Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,564 intermediate revisions by 43 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 30th June 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 1st July'''  
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* HyperK can now make use of additional resources and a general request for enablement was circulated. The request includes 1-2TB disk which triggered discussion about default space tokens.
+
** https://indico.cern.ch/event/776832/
* Michel J confirms that the 9th September pre-GDB will be on clouds.
+
* DIRAC downtime this week due to the move to Slough - good luck!
* There was an [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2190 EGI OMB meeting last Thursday]. Main points:
+
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
* ''EGI review – 2nd & 3rd July''
 
  
* ''GFAL/lcg_util not supported after October''
+
'''Tuesday 11th June'''
  
* ''OLAs for core services now in wiki''
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
* ''Main NGI updates question: what proportion of resources will be cloud vs grid accessible?
 
''
 
* ''17 sites provided responses via eGrant pools. 4 now active (1 from UK = Brunel).''
 
  
* ''There was a review of currently run SAM tests (see talk) and [https://indico.egi.eu/indico/getFile.py/access?contribId=6&resId=1&materialId=slides&confId=2190 progress re-consolidating the monitoring infrastructure].''
 
  
* A reminder that there is a [https://indico.cern.ch/event/326927/ weekly Tier-1 liaison meeting on Wednesday's from 13:30.].
 
 
* There was a UK CA notifcation last week. They plan to close the legacy OpenCA interface in mid-July. Users should [http://www.ngs.ac.uk/ukca/apply now use] (and in fact are already using) the CA portal or
 
CertWizard.
 
 
* We were going to revisit this week the issue of high load on the squid-frontier servers at Liverpool and Glasgow.
 
 
* The agenda for the [https://indico.cern.ch/event/305362/other-view?view=standard WLCG workshop] taking place next week is now final.
 
 
 
 
'''Monday 23rd June'''
 
* [http://www.gridpp.ac.uk/gridpp33/index.html GridPP33 registration] (20th-22nd August) is now open - Pete G notices some advance fares from London that save 1/3 on the typical price.
 
* Notes from [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGDailyMeetingsWeek140616#Thursday Thursday's WLCG twice weekly operations meeting].
 
* EGI availability/reliability figures for May have been uploaded to the [https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics EGI reports page].
 
* A reminder most will have seen: SRN Janet community will be disconnected on August 31st 2014.
 
* Please help with the [https://www.surveymonkey.com/s/MQ6G8BZ EGI survey on UMD usage].
 
 
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 71: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 78: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 1st July'''
+
'''Tuesday 11th June'''
* There will be a [https://indico.cern.ch/event/327276/ multi-core TF meeting this afternoon] at 13:30 UK time.
+
 
* A reminder that the [http://indico.cern.ch/event/320011/ next MW readiness WG meeting] is this Wednesday (2nd July) at 15:00 UK time.
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
  
'''Monday 23rd June'''
 
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140619 Minutes] from [https://indico.cern.ch/event/323689/ last Thursday's] meeting. Highlights....
 
* A [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineVersions#Issues_Affecting_the_WLCG_Infras page] is available listing current known middleware issues affecting WLCG.
 
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineVersions Baselines]: Storm 1.11.4 released in EMI containing several bug fixes. Baseline update with UMD release.
 
* 3 issues affected some sites after the latest EMI update of Cream and LB. The problems are under investigations by the PTs.
 
* CVMFS: Starting from July, sites not compliant with the 2.1.19 version will be notified with a GGUS ticket (noted that upgrade just requires an update of the RPM and a restart CVMFS).
 
* T0: The OPS VO now runs in voms-admin instead of VOMRS, after the migration done on June 17th
 
* Tier-1/Tier-2 feedback: NTR!
 
* ALICE: successful campaign for users to move away from old ROOT versions. T0 job efficiency issues ongoing.
 
* ATLAS: DC14 expected to start in approximately 2 weeks from now.Panda/Jedi is now fully ready for user analysis.
 
* CMS: Started to remove individual release tags from CEs. After the introduction of disk/tape separation at the T1 sites, CMS now must site readiness measures for T1 sites
 
* LHCb: Recommend CVMFS 2.1.19. General request: ensure that downtimes, including unscheduled outages, accurately reflect the specific services which are unavailable.
 
* FTS3: Monitoring the auto-tuning algorithm closely and adjusting various monitoring tools of FTS3.
 
* glexec: 10 sites have yet to enable it. ARGUS instabilities being investigated.
 
* Machine/job features: PBS/torque and LSF implemented. SLURM pending. SGE and HTCondor in progress.
 
* MW readiness: ATLAS and CMS DPM setups in progress. Monitoring prototype being deployed at test sites. 
 
* Multicore: CMS stable flow. Gathering reports for July workshop. ATLAS MC jobs on-hold pending new software release.
 
* SHA-2: New VOMS fix for CERN instances requires sites to update ARGUS, UI, CREAM and WN instances.
 
* WMS decommissioning: Progress with SAM Condor validation. ARC-CE WN tests failing for some CMS sites (incl. Imperial).
 
* IPv6: NTR
 
* HTTP proxy discovery: [https://twiki.cern.ch/twiki/bin/view/LCG/HttpProxyDiscoveryTaskForce#Task_Overview Task overview table] updated.
 
* Network and transfers metrics: [https://twiki.cern.ch/twiki/bin/view/LCG/MeshLeaders Mesh leaders] developed. Kick off in July.
 
* AOB: OSG plan to migrate to HTCondor CEs by October.
 
  
  
Line 124: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 1st July'''
+
 
* LHCb Castor Stager Upgrade was carried out successfully last Thursday. The final update is the Atlas Castor instance stager which is planned for the Atlas - Tue 1st July.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There is a UPS/Generator load test tomorrow morning (Wed 2nd July) and the site has been declared in an At Risk (warning) in the GOC DB from 10 to 11 local time.
+
<!-- *********************************************************** ----->
* We are looking at how to end the FTS2 service, now FTS3 is becoming widely used.
+
* The software server used by the small VOs will be withdrawn from service. Its use as a software server is very limited (possibly only SNO+) although a few VOs use it for uploading files to the CVMFS repository.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 143: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 2 July'''
 
* Guidance and policies for "small" VOs: how to get them started with stuff, without preventing them later growing bigger.
 
  
'''Tuesday 1st July'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Spacetokens for smaller VOs ... most want them but what happens post SRM. Chris's [https://www.gridpp.ac.uk/wiki/Storage/SpaceTokens summary on Spacetokens] needs updating and a consensus! Could the SEs implement some reservation system internally? Is there merit in the suggestion to make use of [https://www.gridpp.ac.uk/wiki/Using_Castor_At_RAL RAL genscratch and its Least Used Policy]?
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
  
'''Tuesday 17th June'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Advances with CEPH at RAL will be reported to the Storage Meeting. It is hoped to setup a regular update contribution.
+
* Rucio reporting
  
'''Tuesday 10th June'''
+
'''Wed 16 Oct'''
* The DPM Collaboration [https://svnweb.cern.ch/trac/lcgdm/wiki/DPMCollaborationAgreement agreement] has been updated.
+
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 161: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 171: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 1st July'''
+
'''Tuesday 6th February'''
* There are no SL6 [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HS06 entries] in our wiki for UCL and EFDA.
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
* Are there any observations from the latest GridPP [http://pprc.qmul.ac.uk/~lloyd/gridpp/metrics.html metrics tables]? (Does anything need addressing or correcting?).
+
* APEL is not up-to-date for: RHUL; Manchester and Durham.
+
  
  
'''Tuesday 24th June'''
+
'''Tuesday 30th January'''
* APEL not up-to-date for: RHUL; Manchester, Durham and Sussex.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
+
'''Tuesday 24th Oct'''
* Check publishing via: http://gstat2.grid.sinica.edu.tw/gstat/summary/Country/UK/  
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 190: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 198: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
  
'''Monday 16th June'''
 
* A review is starting of old and obsolete pages within the GridPP website - there are many! Please review sections that you have created and update them if necessary.
 
  
'''Tuesday 6th April'''
+
'''General note'''
* KeyDocs are going to be reviewed (in next 4 weeks) as the system is not working (or not adding anything) in some areas.
+
  
 +
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 213: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 219: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 1st July'''
 
* Today's ops meeting cancelled - partly due to forthcoming 4th EGI annual review.
 
* EMI-2 decommissioning: The situation is followed by COD ([https://ggus.eu/index.php?mode=ticket_info&ticket_id=106354 GGUS 106354]). "Please remember that we passed the decommissioning deadline and after today - Sites still deploying unsupported service end-points risk suspension, unless documented technical reasons prevent a Site Admin from updating these end-points (source [https://wiki.egi.eu/wiki/PROC16 PROC16]).
 
* There is STILL use of UMD2/EMI2 APEL clients to send accounting data. As of today there are 20 sites ([http://goc-accounting.grid-support.ac.uk/consumer/ see latest list]) still using UMD2/EMI2 APEL clients
 
  
 +
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
* Updates requested for the [https://www.egi.eu/earlyAdopters/table early adopters table].  
+
''' Monday 11th March '''
 +
 
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Tuesday 10th June'''
 
* Next meeting June 16th.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 244: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 24th June'''
+
'''Tuesday 4th July'''
* Meeting last Friday: https://indico.cern.ch/event/324687/
+
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 
 +
'''Monday 13th February'''
 +
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 
 +
 
 +
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 260: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 1st July'''
+
'''Tuesday 5th February'''
* Quiet week. Sussex emi2 ticket is still open. UCL also has a open ticket regarding some problem with storage.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Tuesday 24th June'''
+
'''Tuesday 14th August'''
* Very quiet shift. Dashboard downtime on Tuesday seemed to go ok.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
  
Line 278: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 18th March'''
 
* The EMI-2 decommissioning task has started.
 
* The [http://indico.cern.ch/event/MW-Readiness_3 next WLCG middleware readiness WG meeting] takes place this afternoon at 13:30 UK time.
 
  
'''Tuesday 11th February'''
 
* 31st May has been set as the deadline for EMI-2 decommissioning. There may be an issue for dCache (related to 3rd party/enstore component).
 
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 302: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 1st July'''
+
'''Tuesday 11th June
* There was a very useful security challenge debrief last week. Thanks to Heiko.
+
* There may be a site contacts challenge in the coming months. Please could every site review their site security contact details and ensure that the GOCDB entry is up-to-date and working.
+
* EGI indicates that site ARGUS instances can now be hooked up with the regional instances.
+
* There was one EGI amber final report last week.
+
* Next team meeting 16th July.
+
 
+
'''Monday 23rd June'''
+
* CVE-2014-3153 - but no public exploit.
+
** This kernel vulnerability has been patched in errata released last week.
+
* PerfSonar/Cacti updates.
+
* New IGTF CA release 1.58 - the EGI release is due on 30th June.
+
  
 +
* NTR
  
 
|}
 
|}
Line 332: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 340: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 17th June'''
+
'''Monday 5th March'''
* The GridPP VOMS server was updated on 11/06/2014 - no issues reported.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
  
Line 356: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 30th June 2014, 14.30 BST'''<br />
 
Full Review this week, a little earlier then usual.
 
28 Open UK Tickets
 
  
'''SUSSEX'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105937 (2/6)<br />
+
Low availability ticket, due to EMI3 upgrade woes. Most issues have been solved, but Apel publishing problems have been rolled into the ticket. Matt RB seems digging his way out in the right direction though. In progress (30/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105618 (21/5)<br />
+
Sno+ CVMFS unavailable at Sussex. On Hold whilst the other issues are dealt with. On Hold (23/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106492 (25/6)<br />
+
A request from atlas to resize Space Tokens. Matt also asked if atlashostdisk and atlasgroupdisk could be deleted - Brian gave the nod yes. Probably all done with here? In Progress (27/6)
+
 
+
'''BRISTOL'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106438 (23/6)<br />
+
CMS having some trouble running jobs at Bristol (especially having lots of "held" jobs- but reading the ticket this means held on the cms queue, not in the local batch system). Winnie notes that for at least one of their queues they have over a hundred waiting cms jobs on a 72 slot shared queue. But it looks like the problem may have evapourated. At last word the cms submitter said he'd close the ticket if things stayed clear - but this was last Thursday. In Progress (26/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106325 (1/6)<br />
+
A different CMS ticket, about pilot jobs losing connection to their submission hosts. After another round of nomenclature confusion, it was found that the problem seems to be between Bristol and hosts cmssrv119.fnal.gov and vocms97.cern.ch. Lukasz suggests using perfsonar to investigate. Also the dates on this ticket are well off (creation date 1/6, but first update 18/6) In progress (27/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106554 (1/6)<br />
+
Again the dates on this ticket are very off (creation date was the 1/6, but the first update is the 29/6)- so the issue may have disappeared. This is another cms ticket about a heavy transfer backlog between Bristol and FNAL - if it's still a problem possibly linked to the above issue. Waiting on Lukasz to get back. In progress (30/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106058 (9/6)<br />
+
CMS xrootd problems at Bristol. Also waiting on Lukasz's return (which I think has happened). On Hold (16/6)
+
 
+
'''EDINBURGH'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=95303 (1/7/2013)<br />
+
glexec ticket. No news, the early review meant I couldn't sooth my shame on this matter. On Hold (27/1)
+
 
+
'''MANCHESTER'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105922 (2/6)<br />
+
Manchester publishing to EMI2 APEL. It's being worked on, but one piece is missing - on hold until this detail is sorted. On Hold (25/6)
+
 
+
'''LANCASTER'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106406 (23/6)<br />
+
LHCB having trouble on Lancaster's older cluster. First issue was cvmfs timeouts - linked to older WNs being overloaded. Second issue is cream CE losing track of jobs in the batch system. Being worked on, but like a case of old age-tuning can only fix so much. In progress (26/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=95299 (1/7/2013)<br />
+
glexec ticket. As with ECDF. On Hold (4/4)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=100566 (27/1)<br />
+
Persistant Poor Perfsonar Performance Problems Plaguing Plymouth-born Postdoc... nope, that's as many Ps as I can get (and I'm not sure I still count as a Postdoc). A reinstall of the box hasn't helped. If anyone has a normal 10G iperf endpoint I could test against that would be great. Other then that waiting on some networking rejigging at Lancaster to shake things up and give the network engineers another chance to go over things. On Hold (23/6)
+
 
+
'''UCL'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106425 (23/6)<br />
+
UCL failing ops tests that are using their SE. Ben noticed a problem with one of their pools, but fixing it didn't seem to solve the problem. Gareth has asked for an update pending being forced to escalate. In progress (30/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=95298 (1/7/2013)<br />
+
UCL's glexec ticket. Last word was this would be the first job of a newer staff member, who was due to start within a few months (so about nowish?). On Hold (16/4)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=101285 (16/2)<br />
+
UCL's perfsonar not working after suffering a hardware failure. Bits have been replaced and the machine was due a reinstall a while ago. On Hold (28/4)
+
 
+
'''RHUL'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106437 (23/6)<br />
+
Atlas have inaccessible file(s) at RHUL due to a pool node in distress. Govind hopes to install a new motherboard tomorrow and will update after. Good luck with the repair! In progress (30/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105943 (2/6)<br />
+
Biomed asking for gsiftp access on the RHUL headnode so that they can read the namespace with gsiftp. Govind tried to enable this but biomed report that it didn't work. Not much word since - but I expect Govind's been busy. In progress (23/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105923 (2/6)<br />
+
RHUL still publishing to EMI2 APEL too. On Govind's to do list, but low priority. No word for a while. On Hold (17/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106495 (25/6)<br />
+
Inconsistent storage capacity publishing at RHUL. Govind reckons (quite rightly) that this is due to having a pool node out of commission and will look at it once that's fixed. In Progress (26/5)
+
 
+
'''QMUL'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105771 (27/5)<br />
+
Biomed having problems accessing files via https at QM. Chris explains that they've had to switch off https access and are waiting for 105361 to be fixed and storm to be updated. On Hold (12/6)
+
 
+
'''IMPERIAL'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106369 (20/6)<br />
+
Biomed ticket, similar to 105943 for RHUL, but with some added history (106369). Biomed are being a little insistent, and asked a question that I don't fully understand about path publishing. In Progress (30/6)
+
 
+
'''IMPERIAL CLOUD'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106347 (19/6)<br />
+
The new cloud site needed to tune things as VMs weren't using proxies but hitting the cern statum 0 directly. Adam is working on how to get around this - Ewan has mentioned that Oxford have shoal running and have seen accesses from the Imperial Cloud machines - so the problem may have a no work required workaround (the best kind!). In Progress (29/6)
+
 
+
'''EFDA-JET'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=97485 (21/9/2013)<br />
+
LHCB jobs having openssl like problems at Jet. No progress on this for a while but none was expected - the problem survived the move to EMI3, and the jet admins are stuck. On Hold (12/5)
+
 
+
'''TIER 1'''<br />
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105405 (14/5)<br />
+
Vidyo router firewall ticket. I suspect this ticket can be closed, as other issues are being followed up elsewhere- or it at least needs an update/being ste on hold. In Progress (10/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=105571 (20/5)<br />
+
Inconsistent BDII and SRM storage numbers for lhcb. This has been worked on, and seems almost fixed. There's some debate over the tape figures, Brian points out that the 'online' values are correct. In progress (30/6)
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106324 (18/6)<br />
+
CMS pilots losing connection to their submission hosts at RAL. It looks like this has been going on silently for a while, the RAL team are taking it up with their networking chaps to see if it's a firewall issue.
+
 
+
https://ggus.eu/index.php?mode=ticket_info&ticket_id=106480 (25/6)<br />
+
The information publishing police have pointed out that the RAL Castor isn't publishing a sane version. Brian suspects an rogue ":" causing the problems.  
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 466: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 1st July'''
+
'''Monday 20th November'''
* There was a monitoring problem on 26th June. All ARC CE's were using storage-monit.phyics.ox.ac.uk for replicating files as part of the nagios testing. storage-monit was updated but not re-yaimed until later.  Storage-monit was broken for the morning leading to all ARC SRM tests failing.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 +
 
 +
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
  
'''Tuesday 24th June'''
 
* An update from Janusz on DIRAC:
 
* We had a stupid bug in Dirac which affected the gridpp VO and storage. Now it is fixed and I was able to successfully upload a test file to Liverpool and register the file with the DFC
 
* The async FTS is still under study, there some issues with this.
 
*I have a link to software to sync user database from a VOMS server, haven’t looked into this in detail yet.
 
  
  
Line 483: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 490: Line 540:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
"Monday 30 June 2104"
+
'''Monday 20th November'''
* HyperK.org request for support from other sites
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
** 2TB storage requested.
+
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
** CVMFS required
+
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 
+
* Cernatschool.org
+
** WebDAV access to storage -world read works at QMUL.
+
** ideally will configure federated access with DFC as LFC allows.
+
 
+
 
+
'''Monday 16 June 2014'''
+
* CVMFS
+
** Snoplus almost ready to move to CVMFS - waiting on two sites. Will use symlinks in existing software
+
 
+
* VOMS server: Snoplus has problems with some of the VOMS servers - see ggus 106243 - may be related to update.  
+
 
+
 
+
'''Tuesday 15th April'''
+
* Is there interest in an FTS3 web front end? ([http://indico.cern.ch/event/272620/contribution/11/material/slides/1.pdf more details])
+
  
  
Line 527: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 20th May'''
+
'''Date'''
* Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.
+
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 588: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 25th June 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-06-25 Operations report]
+
* Castor GEN Stager 2.1.14-13 updated yesterday (24th June). Some problems with xroot for ALICE not resolved until following morning. Remaining stager dates as follows (LHCb - Thu 26th June; Atlas - Tue 8th July.)
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 657: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A