Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,365 intermediate revisions by 43 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 15th September 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Monday 15th September'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* Steve has setup an [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html IPv6 network test].
+
** https://indico.cern.ch/event/776832/
* Duncan asked if the gfal replacement is not on WNs by default?
+
* DIRAC downtime this week due to the move to Slough - good luck!
* The official [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20140910 GDB summary notes of the 10th September meeting] are now available.
+
* EGI Ops meeting this week.
* [https://twiki.cern.ch/twiki/bin/view/LCG/20140910PreGDB Notes] from the [http://indico.cern.ch/event/272791/ pre-GDB on Clouds] are also available.
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
* Do we still have sites suffering from ARGUS instabilities? CERN noticed ongoing problems ([ https://ggus.eu/index.php?mode=ticket_info&ticket_id=105666 GGUS 105666]).
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
* A reminder of this [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOperationsWeb top-level WLCG page].
+
** State of SRM usage at DPM sites?
* All VOMS update tickets closed. Tests passing. Thank you!
+
* [  https://indico.cern.ch/event/340943/ 3rd interim Foundation Board (iFB) of the HEP Software community meeting] this Wednesday, 17th September at 15.00 Geneva time. Plans to identify people to lead the activities.
+
  
 +
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
  
'''Monday 8th September'''
 
* Be ready for the new CERN and ops VOMS. Compare the prod and preprod instances for:
 
** ALICE:[http://cern.ch/go/6fbH preprod] and [http://cern.ch/go/Cb7F prod]. Birmingham both.
 
** ATLAS:[http://cern.ch/go/R9vf preprod] and [http://cern.ch/go/z8q9 prod]. UCL pre only. QMUL both.
 
** CMS:[http://cern.ch/go/GQ6h preprod] and [http://cern.ch/go/l9x6 prod]. QMUL both. RHUL both. UCL??. ECDF intermittent.
 
** LHCb:[http://cern.ch/go/Zj9z preprod] and [http://cern.ch/go/6qX7 prod]. Fine.
 
* An EMI3 WN tarball update has been done by Matt (see also [https://ggus.eu/index.php?mode=ticket_info&ticket_id=107869 GGUS 107869]).
 
* There is an LHCONE/LHCOPN meeting next week on 16th and 17th ([https://indico.cern.ch/event/318811/ agenda]). It would be good to have some remote participation.
 
* Website redesign - please complete [https://docs.google.com/forms/d/1REl4Utss1RZB7yxX0jAJ7aYDIhdsOXEPedGVZU0J27c/viewform?usp=send_form this survey].
 
* For multicore - a reminder for sites running multicore and CREAM that there is an option in APEL to account multicore/multicpu. By default it is off.
 
* There is a [http://indico.cern.ch/event/272791/ pre-GDB this afternoon on Clouds].
 
* There is a [http://indico.cern.ch/event/272777/ GDB this week]. Any input?
 
* Storage placement - survey TBC.
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 61: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 68: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 16th September'''
+
'''Tuesday 11th June'''
* The next core ops meeting is on 18th September.
+
 
* The next multi-core meeting is today at 14:30 CERN time. It is on dynamic partitioning with LSF at CNAF.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
  
'''Monday 8th September'''
 
* There will be a multi-core meeting on Tuesday 9th at 14:30 (CERN time). Covering reviews of the UGE setup for multicore jobs at CCIN2P3 and of the method to passing job requirement arguments to batch systems via CE. ([https://indico.cern.ch/event/339461/ Agenda])
 
* A review of last week's ops meeting ([https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140904 minutes]) follows:
 
* No operations news
 
* The [http://linuxsoft.cern.ch/wlcg/ WLCG repository] will become signed soon.
 
* Baselines: No new EMI/UMD releases since last meeting.
 
* MW issues: Missing key usage extension in delegated proxy. Fix for CREAM UI in October. Impacts ATLAS-Rucio intengration.
 
* T1: FTS2 decommissioning done at 3 sites and 1 process another 3. NDGF-T1 is testing FAX using native xrootd and nfs4-mount from dCache.
 
* OSG following up on how to discover HTCondor CEs in the information system.
 
* Oracle: GoldenGate migration fine for IN2P3.
 
* T0: AFS UI still used. lxplus5 target close of 14th Sept 2014. ARGUS - believe seen again unresponsive CAs problem.
 
* T2: NTR
 
* ALICE: Low activity. Job efficiencies issue still open.
 
* ATLAS: Rucio test and normal DQ2 production activity are producing a slightly higher load on the storage of the sites.
 
* CMS: Reminders - Target for CVMFS 2.1.19; update xrootd fallback configuration; add "Phedex Node Name" to site configuration.
 
* LHCb: Mainly simulation work. SHA2 certificate testing started.
 
* Network & transfer metrics: [https://indico.cern.ch/event/336520/ Meeting Monday 8th Sept]. [https://indico.cern.ch/event/336520/material/slides/0.pdf Slides]. Pythia Network Diagnosis Infrastructure funded by NSF - perfSONAR-PS data to identify and localize network problems using the Pythia algorithms.
 
* Tracking tools: NTR
 
* FTS3 deployment TF: Done - FTS3 now in production. New releases every 3-4 months. There are lists for feature requests and also support. Some improvements to FTS dashboard.
 
* glexec TF: NTR.
 
* Machine/job features: New lead for condor part Marian Zvada.
 
* MW readiness: T0 pre-prod to install package reporter. Latest Cream-CE and Bdii update have been installed at LNL-T2. Next [https://indico.cern.ch/event/332224/ meeting 1st October].
 
* "MW software for the verification activity" uses the package reporter results to aggregate per software component, is used to tag good/bad versions, publishes the results in a dashboard.
 
* Multicore: ATLAS 11 T1s and 35 T2s; CMS at T1s and some US T2s. Decided the TF would take on board the standardization of the blah scripts (and other CEs scripts if needed) for the scheduling parameters
 
* SHA-2: Compliance being tested. [https://operations-portal.egi.eu/broadcast/archive/id/1190 Broadcast sent]. Deadline 15th September. Switch SAM. Then expt. job and data systems. 88->55 tickets.
 
* WMS decommissioning: Condor-based SAM probes due 1st October.
 
* IPv6: NTR.
 
* Squid mon & HTTP proxy discovery: Working on [http://wlcg-squid-monitor.cern.ch/snmpstats/all.html automated MRTG monitor]. Working on documentation.
 
  
  
'''Tuesday 2nd September'''
 
* The next WLCG ops coordination meeting is this [https://indico.cern.ch/event/326087/ Thursday 4th September].
 
* There will be a Tier-1/2 feedback section in the agenda IF there is feedback/input. Do we have any items to raise?
 
  
  
Line 123: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 8th September'''
+
 
* There was a brief network interruption yesterday (Tuesday 8th Sep) to the Tier1 network at around 5pm local time. This lasted a few minuites and the cause is being investigated.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* We are planning to stop access for all VOs apart from ALICE to our CREAM CEs. The proposed date is 23rd September.
+
<!-- *********************************************************** ----->
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 140: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wedn 10 Sept.'''
 
* High load at L'pool causing low throughput - how to throttle xroot transfers (and is the load necessary or a bug?)
 
* Still testing WebFTS
 
* Prep for DPM workshop
 
  
'''Monday 1st September'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* FAX sites to update the C++ N2N rpms .
+
* DOME upgrade problems at Edinburgh
* There is interest regarding issues/performance when placing storage outside firewalls. JC will shortly start a (closed) discussion/survey.
+
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''Monday 11th August'''
 
* Pool nodes at RHUL have received test errors.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 157: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 167: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th September'''
+
'''Tuesday 6th February'''
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
  
'''Tuesday 2nd September'''
+
'''Tuesday 30th January'''
* Please check [http://wlcg-rebus.cern.ch/apps/capacities/sites/ REBUS figures] for your site.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: Okay.
+
  
'''Tuesday 26th August'''
+
'''Tuesday 24th Oct'''
* Sheffield has stopped publishing.
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 185: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 193: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
  
'''Tuesday 9th September'''
 
* Looking a bit better. Will review in more details at core ops meeting (next Thursday 18th@11:30am unless there is a clash)
 
  
'''Tuesday 2nd September'''
+
'''General note'''
* This work needs a kick-start! Reminders should now be being received.
+
* Tom/Andrew in discussion about options for main site - main considerations are Wordpress and Drupal.
+
  
 +
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 209: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 215: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th September'''
 
  
* Meeting minutes from [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=2310 yesterday].
+
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
** Mostly a short meeting to give updates on product updates over the summer.
+
''' Monday 11th March '''
** Please read the agenda/minutes for a full set but to pull out a couple of things:
+
  
** Note that as per http://dmc.web.cern.ch, gfal and lcg-util are in end-of-life mode and support will end for both on 1st November.  
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
** FTS3, SQUID and CVMFS will soon be include in UMD; early adopters are requested
 
  
* Next meeting planned for October 6th.
+
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Monday 8th September'''
 
* There is an [https://wiki.egi.eu/wiki/Agenda-08-09-2014 EGI ops meeting today].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 245: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
''' Tuesday 16 September '''
+
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
  
* SAM Nagios probes refactoring TF meeting
+
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
  
We had first SAM Nagios probe refactoring TF meeting on 12 September. Some of identified issues are listed in TF wiki
+
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
  
https://wiki.egi.eu/wiki/SAM_Nagios_probes_refactoring_TF
 
 
 
We need operations team opinion on some of the issues
 
  
** Removing LFC tests : Everyone agreed in the meeting that it should be removed
+
'''Tuesday 16th June'''
** Use of WMS for SAM test
+
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
** Testing SRM client tools from WN
+
* Feedback welcome.
 +
  
 
''' Tuesday 2nd September
 
 
* Monitoring consolation meeting last Friday
 
 
** Validation of SAM2/3 results: https://twiki.cern.ch/twiki/bin/view/LCG/ValidationStatus
 
** 4 UK sites (ECDF, Brunel, Durham, Oxford) had slight discrepancies: Looks either to be because more metrics are now being represented (blue = unknown, site not penalised), or older service still in vo feed (AGIS).
 
** Next step is to compare availabilities for August for SAM2/3 and compare for sites
 
** If sites see any discrepancies between http://dashb-atlas-sum.cern.ch/dashboard/request.py/historicalsmryview-sum and http://wlcg-sam-atlas.cern.ch/dashboard/request.py/historicalsmry for their site, please let me know
 
 
* Squid monitoring TF meeting last Thursday
 
 
** Cosmin presented ALICE CVMFS proposal to revived TF
 
** Notes from meeting: https://twiki.cern.ch/twiki/bin/view/LCG/SquidMonitoringTF20140828MeetingNotes
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 287: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 2nd September'''
+
'''Tuesday 5th February'''
* Sussex is back in business -  kept closing their low availability alarm wrt the GGUS ticket.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* The UCL ticket is now finally receiving some attention.
+
* Few availability tickets on hold
* Ongoing problems at RAL.
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 
+
'''Tuesday 26th August'''
+
* RAL : Nagios jobs staying in queue for long time - to be investigated.
+
* Sussex : Matt needs help probably from some SGE experts.
+
* UCL : No acknowledgement from the site (ticket escalated to second level).
+
* 100IT : There is an alarm from EGI federated cloud - this needs discussion.
+
* Durham : Availability alarms - require constant closing with some comments. Ticket with devs is open.
+
  
'''Tuesday 12th August'''
+
'''Tuesday 14th August'''
* Last week was quiet.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* Still one or to responses needed for next rota allocations.
+
  
  
Line 315: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th August'''
+
'''Monday 20th November'''
* EMI3 WN tarball update needed soon ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=107869 GGUS 107869])
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Monday 28th July'''
 
* [https://operations-portal.egi.eu/broadcast/archive/id/1180 UMD v.3.8.0] was released on 24th July.
 
  
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 338: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
 +
'''Tuesday 11th June
  
* FAX update
+
* NTR
 
+
'''Monday 8th August'''
+
* There was a security team meeting last Wednesday.
+
* There was a CA TAG meeting also last Wednesday.
+
 
+
'''Monday 11th August'''
+
* Topics as mentioned during the last GridPP technical meeting.
+
 
+
* There is an issue at the moment in the evaluation of vulnerabilities causing everything rated 'High' by Pakiti to display as 'Critical' in the Dashboard.
+
 
+
 
+
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
  
 
|}
 
|}
Line 369: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 377: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 16th September'''
+
'''Monday 5th March'''
* Another reminder of the [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest_v6.html IPv6 network tests].
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
* There is an [https://indico.cern.ch/event/318811/ LHCONE/LHCOPN meeting] taking place yesterday and today.
+
 
* RIPE A at Glasgow now live (but tagged ...). Hope to see others soon.
+
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
  
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
'''Tuesday 9th September'''
+
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
* RIPE probes now hosted: Cambridge, Sheffield, Liverpool, Lancaster (& Oxford and QMUL). Glasgow connected but no data.
+
* RIPE probes not yet hosted: 6 sites.
+
  
'''Tuesday 2nd September'''
 
* Only a few of the RIPE probes went live last week - any issues at the other sites to be discussed?
 
* JANET is going to deploy a perfSONAR instance on one of the exchange points in London. They hope it will help raise awareness of issues with local systems affecting their transfer performance.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 403: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 8th September 2014, 15.00 BST'''<br />
 
25 Open UK tickets this week.
 
  
'''NO SITE IN PARTICULAR'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108182 108182](3/9)<br />
+
As seen on TB-SUPPORT, the NGI has a ticket telling it to get sites to have the new voms servers configured for the switch over. Jeremy has kindly offered to field the ticket. I think we all have this in hand, but as I type this I realise I may have forgotten to set things up for the ops VO. I encourage everyone to double check their readiness ahead of next Monday's switchover. Assigned (8/9)
+
  
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106615 106615](2/7)<br />
 
The RAL FTS2 service has been shutdown for nearly a week now, so I suspect this ticket tracking the switch off can be closed. In progress (3/9)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108306 108306](8/9)<br />
 
CMS having trouble running a "locateall" AAA test at RALPP (TBH I don't know what that is) - Chris has let them know that this is due to their xrootd reverse proxy being down, and it should be up and running in a day or two after it's reinstalled. In progress (8/9)
 
 
'''OXFORD'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107911 107911](27/8)<br />
 
As mentioned last week,  Sno+ have been having trouble as they can't assign software tags on Arc CEs, and they use these tags to do stuff like black/white listing. There was some dicussion on this in the ticket, but it fizzled out- I suspect due to the topic moving offline. Can it have an update please? In progress (27/8)
 
 
'''BRISTOL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106554 106554](29/6)<br />
 
CMS transfer problems to Bristol. Winnie put an update, where she mentioned she has applied a fix to their Storm that might have fixed the problem. Maybe. She's asked if the problem still persists, as the monitoring links provided have all gone stale. Lukasz is on leave, can anyone CMS savvy help her? Waiting for reply (8/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106325 106325](18/6)<br />
 
CMS Pilots losing contact with home base. No progress since Winnie noticed that the problem only seems to affect one of the Bristol clusters, but none expected due to leave. On Hold (8/9)
 
 
''Update - Bristol have another, possibly related CMS ticket [https://ggus.eu/index.php?mode=ticket_info&ticket_id=108317 108317]
 
 
'''EDINBURGH'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108100 108100](1/9)<br />
 
Maarten ticketed ECDF about this CE's not having the new voms servers configured. Andy is working on it. There's a reminder that on top of adding the right configs services do need restarting. In progress (5/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95303 95303](1/7/2013)<br />
 
glexec tarball ticket. There's a bit more movement on getting this done, but it's all on me to get the tarball glexec working still - naught the Edinburgh chaps can do.
 
 
'''DURHAM'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108273 108273](5/9)<br />
 
Duncan noticed some interesting goings on on the Durham perfsonar page. The Durham chaps are talking to their networking team to figure out what the flip is going on. In progress (8/9)
 
 
'''SHEFFIELD'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107886 107886](26/8)<br />
 
Duncan's unwavering gaze also noticed a problem on Sheffield's perfsonar. Elena was tweaking it when it broke, and it looks like it's still broken, any luck fixing it Elena? In progress (26/8)
 
 
'''LIVERPOOL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108288 108288](8/9)<br />
 
Liverpool got a ROD ticket when their CREAM CE got poorly. Steve worked his magic and things were fixed, but Gareth asks about the persisting BDII tests still failing. Solved (8/9) ''Update - the problems seems to have disappeared, so was probably just a artifact of BDII lag.''
 
 
'''LANCASTER'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=100566 100566](27/1)<br />
 
My personal shame number 1. Lancaster's poor perfsonar performance. Despite a reinstall of the box and not showing any signs of a bottle neck in transfers or running manual tests we still have really poor perfsonar results. No problems with the network have been found. Duncan helped formulate a plan at GridPP, but I haven't had the time to test it out yet. On hold (8/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95299 95299](1/7/13)
 
My personal shame number 2 - Lancaster's glexec deployment ticket. Some news in that I have something I'd like to test now - I just need to find time to test it, then see if I can package it somehow. On hold (8/9)
 
 
'''UCL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=95298 95298](1/7/13)<br />
 
UCL's glexec deployment ticket. This work was pushed back to the end of August - any news on it? On Hold (29/7)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107711 107711](15/8)<br />
 
A ROD ticket for UCL APEL publishing errors. The apel admins got involved and things are looking better now - although Gareth points out that there is some missing data in the Spring. In progress (8/9)
 
 
'''QMUL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107799 107799](21/8)<br />
 
Pointing VO_SNOPLUS_SNOLAB_CA_SW_DIR to /cvmfs/snoplus.gridpp.ac.uk. No news for a while on this after it was acknowledged - has the job fallen to the bottom of the stack? In progress (22/8) ''Solved now, issue was dealt with last week but the ticket wasn't updated.''
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=108217 108217](3/9)<br />
 
Duncan ticketed QM about one of their pefsonar boxen - which Dan pointed out is their IPv6 perfsonar. So does that mean this ticket can be closed? In progress (4/9) ''Update - Duncan would like the ticket kept open to track this node's assimmalation into the mesh.''
 
 
'''EFDA-JET'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=97485 97485](21/9/13)<br />
 
Longstanding LHCB ticket with JET. No movement on this, but none was expected. Still if anyone wants to heroically interject with some ideas I'm sure it would be appreciated. On hold (29/7)
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107880 107880](26/8)<br />
 
As mentioned last week, Matt M of Sno+ fame has a user who only has access to srm tools and is having trouble accessing files at RAL. Brian has suggested using the webfts, but Matt doesn't think this will work for the user's limited abilities. Any thoughts? In progress (8/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107935 107935](27/8)<br />
 
Inconsistency between BDII and SRM reported storage capacity...hang on, haven't we been here before (105571)? It's not quite the same problem, but it's close. Brian has confirmed the mismatch, Maria has asked for an explanation for it (and how it only really effects ATLASHOTDISK). In progress (3/9)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=105405 105405](14/5)<br />
 
Checking the site firewall configuration for RAL's Vidyo router. Last update was in July, is the dialogue between the Vidyo team and the RAL networking chaps ongoing? On hold (1/7)
 
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=106324 106324](18/6)<br />
 
The Tier 1's version of 106325 - CMS pilots losing contact. This was waiting on the firewall expert getting back from hols to compare the settings between the Tier 1 and Tier 2 (who don't see this issue). Are they back yet? On Hold (14/8)
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 499: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 16th Sep'''
+
'''Monday 20th November'''
 
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
Multi VO nagios maintained at Oxford has been upgraded to add ARC CE tests.  
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 
+
https://vo-nagios.physics.ox.ac.uk/nagios/
+
 
+
It is currently monitoring gridpp, pheno, t2k.org, snoplus.snolab.ca, vo.southgrid.ac.uk
+
 
+
Should we start monitoring it more actively and open ticket for sites failing tests ?
+
 
+
'''Monday 14th July'''
+
 
+
Winnie reported on Saturday 12th July that most of the UK sites are failing nagios test. Problem started with unscheduled power cut at a Greek site hosting EGI Message broker (mq.afroditi.hellasgrid.gr) around 2PM on 11th July. Message broker was put in downtime but topbdii's continued to publish it for quite long time.  Stephen Burke mentioned in TB support thread that now default caching time is 4 days. When I checked on Monday morning only Manchester was still publishing mq.afroditi and it went away after Alessandra manually restarted top bdii. It seams that Imperial is configured with much shorter cache time.
+
Only Oxford and Imperial was almost not affected and the reason may be that Oxford WN's have Imperial top bdii as first option in BDII_LIST. Other NGI's have reported same problem and this outage is likely to be considered when calculating availability/reliability. All Nagios tests came back to normal now.
+
 
+
Emir reported this on tools-admin mailing list
+
"We were planning to raise this issue at the next Operations meeting. In these extreme cases 24h cache rule in Top BDII has to be somehow circumvented."     
+
  
'''Tuesday 1st July'''
+
'''Tuesday 18th July'''
* There was a monitoring problem on 26th June. All ARC CE's were using storage-monit.phyics.ox.ac.uk for replicating files as part of the nagios testing. storage-monit was updated but not re-yaimed until later.  Storage-monit was broken for the morning leading to all ARC SRM tests failing.
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
'''Tuesday 24th June'''
 
* An update from Janusz on DIRAC:
 
* We had a stupid bug in Dirac which affected the gridpp VO and storage. Now it is fixed and I was able to successfully upload a test file to Liverpool and register the file with the DFC
 
* The async FTS is still under study, there some issues with this.
 
*I have a link to software to sync user database from a VOMS server, haven’t looked into this in detail yet.
 
  
  
Line 534: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 540: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 11th August'''
 
* Steve J sent an email to hyperk on 7th regarding "software directory for Hyperk (CVMFS)" and entries in the VO ID card.
 
  
"Monday 14th July 2014"
+
'''Monday 20th November'''
* HyperK.org will initially use remote storage (irods at QMUL) - so CPU resources would be appreciated.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 
+
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
"Monday 30 June 2104"
+
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
* HyperK.org request for support from other sites
+
** 2TB storage requested.
+
** CVMFS required
+
 
+
* Cernatschool.org
+
** WebDAV access to storage -world read works at QMUL.
+
** ideally will configure federated access with DFC as LFC allows.
+
 
+
 
+
'''Monday 16 June 2014'''
+
* CVMFS
+
** Snoplus almost ready to move to CVMFS - waiting on two sites. Will use symlinks in existing software
+
 
+
* VOMS server: Snoplus has problems with some of the VOMS servers - see ggus 106243 - may be related to update.  
+
 
+
 
+
'''Tuesday 15th April'''
+
* Is there interest in an FTS3 web front end? ([http://indico.cern.ch/event/272620/contribution/11/material/slides/1.pdf more details])
+
  
  
Line 583: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 9th September'''
+
'''Date'''
* Intel announced the new generation of Xeon based on Haswell.
+
 
  
'''Tuesday 20th May'''
 
* Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 647: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 10th September 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-09-10 Operations report]
+
* CMS are now writing to the newer T10KD tapes and migration of CMS data from 'B' to 'D' tapes is underway.
+
* Access to the Cream CEs will be withdrawn apart from leaving access for ALICE. This has been announced for Tuesday 30th September.  
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 717: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A