Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,429 intermediate revisions by 43 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 1st September 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
Monday 1st September'''
+
** https://indico.cern.ch/event/776832/
* A/R results for August
+
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Monday 25th August'''
 
* [https://indico.cern.ch/event/321806// GridPP33] took place in Ambleside last week.
 
* Our thanks to Sam and Mohit, Year in Industry students, who have now finished. There will be less ticket prompts until new students are in place.
 
* Reminder of [https://operations-portal.egi.eu/broadcast/archive/id/1102 17th March message]: new VOMS servers for Ops and LHC experiments. The deadline is Monday 15th September. The experiment pre-prod instances will switch earlier. Already started: [http://grid-monitoring-preprod.cern.ch/mywlcg/ss/?vo=93&profile=2&iDisplayLength=-1&period=pW ALICE 23rd July]; [http://grid-monitoring-preprod.cern.ch/mywlcg/ss/?vo=35&profile=18&iDisplayLength=-1&period=pW LHCb 22nd August]. Pending [http://grid-monitoring-preprod.cern.ch/mywlcg/ss/?vo=168&profile=5&iDisplayLength=-1&period=pW ATLAS 28th August]; [http://grid-monitoring-preprod.cern.ch/mywlcg/ss/?vo=116&profile=11&iDisplayLength=-1&period=pW CMS 28th August].
 
* For CMS: transition Savannah to GGUS (CMS Computing Operations): September 1st - Disable submission of new tickets; September 30th - Close Savannah (still open issues will be transferred to GGUS).
 
* ATLAS RIPE probes handed out to some GridPP sites; at these a welcome notification message should have been received.
 
* A UK CA TAG meeting is planned for 3rd September. One discussion item concerns an opportunity to migrate the UK e-Science CA to a new commercial CA as part of a JANET agreement.
 
* On 18th August the main DNS servers associated to the egi.eu domain were switched from Nikhef to CESNET.
 
  
'''Tuesday 12th August'''
+
'''Tuesday 11th June'''
* Bristol suggests it is seeing connection problems mostly, but not exclusively, to US sites.
+
* The [https://gocdb-test.esc.rl.ac.uk/portal/ GOCDB test server] has been updated to [https://wiki.egi.eu/wiki/GOCDB/Release4/Development/MultipleEndpointsPerService v5.3].
+
* GOCDB has received a new service type request for ‘egi.Perun’.  As required by the lightweight EGI review process, we are required to respond with any suggestions/issues before 14th August. Perun is used by the EGI Fed Cloud to manage users access rights to cloud services. Therefore, every cloud VO needs to be supported by Perun, this is why it has been requested to be properly registered and then monitored.
+
* LHCb have reported that the dCache problems they have seen recently do not seem to have any correlation with a particular dCache version. Even different endpoints in the same site could fail or work OK. This is all related to xrootd endpoints and some sites have solved the issues that seem to be caused by misconfigurations on their site.
+
* GridPP will receive some RIPE probes for distribution - note there is now a waiting list for UK based requests.
+
  
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Tuesday 5th August'''
 
* There was an EGI Operations Management Board (OMB) [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2191 meeting last week]. Several UK  issues (VO DM/job approaches, NFS area futures and availability alarm handling) were input for discussion, but due to the tight agenda will be reviewed at the next EGI ops meeting.
 
* Some things to note from the OMB (see also the [https://indico.egi.eu/indico/getFile.py/access?resId=0&materialId=minutes&confId=2191 meeting minutes]):
 
** Editing of the the EGI wiki is now EGI members (SSO) and on request.
 
** A reminder to keep GOCDB information up-to-date - it is used to populate various tools.
 
** A federated [https://documents.egi.eu/public/ShowDocument?docid=2114  cloud security survey] is in progress.
 
** There is an EGI [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2160 Big Data conference 24th-26th September].
 
** Resource requests - 19 pools registered. 13 available for allocation. It is a brokering service only. There is one request in the system for cloud resources.
 
** There is a new [https://documents.egi.eu/public/ShowDocument?docid=31 draft Resource Centre OLA] for comment till 15th August. Updates coming for Technical Policy, User and EGI.eu SLAs. Refer to the [https://wiki.egi.eu/wiki/Performance performance wiki page] for a chart showing relevance.
 
** A monthly release of the Ops portal following 1 week testing and input from TAG has been proposed.
 
** SAM probes Task Force has been setup to assess the support status of probes and improve documentation. An initial [https://wiki.egi.eu/wiki/SAM_Nagios_probes_refactoring_TF#Identified_Issues list of issues] is available.
 
** There are plans for VAPOR - combined Vo Administration and operations PORtal. There is a [https://operations-portal.egi.eu/vapor/ prototype] available.
 
  
  
Line 70: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 77: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 26th August'''
+
'''Tuesday 11th June'''
* There was a [https://indico.cern.ch/event/326086/ WLCG coordination meeting] last Thursday.  [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140821] are available.
+
 
* News: CERN-IT to terminate the SLC5-based interactive and batch services (lxplus5 and lxbatch5) soon. The current target date is 30 September 2014.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* A study to assess how operational effort in WLCG is used and could be optimised will launch in the next weeks. This will cover the management of sites and site services. It will (generally) not cover the experiment computing operations.
+
 
* MW baselines: No recent updates
+
'''Tuesday 14th May'''
* MW Issues: Storm and Argus integration issues.APEL fails to parse accounting records , affecting APEL 1.2.1 (released mid-August). Sites affected should move to 1.2.2. CVMFS upgrade to 2.1.19 almost done.  
+
* Next meeting this Thursday.
* Oracle: [https://twiki.cern.ch/twiki/bin/view/LCG/OracleDeployment upgrade plans] now available.
+
 
* T0: ARGUS latest version deployed. Looking at decommissioning AFS UI. A few users have already contacted CERN pointing out that they need SLC5 to build their software, as they haven't completed the porting to SLC6 yet - plan to push users to VMs on OpenStack.
+
'''Tuesday 9th April'''
* Confirmation wanted on the AFS UI tarball support.
+
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
* T1: No feedback.
+
 
* T2: No feedback.
+
 
* ALICE: steady production and analysis activities throughout the past weeks.  
+
'''Tuesday 26th March'''
* ATLAS: No report.
+
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
* CMS:  Finishing samples for CSA14; Computing Analysis Software challenge 2014 extended till mid-September. Users happy with AAA and miniAOD. Reminder for sites: Need to change xrootd redirectors, see this hn post; Need to adapt site-local-config.xml to include <phedex-node value=“Tx_CO_Site{_type}"/> (e.g. value=“T1_DE_KIT_Disk") in the <local-stage-out> section and the same format (but the PhEDEx name for the fallback endpoint) in <fallback-stage-out> NEW; Need to upgrade to CVMFS >= 2.1.19 immediately.  
+
* Next meeting booked for 4th April
* LHCb: Low activity, mainly monte carlo simulation and user jobs. For SAM/Nagios in order to probe the ARC CEs at several UK sites, the probes are submitted now via a WMS instance from RAL-LCG2. The WMS instance was confirmed to be kept in production also for this purpose at least until 2015.
+
 
* Tracking tools: no report.
+
'''Monday 11th February 2019'''
* FTS3: no report.
+
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
* glexec: no report.
+
** End of CREAM support Dec 2020.
* Machine/job features: Developer is leaving OSG.
+
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
* MW readiness: A new version of the WLCG Package Reporter has been released. A new BDII update 9 and Cream-ce 1.6.3 for CMS verification being deployed.
+
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).  
* Multicore: no report.
+
** Experiment updates (see ATLAS discussion on DOMA)
* SHA-2: Progress with new VOMS servers - compliance with the WLCG infrastructure being tested, ALICE results show CREAM/ARGUS config issues at some sites. Broadcast next week with hard deadline for 15th September. Sites that fail the SAM preprod tests by the end of Aug will be ticketed .
+
** WG updates (few).
* WMS decommissioning: Condor validation - ATLAS and CMS ready. Deployment to production is planned on Wed 1st of October 2014.
+
 
* IPv6: Ewan ran tests on pure IPv6 EMI-3 UI. Mixed results.
+
 
* Squid monitoring/HTTP proxy: Reactivated Squid Monitoring TF to track its [https://twiki.cern.ch/twiki/bin/view/LCG/SquidMonitoringTaskForce#Task_Overview task list].
+
 
* Network and transfer metrics: [https://twiki.cern.ch/twiki/bin/view/LCG/NetworkTransferMetrics Tasks/membership updated]. perfSONAR Toolkit 3.4rc2 became available for testing, version 3.4 is a major milestone for the WG as it enables access via REST API and introduces several important performance improvements, therefore deployment campaign will follow once we get a stable release.
+
  
'''Tuesday 12th August'''
 
* The next meeting is on 21st August.
 
  
  
Line 123: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 12th August'''
+
 
* We have resumed draining disk servers after the Castor 2.1.14 upgrade. There were some problems with this that are now resolved.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* We have announced that we will shutdown both the FTS2 service and the  software server used by the small VOs on the 2nd September.
+
<!-- *********************************************************** ----->
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 140: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 1st September'''
 
* FAX sites to update the C++ N2N rpms .
 
  
'''Monday 11th August'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Pool nodes at RHUL have received test errors.
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
  
'''Tuesday 5th August'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* The list of work Jens reviewed last Wednesday
+
* Rucio reporting
** WebFTS testing
+
 
** Updating storage documentation (the wiki) and testing it
+
'''Wed 16 Oct'''
** Upgrading DPM 1.8.7s?
+
* CEPH workshop at CERN report
** GLUE 2.0 for storage revisited?
+
 
** IPv6
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
** WebDAV
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 161: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 171: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th August'''
+
'''Tuesday 6th February'''
* Sheffield has stopped publishing.
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 12th August'''
 
* Accounting looks behind for UCL, Sheffield and Sussex.
 
  
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 +
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 185: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 193: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
 
  
'''Tuesday 26th August'''
+
'''General note'''
* KeyDocs now working again. Several documents assigned to Jeremy for re-allocation. Owners need discussion.
+
  
'''Tuesday 12th August'''
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
* The keydocs php scripts are not yet working, so we cannot restart our review process....
+
  
 
|}
 
|}
Line 207: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 213: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 14th July'''
 
* Last meeting yesterday.
 
  
* Agenda: https://wiki.egi.eu/wiki/Agenda-14-07-2014
+
''' 14 May 2019 '''
* Minutes:
+
* Meeting for May cancelled. Next meeting is on 10th June.
  
* URT: see agenda for details
+
''' Monday 11th March '''
* SR: In verification: gfal2 v. 2.5.5; active: globus-info-provider-service v. 0.2.1 cream v. 1.16.3; ready to be released: storm v. 1.11.4 lb v. 11.1 wms v. 3.6.5 dcache v. 2.6.28
+
* DMSU report: CREAM CLI/GridSite SegFaults at Long-Lived Proxies solved
+
* Migration of Central SAM services: Note to make sure that if being reinstalled that patches are applied
+
* EMI-2/APEL-2 - Looks like UCL is still publishing with APEL-2 publisher
+
* Hoped that gr.net issues resolved on Monday. Summary of discussion to be in minutes.
+
* Next meeting placeholder 28th July, but may not happen (OMD depending)
+
* Please fill out this UMD customer satisfaction survey in the next couple of weeks if you had a moment: https://www.surveymonkey.com/s/MQ6G8BZ
+
  
'''Tuesday 1st July'''
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
* Today's ops meeting cancelled - partly due to forthcoming 4th EGI annual review.
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
* EMI-2 decommissioning: The situation is followed by COD ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=106354 GGUS 106354]). "Please remember that we passed the decommissioning deadline and after today - Sites still deploying unsupported service end-points risk suspension, unless documented technical reasons prevent a Site Admin from updating these end-points (source [https://wiki.egi.eu/wiki/PROC16 PROC16]).
+
* DPM Legacy mode is going to end in June 2019
* There is STILL use of UMD2/EMI2 APEL clients to send accounting data. As of today there are 20 sites ([http://goc-accounting.grid-support.ac.uk/consumer/ see latest list]) still using UMD2/EMI2 APEL clients
+
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
  
* Updates requested for the [https://www.egi.eu/earlyAdopters/table early adopters table].  
+
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
  
Line 251: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 18th August'''
+
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 
  
* Consolidation meeting last Friday, Messaging and SAM 3 UI: https://indico.cern.ch/event/334354/
+
'''Tuesday 16th June'''
** Looking for experiment input on SAM3 UI with a view to bringing it into production ~ end of October
+
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
  
* Kick-off meeting discussing cvmfs monitoring in squid monitoring TF arranged for 28th August.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 271: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th August'''
+
'''Tuesday 5th February'''
* RAL : Nagios jobs staying in queue for long time - to be investigated.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Sussex : Matt needs help probably from some SGE experts.
+
* Few availability tickets on hold
* UCL : No acknowledgement from the site (ticket escalated to second level).
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
* 100IT : There is an alarm from EGI federated cloud - this needs discussion.
+
* Durham : Availability alarms - require constant closing with some comments. Ticket with devs is open.
+
  
'''Tuesday 12th August'''
+
'''Tuesday 14th August'''
* Last week was quiet.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* Still one or to responses needed for next rota allocations.
+
  
  
Line 294: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th August'''
+
'''Monday 20th November'''
* EMI3 WN tarball update needed soon ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=107869 GGUS 107869])
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Monday 28th July'''
 
* [https://operations-portal.egi.eu/broadcast/archive/id/1180 UMD v.3.8.0] was released on 24th July.
 
  
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 317: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Monday 11th August'''
+
'''Tuesday 11th June
* Topics as mentioned during the last GridPP technical meeting.
+
 
+
* There is an issue at the moment in the evaluation of vulnerabilities causing everything rated 'High' by Pakiti to display as 'Critical' in the Dashboard.
+
 
+
  
* The EGI [https://operations-portal.egi.eu/csiDashboard security dashboard].
+
* NTR
  
 
|}
 
|}
Line 341: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 349: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 12th August'''
+
'''Monday 5th March'''
* A reminder to update site status information in the [https://www.gridpp.ac.uk/wiki/IPv6_site_status IPv6 pages].
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
* There is a new version (v3.4rc2) of perfSONAR being tested at QMUL [http://perfsonar03.esc.qmul.ac.uk/toolkit/gui/services/]. Details here [http://psps.perfsonar.net/toolkit/releasenotes/pspt-3_4rc2.html].  
+
* We will shortly review issues being picked up by perfSONAR and the steps to take when investigating.
+
  
'''Tuesday 22nd July'''
+
'''Monday 10th September'''
* There was a problem with VOMS admin that was noticed last Thursday: VO page requestes resulted in the WEB-INF directory of the jetty app being displayed. A server restart fixed the problem.
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
  
'''Tuesday 17th June'''
+
'''Monday 2nd July'''
* The GridPP VOMS server was updated on 11/06/2014 - no issues reported.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
  
Line 373: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 1st September 2014, 15.00 BST'''<br />
 
29 Open UK tickets this week.
 
  
'''A Sno+ query'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107880 107880](26/8)<br />
+
Matt M asks the Tier 1 if they can help with one of their user problems, where the SUSE bound user is trying to use srmcp to access files at the Tier 1 and failing. The errors look to me like the client is connecting to a port whilst setting up the transfer. My advice would be to try an uberftp-like client, or muck around with using passive/active settings. Of course there could also be something Tier 1 specific getting in the way. Any wisdom appreciated. In Progress (27/8)
+
  
'''Another Sno+ Issue'''<br />
 
Oxford: [https://ggus.eu/index.php?mode=ticket_info&ticket_id=107911 107911](27/8)<br />
 
RALPP: [https://ggus.eu/index.php?mode=ticket_info&ticket_id=107910 107910](27/8) - Still just in the "assigned" state.
 
These two tickets concern, as far as I can see, more or less the same problem. Sno+ can't set software tags on ARC CEs, and therefore are running into a spot of bother due to how they're using the tag's functionality (as a blacklisting mechanism). Ewan's been helping out on the Oxford ticket, but I don't think the RALPP one has been noticed yet.
 
 
'''QMUL'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107799 107799](21/8)<br />
 
A friendly poke to remind Dan about this Sno+ ticket (moving VO_SW_DIR variable to point to the cvmfs area). In Progress (22/8)
 
 
'''ECDF'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107884 107884](26/8)<br />
 
Atlas ticketed Edinburgh over webdav instabilities at the site - although it's mentioned in the ticket that they're seeing problems across the UK. Wahid mentions that this is due to the problems with webdav in DPM 1.8.7 and not all their pools are upgraded. Naught wrong with the ticket handling, but this link to so proto-webdav monitoring is interesting: http://sblunier.web.cern.ch/sblunier/webdavGridStatus/ In progress (probably will be closed soon) (28/8)
 
 
'''EFDA-JET'''<br />
 
[https://ggus.eu/index.php?mode=ticket_info&ticket_id=107551 107551](7/8)<br />
 
The JET CSIRT e-mail check ticket. After some confusion over the GGUS e-mailing (which I believe was broken for a while when these tickets went out) this has stalled. In progress (18/8)
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 409: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 14th July'''
+
'''Monday 20th November'''
 
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.  
Winnie reported on Saturday 12th July that most of the UK sites are failing nagios test. Problem started with unscheduled power cut at a Greek site hosting EGI Message broker (mq.afroditi.hellasgrid.gr) around 2PM on 11th July. Message broker was put in downtime but topbdii's continued to publish it for quite long time.  Stephen Burke mentioned in TB support thread that now default caching time is 4 days. When I checked on Monday morning only Manchester was still publishing mq.afroditi and it went away after Alessandra manually restarted top bdii. It seams that Imperial is configured with much shorter cache time.
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
Only Oxford and Imperial was almost not affected and the reason may be that Oxford WN's have Imperial top bdii as first option in BDII_LIST. Other NGI's have reported same problem and this outage is likely to be considered when calculating availability/reliability. All Nagios tests came back to normal now.  
+
 
+
Emir reported this on tools-admin mailing list
+
"We were planning to raise this issue at the next Operations meeting. In these extreme cases 24h cache rule in Top BDII has to be somehow circumvented."     
+
  
'''Tuesday 1st July'''
+
'''Tuesday 18th July'''
* There was a monitoring problem on 26th June. All ARC CE's were using storage-monit.phyics.ox.ac.uk for replicating files as part of the nagios testing. storage-monit was updated but not re-yaimed until later.  Storage-monit was broken for the morning leading to all ARC SRM tests failing.
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
'''Tuesday 24th June'''
 
* An update from Janusz on DIRAC:
 
* We had a stupid bug in Dirac which affected the gridpp VO and storage. Now it is fixed and I was able to successfully upload a test file to Liverpool and register the file with the DFC
 
* The async FTS is still under study, there some issues with this.
 
*I have a link to software to sync user database from a VOMS server, haven’t looked into this in detail yet.
 
  
  
Line 434: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 440: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 11th August'''
 
* Steve J sent an email to hyperk on 7th regarding "software directory for Hyperk (CVMFS)" and entries in the VO ID card.
 
  
"Monday 14th July 2014"
+
'''Monday 20th November'''
* HyperK.org will initially use remote storage (irods at QMUL) - so CPU resources would be appreciated.
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 
+
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
"Monday 30 June 2104"
+
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
* HyperK.org request for support from other sites
+
** 2TB storage requested.
+
** CVMFS required
+
 
+
* Cernatschool.org
+
** WebDAV access to storage -world read works at QMUL.
+
** ideally will configure federated access with DFC as LFC allows.
+
 
+
 
+
'''Monday 16 June 2014'''
+
* CVMFS
+
** Snoplus almost ready to move to CVMFS - waiting on two sites. Will use symlinks in existing software
+
 
+
* VOMS server: Snoplus has problems with some of the VOMS servers - see ggus 106243 - may be related to update.  
+
 
+
 
+
'''Tuesday 15th April'''
+
* Is there interest in an FTS3 web front end? ([http://indico.cern.ch/event/272620/contribution/11/material/slides/1.pdf more details])
+
  
  
Line 483: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 20th May'''
+
'''Date'''
* Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.
+
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 544: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 27th August 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-08-27 Operations report]
+
* Successful test of modified disk server draining procedure.
+
* Five disk servers added to cache for AtlasTape.
+
* The termination of the FTS2 service has been announced for the 2nd September.
+
* The software server used by the smaller VOs will be turned off - also on 2nd September.
+
* We are planning to turn off access to the cream CEs (possibly keeping them open for Alice) - although no date yet decided for this.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 617: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A