Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,626 intermediate revisions by 44 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 16th June 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
 +
 +
 +
'''Tuesday 11th June'''
 +
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 
<!-- ***********************Start General text*********************** ----->'''
 
<!-- ***********************Start General text*********************** ----->'''
'''Monday 16th June'''
+
'''Tuesday 4th June 2019'''
* There was a [http://indico.cern.ch/event/272622/ GDB last week] and [https://indico.cern.ch/event/313194/ pre-GDB on IPv6]. Of particular interest is [https://cds.cern.ch/record/1706334/files/TripReport.pdf Helge's trip report from HEPIX]. The official [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20140611 GDB summary notes] are now available and the [https://twiki.cern.ch/twiki/bin/view/LCG/GDBActionInProgress actions] updated.
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* GGUS ran into problems over the weekend and this affected ticket processing. The system did not recover from a DB connection problem and required a server restart.
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* There is a plan for the upgrade of the CVMFS installation servers [https://indico.cern.ch/event/321389/contribution/5/material/1/0.txt hosted at CERN] from v 2.0 to v 2.1, starting from August the 5th. Before the servers upgrade (by the end of July) there is a request to make sure that the CVMFS clients deployed on the WLCG infrastructure are upgraded to the [http://cernvm.cern.ch/portal/filesystem/cvmfs-2.1.19 2.1.19 version], released on 28th May.
+
* iris.ac.uk VO - Andrew explained this.
* Well done to Brunel for being the first UK site to offer EGI resources via the eGrant system!
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Monday 9th June'''
 
* Note that the EMI-2 deadline set by EGI has now passed (31st May) and all remaining EMI-2 services/endpoints must be put into downtime.
 
* The UK CA moved to issuing SHA-2 certificates on 28th May.
 
* Reminder that the WLCG workshop registration should have been completed by now (and the accompanying GridPP travel request).
 
* There is a [http://indico.cern.ch/event/272622/ GDB] at CERN this week with [https://indico.cern.ch/event/313194/ pre-GDB on IPv6]. The first few overview talks (setting up and comparing IPv4 and IPv6) are good background and it is recommended to review them. You can test your connectivity via [http://ipv6-test.com ipv6-test.com].
 
* The agenda from the HEPSYSMAN meeting at RAL last week is available [https://indico.cern.ch/event/318354/ here].
 
* The GridPP DIRAC service can be accessed via [https://dirac.grid.hep.ph.ic.ac.uk:8443/DIRAC/ this link].
 
* ATLAS datasets on LocalGroupDisk more than 2 years old are being deleted starting from June 1st 2014.
 
* EGI is now informing sites on a biweekly basis of VOs seeking additional resources. A process has been created for sites to register their resources into a ‘pool’ via the [https://e-grant.egi.eu eGrant system]. [https://wiki.egi.eu/wiki/Resource_Allocation_Process More information] is available.
 
* The [http://sam-reports.web.cern.ch/sam-reports/2014/201405/wlcg/ May WLCG availability/reliability figures] have been released. A reminder, if you want to request a re-computation you need to submit a GGUS ticket. Specific follow-ups have been requested in an email to TB-SUPPORT on 2nd June.
 
  
'''Monday 27th May'''
 
* There is a DIRAC workshop at CERN this week. If you, or VOs you work with, have any thoughts on specific requirements for future DIRAC development please let Janusz/Dan or Jeremy know.
 
* An EGI [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2189 Operations Management Board] takes place on Tuesday morning. The topics: CSIRT update; resource allocations; gfal2 replacing lcg_utils; central SAM update; EMI-2 decommissioning and update on GPGPUs.
 
* The latest ops portal update integrated the possibility to register and update VO ID cards according to a [https://wiki.egi.eu/wiki/VT_Scientific_Discipline_Classification new discipline classification]. VO managers are being encouraged to check/update their VO ID card via [https://operations-portal.egi.eu/vo this link].
 
* There was a [https://indico.cern.ch/event/321409/ GridPP technical meeting last Friday].
 
* The final [https://espace2013.cern.ch/WLCG-document-repository/ReliabilityAvailability/2014/april-14 WLCG Tier-2 reliability & availability reports for Arpil] are now uploaded.
 
* There has been some TB-Support discussion on GitHub vs BitBucket. Any conclusions?
 
* A reminder that David C has put together a [http://gridpp-monitoring.blogspot.co.uk  blog on monitoring].
 
  
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 63: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 70: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Monday 16th June'''
+
'''Tuesday 11th June'''
* The next WLCG ops meeting is on [https://indico.cern.ch/event/323689/ Thursday 19th June]. The meeting structure is changing to have a dedicated section for T1 and T2s to comment, respond or raise new concerns.
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
 +
 
  
'''Tuesday 10th June'''
 
* There was a WLCG ops coordination meeting on [https://indico.cern.ch/event/321389/ Thursday 5th June].
 
* Middleware: CVMFS updated; FTS3 added; fix for DPM 1.8.8
 
* CERN: Grid submissions to the remaining SLC5 resources stop on the 19th of June. LFC decommissioning for Atlas: the daemons have been stopped, and the data is frozen.
 
* DM: Update to DPM's gridftp server released, to fix issues encountered with FTS2 transfers.
 
* All sites need to upgrade their CVMFS client to version 2.1.19 by August 5th ahead of CERN repository migration to 2.1.X.
 
* ALICE: KIT seeing high network load due to continued use of old ROOT versions by users
 
* ATLAS: MonteCarlo production and analysis: stable load in the past week
 
* CMS: will now ramp up scale of Tier-0 tests on AI and HLT clouds. ARGUS problem - affects glexec. DPM fix for FTS2 issue.
 
* LHCb: CVMFS switching over to new stratum infrastructure.
 
* Tracking: Next GGUS release 19th July - The automatic creation of tickets through mail will be stopped.
 
* FTS3: Discussion on new feature request: multi-destination transfer with automated rerouting.
 
* glexec: Down to 10 open tickets. See the [https://twiki.cern.ch/twiki/bin/view/LCG/GlexecDeploymentTracking tracking page].
 
* Machine/job features: SGE implementation now at Imperial.
 
* M/w readiness: See the [https://twiki.cern.ch/twiki/bin/view/LCG/MiddlewareReadiness#Tasks_overview task overview].
 
* Multicore: Nothing to report (NTR).
 
* SHA-2: CERN VOMS - EMI fix now available. Quick check with RFC proxies failed for ATLAS.
 
* WMS: NTR
 
* IPv6: NTR
 
* HTTP proxy discovery: NTR
 
* Network and transfer metrics: Planning to organize a kick-off meeting in July - membership being agreed (so get involved now).
 
  
  
Line 111: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 10th June'''
+
 
* Castor and batch services currently down for Castor Namserver Upgrade (to version 2.1.14). If all goes well plan to upgrade stagers on: CMS- Tue 17th June; LHCb - Thu 19th June; GEN - Tue 24th June; Atlas - Thu 26th June.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There was a short break in network connectivity (around 10 minutes) this morning while core site switches were upgraded.
+
<!-- *********************************************************** ----->
* We are looking at how to end the FTS2 service, now FTS3 is becoming widely used.
+
* The software server used by the small VOs will be withdrawn from service.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 130: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 17th June'''
 
* Advances with CEPH at RAL will be reported to the Storage Meeting. It is hoped to setup a regular update contribution.
 
  
'''Tuesday 10th June'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* The DPM Collaboration [https://svnweb.cern.ch/trac/lcgdm/wiki/DPMCollaborationAgreement agreement] has been updated.
+
* DOME upgrade problems at Edinburgh
 +
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''Wed 28 May 2014'''
 
* FTS capabilities - with and without Web interface - interest in more tests
 
* Impact of deprecation of lcg-utils - particularly for non-LHC VOs that use LFC.  Conversely, started playing with GFAL2 (Sam).
 
* Interest in DIRAC tutorial either at hepsysman or next GridPP.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 146: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 156: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 10th June'''
 
* APEL not up-to-date for: Brunel, Sheffield, QMUL, Durham and Sussex? EMI-2 service downtime related in some cases?
 
  
'''Tuesday 20th May'''
+
'''Tuesday 30th January'''
* Sites with APEL '[http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=3&endYear=2014&endMonth=5&yRange=SUBREGION&xRange=VO&voGroup=top10&chart=GRBAR&scale=LIN&localJobs=onlygridjobs delays]': IC, Liverpool, Sheffield, Durham, ECDF and Glasgow.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
'''Tuesday 13th May'''
+
'''Tuesday 24th Oct'''
* Will review GridPP metrics soon. Trying to get table up-to-date first.
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
* No HEPSPEC06 wiki updates showing SL6 results for UCL or RALPP.
+
* ATLAS HS06 coefficient for Lancaster 13.9?
+
* APEL publishing 'stopped' for Liverpool, ECDF and Glasgow.
+
  
+
 
* Check publishing via: http://gstat2.grid.sinica.edu.tw/gstat/summary/Country/UK/  
+
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 179: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 187: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
  
'''Monday 16th June'''
 
* A review is starting of old and obsolete pages within the GridPP website - there are many! Please review sections that you have created and update them if necessary.
 
  
'''Tuesday 6th April'''
+
'''General note'''
* KeyDocs are going to be reviewed (in next 4 weeks) as the system is not working (or not adding anything) in some areas.
+
  
 +
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
  
 
|}
 
|}
Line 202: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 209: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 10th June'''
+
''' 14 May 2019 '''
* Next meeting June 16th.
+
* Meeting for May cancelled. Next meeting is on 10th June.
 +
 
 +
''' Monday 11th March '''
 +
 
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 226: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 10th June'''
+
'''Tuesday 4th July'''
* Meeting last Friday: https://indico.cern.ch/event/319204/
+
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
** Nagios box migration: https://indico.cern.ch/event/321470/contribution/3/material/slides/1.pdf
+
 
** CVMFS monitoring by ALICE: https://indico.cern.ch/event/321470/contribution/4/material/slides/1.pdf
+
'''Monday 13th February'''
*** Proposal to deploy ALICE monitoring on CVMFS servers. Discussion around this being tried with ALICE sites prior to taking it to other experiments; further work on this towards looking at it at the WLCG Workshop.
+
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 
 +
 
 +
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 245: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 17th June'''
+
'''Tuesday 5th February'''
* Quiet week
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Sussex: The EMI-3 ticket can probably be resolved. There are no outstanding alarms associated with the ticket now.  
+
* Few availability tickets on hold
* QMUL: Availabilities: These should start to climb back after the weekend.
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 
+
  
'''Monday 9th June'''
+
'''Tuesday 14th August'''
* No issues to report.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
  
Line 266: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 18th March'''
 
* The EMI-2 decommissioning task has started.
 
* The [http://indico.cern.ch/event/MW-Readiness_3 next WLCG middleware readiness WG meeting] takes place this afternoon at 13:30 UK time.
 
  
'''Tuesday 11th February'''
 
* 31st May has been set as the deadline for EMI-2 decommissioning. There may be an issue for dCache (related to 3rd party/enstore component).
 
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 290: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 10th June'''
+
'''Tuesday 11th June
* Comments from the workshop last week
+
*
+
 
+
'''Monday 26th May'''
+
* NGI security communications were tested today.
+
  
 +
* NTR
  
 
|}
 
|}
Line 314: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://netmon02.grid.hep.ph.ic.ac.uk:8080/maddash-webui/index.cgi PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 322: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 17th June'''
+
'''Monday 5th March'''
* The GridPP VOMS server was updated on 11/06/2014 - no issues reported.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
  
Line 339: Line 502:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
 +
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 353: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 20th May'''
+
'''Monday 20th November'''
* Central myegi service moved from http://grid-monitoring.cern.ch/myegi  to https://mon.egi.eu/myegi/ . Please visit new portal to check availability/reliability figures
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
* There was an issue with central message broker and some results have been lost because of this. Mail from central sam team
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
''Between May 1st and May 12th, SAM-CENTRAL and the Message Broker Network have experienced a set of chained failures  that  resulted in the loss of a large portion of the metric results that were published by the SAM NGI Instances. The loss of  these messages will result in an unusually high number of UNKNOWNS in the May A/R reports, but the actual A/R numbers  will not be affected as UNKNOWNS are not take into account. No other services have been affected.''
+
 
+
'''Tuesday 18th July'''
'''Tuesday 13th May'''
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
* From last week's discussion DiRAC now supports: NA62, vo.landslides.mossaic.org, t2k.org, snoplus, gridpp, CERN@school and northgrid. NA62 are moving from LFC to DFC and plan to use DiRAC in place of the WMS.
+
 
  
  
Line 369: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 375: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 16 June 2014'''
 
* CVMFS
 
** Snoplus almost ready to move to CVMFS - waiting on two sites. Will use symlinks in existing software
 
 
* VOMS server: Snoplus has problems with some of the VOMS servers - see ggus 106243 - may be related to update.
 
 
  
'''Tuesday 15th April'''
+
'''Monday 20th November'''
* Is there interest in an FTS3 web front end? ([http://indico.cern.ch/event/272620/contribution/11/material/slides/1.pdf more details])
+
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Monday 17 February 2014'''
 
* Proxy renewal
 
** All RAL WMSs now renew proxies with 1024 bits. This looks like the end of this (at last).
 
 
 
'''Tuesday 11 February 2014'''
 
* Proxy renewal
 
** lcgwms06 at RAL has been upgraded and works
 
** Both Imperial's WMSs work
 
** Glasgow's will still need to be upgraded (unless they have been since Friday).
 
  
 
* Impact
 
* Impact
Line 412: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 20th May'''
+
'''Date'''
* Various sites but notably Oxford have ARGUS problems. 100s of requests seen per minute. Performance issues have been noted after initial installation at RAL, QMUL and others.
+
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 473: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 11th June 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-06-11 Operations report]
+
* Castor Nameserver 2.1.14-13 updated successfully yesterday (10th June). Stager dates as follows ( CMS- Tue 17th June; LHCb - Thu 19th June; GEN - Tue 24th June; Atlas - Thu 26th June.)
+
* The rollout of CVMFS Client version 2.1.19 has been completed.
+
* The Tier1 availabilities for May 2014 were very good. (All 100%).
+
* The first SHA-2 host certificate hs been successfully installed on arc-ce02.
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 545: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A