot of "file not found" errors when running a AAA check at RAL, and asking if things are alright. When looking over the whole Castor namespace it appears that all files are present and correct which doesn't explain why CMS had trouble finding them. In progress (1/10)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108845 108845](27/9)<br />
 
Atlas seeing gridftp timeouts. This looks to be a hotspot problem (at this point in the review I'm just skim reading tickets). Atlas also report seeing deletion errors, and have included links. I'm not sure if this ticket will be impacted by this afternoon's Castor intervention. Still very much In Progress (5/10)
 
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 543: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 16th Sep'''
+
'''Monday 20th November'''
* Multi VO nagios maintained at Oxford has been upgraded to add ARC CE tests.  
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
* https://vo-nagios.physics.ox.ac.uk/nagios/
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
* It is currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk
+
 
* Should we start monitoring it more actively and open ticket for sites failing tests ?
+
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 +
 
  
  
Line 557: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 563: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 11th August'''
 
* Steve J sent an email to hyperk on 7th regarding "software directory for Hyperk (CVMFS)" and entries in the VO ID card.
 
  
"Monday 14th July 2014"
+
'''Monday 20th November'''
* HyperK.org will initially use remote storage (irods at QMUL) - so CPU resources would be appreciated.  
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 
+
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
"Monday 30 June 2104"
+
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
* HyperK.org request for support from other sites
+
** 2TB storage requested.
+
** CVMFS required
+
 
+
* Cernatschool.org
+
** WebDAV access to storage -world read works at QMUL.
+
** ideally will configure federated access with DFC as LFC allows.
+
  
  
Line 595: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th September'''
+
'''Date'''
* Intel announced the new generation of Xeon based on Haswell.
+
 
  
'''Tuesday 20th May'''
 
* Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 659: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 1st October 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-10-01 Operations report]
+
* It ws planned to withdraw access to the Cream CEs for all VOs apart from ALICE yesterday (30th September). However, this has been delayed.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 728: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A