Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(3,766 intermediate revisions by 44 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing 21st April 2014
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Tuesday 22nd April'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* Note that CERN are requesting all users to update their passwords within 2 weeks.
+
** https://indico.cern.ch/event/776832/
* An EGI update on the openSSL vulnerability for users was circulated last week. See the [https://operations-portal.egi.eu/broadcast/archive/id/1127 broadcast for users], or the earlier [https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/OpenSSL-2014-04-08 one for sites and service providers].
+
* DIRAC downtime this week due to the move to Slough - good luck!
* The final WLCG T2 availability/reliability figures for March have been added [https://espace.cern.ch/WLCG-document-repository/ReliabilityAvailability/2014/march-14/ here].
+
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Tuesday 15th April'''
 
* [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20140409 Summary notes] from [https://indico.cern.ch/event/272620/ April's GDB] are available. The [https://twiki.cern.ch/twiki/bin/view/LCG/GDBActionInProgress actions] have also been updated.
 
* A new GOCDB role has been requested for the use case where a user's DN is to be associated with the site, allowing other systems (nagios for example) to read the list of user DNs that are linked to that Site and take subsequent authorisation decisions.
 
* There has been an [https://operations-portal.egi.eu/broadcast/archive/id/1123 advance notification] of an extended GOCDB service OUTAGE starting 07:00 to 14:00 (BST) on 29th April.
 
* A reminder: The WLCG T2 March availability/reliability figures were made available two weeks ago. Please could sites below the 90% targets write with details of issues encountered.[http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_ALICE_Mar2014.pdf ALICE], [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_ATLAS_Mar2014.pdf ATLAS], [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb]. The EGI availability/reliability [https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics figures for March] are available.
 
  
   
+
'''Tuesday 11th June'''
 +
 
 +
* Technical Meeting last week about the New JSON based Information System: https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
 +
 
  
'''Tuesday 8th April'''
 
* The April GDB [https://indico.cern.ch/event/272620 agenda] is now available. Duncan is the T2 rep this month.
 
* A reminder that the next WLCG workshop will be 7th-9th July in Barcelona. If you would like to present at the event please inform Jeremy.
 
* There is a HEPiX IPv6 F2F at CERN this Thursday ([http://indico.cern.ch/event/301804/ agenda]). Duncan and Chris are registered.
 
* The next LHCONE-LHCOPN meeting is on 28th and 29th April. ([https://indico.cern.ch/event/289680/ agenda])
 
* EGI is planning a [https://indico.egi.eu/indico/conferenceDisplay.py?confId=2160 conference on solutions and challenges for big data processing] to take place 24th-26th September.
 
* EGI is developing a cloud-related H2020 project proposal aiming at delivering a new generation intercloud testbed (36 month duration).
 
* A reminder that the old EMI-2 MyProxy server at RAL (lcgrbp01.gridpp.rl.ac.uk) was decommissioned last week.
 
* The WLCG T2 March availability/reliability figures were made available last week. Please could sites below the 90% targets write with details of issues encountered.[http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_ALICE_Mar2014.pdf ALICE], [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_ATLAS_Mar2014.pdf ATLAS], [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_CMS_Mar2014.pdf CMS], and [http://sam-reports.web.cern.ch/sam-reports/2014/201403/wlcg/WLCG_All_Sites_LHCB_Mar2014.pdf LHCb].
 
  
'''Tuesday 1st April'''
 
* The final WLCG Tier-2 availability/reliability [https://espace.cern.ch/WLCG-document-repository/ReliabilityAvailability/2014/february-14/. figures for February] are now available.
 
*  [https://ggus.eu/?mode=release_notes GGUS enabled shibboleth access] for EGI users who have an EGI SSO account.
 
* [https://wiki.egi.eu/wiki/GOCDB/Release4/Development/ipv6support IPv6 entries for sites and services] will be possible in GOCDB from tomorrow.
 
* The UK CA is still on SHA-1... but the GridPP website is now ready! Please report any observed issues.
 
* The April GDB [https://indico.cern.ch/event/272620 agenda] is taking shape. There is no pre-GDB.
 
* The first [https://indico.cern.ch/event/297652/other-view?view=standard HEP Software Meeting] take place at CERN on 3rd and 4th April.
 
 
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 66: Line 61:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas]
+
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | WLCG Operations Coordination - [https://indico.cern.ch/categoryDisplay.py?categId=4372 Agendas][https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsCoordination Wiki Page]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 73: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 +
'''Tuesday 11th June'''
 +
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 +
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
  
'''Tuesday 22nd April'''
 
* There was a WLCG operations coordination planning meeting last Thursday. The [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140417 minutes] are now available. Also see the [https://indico.cern.ch/event/309125/ agenda].
 
* There was a request to add xrootd endpoints of your site in GOCDB. Alessandra provided this [http://tinyurl.com/p883hkh status summary link].
 
  
'''Tuesday 15th April'''
 
* The next WLCG planning meeting will be will be on Thursday April 17th at 15:30 CERN time. [https://indico.cern.ch/event/309125/ Agenda]: [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140417 twiki with plans].
 
* The middleware readiness group are putting forward an initial list of [https://twiki.cern.ch/twiki/bin/view/LCG/MiddlewareReadiness#Volunteer_Sites volunteer sites] at an MB today. The [https://indico.cern.ch/event/296397/contribution/4/material/0/ rewards process/need is described in these documents] and the [https://twiki.cern.ch/twiki/bin/view/LCG/MiddlewareReadiness#Procedure_Guidelines_VOs_Sites rollout process here].
 
* The next multi-core deployment TF meeting is [https://indico.cern.ch/event/305623 at 13:30 today] on SLURM.
 
  
'''Tuesday 8th April'''
 
* The next WLCG ops [http://indico.cern.ch/event/309125/ planning meeting] in on 17th April.
 
* Minutes of 3rd April meeting are available [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes140403 at this link].
 
  
* Registration for the next [https://indico.cern.ch/event/305362/ WLCG workshop] opens this week.
 
* WLCG [ps://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineVersions baselines] have been updated. gLiteWMS to be checked.
 
* Various Tier-0/1 storage updates - see table in minutes
 
* Various Oracle updates have been completed at CERN.
 
* Job efficiency report Meyrin vs Wigner being compiled.
 
* Some delays in use of VOMS-admin (due to some bugs to be fixed and some features that need further understanding/changing (because of their different behaviour to VOMRS).
 
* CERN batch capacity migrated to SLC6 was at 65% last week.
 
* ALICE: Steady activities in preparation for Quark Matter 2014 (May 19-24, GSI Darmstadt)
 
* ATLAS: Rucio commissioning: we started just in the last days the commissioning of the various Rucio services. DataTransfer issues: observed few links with "slow transfers" (order of 0.5MB/s) includes 3 UK sites. Observed issue with CVMFS cache: ATLAS file is 2.2GB and the default shared cache was set to 2GB.
 
* CMS: DBS2 will be switched off April 7th. CVMFS switch at CERN: Monday, April 14th .
 
* LHCb: Incremental stripping campaign almost finished. Future VOMS2 server added to the VO card.
 
* Tools: GGUS new version released on 26 March: multiple site notification, CMS specific SU and forms.
 
* FTS3: New version deployed as pilot - in production in 2-3 weeks if no issues.
 
* glexec: 79 tickets closed and verified, 16 still open (no change)
 
* Machine/JF: detailed plan for bare metal, cloud, client and bi-directional developments has been discussed and agreed within the TF
 
* Middleware readiness: process agreed. Volunteer sites to be agreed by 15th April.
 
* Multi-core: Various reviews done. Next review experience in CMS and ATLAS shared sites when handling multicore jobs from both VOs.
 
* perfSONAR: Deadline for perfSONAR installation has passed (April 1st). 9 sites missing out of 111. No UK sites listed - thank you! But some firewall issues to resolve.
 
* SHA-2: EGI Operations Portal VO cards for the experiments have been updated with the details of the future VOMS servers
 
* WMS decommissioning: CERN WMS instances for experiments are being drained as of 13:53 CEST on April 1
 
* xrootd: no update
 
* IPv6: Some new test sites. Panda Dev instances are being made dual stack.
 
* http proxy discovery: no update.
 
  
'''Tuesday 1st April'''
 
* A reminder that the next [https://indico.cern.ch/event/305625/ multi-core WG] meeting is this afternoon.
 
* The next WLCG ops coordination meeting is this [https://indico.cern.ch/event/309124/ Thursday 3rd April].
 
  
 
<!-- **********************End ops coord text************************** ----->
 
<!-- **********************End ops coord text************************** ----->
Line 130: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 15th April'''
+
 
* The alias for the RAL CVMFS Stratum 1 to point to the new CVMFS Stratum 1 server running version 2.1 next week ws updated this morning (09:30). No change is need by sysadmins - just flagging this up.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The software server used by the small VOs will be withdrawn from service (aiming for June).
+
<!-- *********************************************************** ----->
* Tier1 Outage announced for Tuesday 29th April for the upgrade of the Tier1 network's link into the RAL site core network.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 148: Line 136:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 22nd April'''
 
* A DPM collaboration meeting is being planned for the coming week(s). Are there any site comments or feedback on DPM as a product (e.g. speed of new feature development) and the support it receives?
 
  
'''Wedn. 2 April 2014'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* All metrics green for the past quarter!
+
* DOME upgrade problems at Edinburgh
* Performance issues being pursued - Brian is testing/coordinating
+
* Data management support/development for IRIS users
* Report from [http://www.gridpp.ac.uk/gridpp32/ GridPP32]: "big" VOs, "small" VOs.  See [http://gridpp-storage.blogspot.co.uk/2014/03/storage-thoughts-from-gridpp32.html blog].
+
* Report from [http://indico3.twgrid.org/indico/conferenceDisplay.py?confId=513 ISGC2014]: dCache, DIRAC, new countries.  See [http://gridpp-storage.blogspot.co.uk/2014/03/highlights-of-isgc-2014.html blog].
+
  
'''Tuesday 18th March'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Chris noticed some of [http://pprc.qmul.ac.uk/~lloyd/gridpp/nettest.html Steve's tests] failing. At IC this related to a full spacetoken. Bristol is not working as there is no SCRATCHDISK spacetoken. Durham fails with a no space left on device error message.  
+
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''March 2014'''
 
* How would we move data between [https://www.stfc.ac.uk/1263.aspx DiRAC] and GridPP?
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 168: Line 172:
  
 
<!-- ****************End Storage & DM****************** ----->
 
<!-- ****************End Storage & DM****************** ----->
 +
<!-- ****************Start T2EVO****************** ----->
 +
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 +
|-
 +
| style="background-color: #f8d6a9; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Tier-2 Evolution - [https://its.cern.ch/jira/browse/GRIDPP/ GridPP JIRA]
 +
|-
 +
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 +
 +
====== ======
 +
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 30 Apr 2019'''
 +
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 +
 +
<!-- ******************Edit stop********************* ----->
 +
<!-- ************************************************************ ----->
 +
|}
 +
 +
<!-- ****************End T2EVO****************** ----->
 
<!-- ****************Start Accounting****************** ----->
 
<!-- ****************Start Accounting****************** ----->
  
Line 178: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 15th April'''
+
'''Tuesday 6th February'''
* The APEL accounting system has been undergoing database maintenance to improve performance and reliability. Networking problems at the RAL site have delayed completion of the operation. Sites may see nagios alerts warning them that they have not published accounting data for 7 days - these will stop after the maintenance work completes.  
+
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
  
'''Tuesday 1st April'''
 
* [http://accounting.egi.eu/country.php?Path=1.65&query=normcpu&startYear=2014&startMonth=3&endYear=2014&endMonth=4&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL publishing] is not up-to-date for Sheffield and ECDF.
 
  
'''Tuesday 18th March'''
+
'''Tuesday 30th January'''
* A review of the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 HEPSPEC page] reveals that most sites now have SL6 entries with the exceptions being: UCL-HEP; Manchester and RALPP. We will be checking HS06 figures in the 2014 Q1 quarterly reports so the deadline for action is 31st March 2014.
+
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
* [http://accounting.egi.eu/country.php?Path=1.64&query=normcpu&startYear=2013&startMonth=2&endYear=2014&endMonth=3&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL publishing] appears up-to-date for all sites.
+
 
+
'''Tuesday 24th Oct'''
*  Check publishing via: http://gstat2.grid.sinica.edu.tw/gstat/summary/Country/UK/
+
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 
 +
 
 +
'''Monday 16th January'''
 +
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 +
 
 +
'''Monday 14th November'''
 +
* Alessandra has written an [https://twiki.cern.ch/twiki/bin/view/LCG/AccountingFAQ FAQ] to extract numbers from ATLAS and APEL avoiding the SSB.
 +
 
 +
'''Monday 26th September'''
 +
* A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
 +
 
 +
* [http://accounting.egi.eu/egi.php?SubRegion=1.67&query=normcpu&startYear=2014&startMonth=8&endYear=2014&endMonth=9&yRange=SITE&xRange=VO&voGroup=lhc&chart=GRBAR&scale=LIN&localJobs=onlygridjobs APEL status]: An issue at Sheffield?
  
 
<!-- *****************Edit stop*********************** ----->
 
<!-- *****************Edit stop*********************** ----->
Line 197: Line 228:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=area KeyDocs]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Documentation - [https://www.gridpp.ac.uk/keydocs?sort=area KeyDocs]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 205: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
See the [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
+
''' Tue 9th July 2019'''
 +
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''Tuesday 15th April'''
 
* There was an extended TB-SUPPORT thread on testing out https://www.gridpp.ac.uk/wiki/Grid_Certificate. Summary and conclusions?
 
* Ops changes recorded to https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs.
 
  
'''Tuesday 1st April'''
 
* [https://www.gridpp.ac.uk/php/KeyDocs.php?sort=reviewed Keydocs] action needed by Jens J; Rob H/Security T; Alessandra F; Wahid B; David C and Matt D.
 
* We need to reassign Mark M's documents on Core Grid Services
 
  
 +
'''General note'''
  
'''Tuesday 18th March'''
+
See the [https://www.gridpp.ac.uk/keydocs?sort=reviewed worst KeyDocs list] for documents needing review now and the names of the responsible people.
* Keydocs action needed by: Mark M; Jens J; Rob H/Security T; Alessandra F; Wahid B; David C and Matt D.
+
  
 
|}
 
|}
Line 225: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Grid_Operations_Meetings EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 232: Line 320:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
[[Tuesday 15th April]]
+
''' 14 May 2019 '''
* Minutes of last week's EGI operations meeting are [https://wiki.egi.eu/wiki/Agenda-07-04-2014#4._Minutes now available online].
+
* Meeting for May cancelled. Next meeting is on 10th June.
  
'''Tuesday 8th April'''
+
''' Monday 11th March '''
*Meeting yesterday (Agenda: https://wiki.egi.eu/wiki/Agenda-07-04-2014)
+
** URT
+
*** ARC - 13.11u1 version 4.1.0, UMD-3 dcache-server 2.6.23, BDII core - new glue-validator, DPM/LFC - v. 1.8.8, GFAL/lcg_utils - v. 2.5.5, FTS3 - v. 3.1.74, GridSite - v. 2.2.3, CANL - v. 2.1.4, WMS v. 3.6.4
+
** UMD release:
+
***lcg-CA 1.56 out on April 2, alarms imminent (though on checking UK sites most are updated)
+
*** UMD 3.6.0 ready for release: wms v. 3.6.3, cream_torque v. 2.1.3, dpm-yaim v. 1.8.7, gridsite v. 2.2.2, glexec-wn v. 1.2.2
+
*** New in UMD: gfal2 v. 2.4.8, slurm-wn v. 1.0.0, cream-slurm v. 1.0.1, gridsafe v. 1.3.1
+
** SR:
+
***wms v. 3.6.4
+
***UMD-3 campaign, checking for updates on early adopter sites listed for UMD-3 https://www.egi.eu/earlyAdopters/table
+
***Some UK sites listed as not replying and still listed under UMD1/2
+
**EMI-2 decommissioning
+
***Presentation on progress is here: https://indico.egi.eu/indico/getFile.py/access?resId=2&materialId=slides&confId=2151
+
***In summary progressing well, no showstoppers visible
+
  
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 +
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 +
 +
''' Friday 1st February '''
 +
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 +
* No UK specific issue mentioned.
 +
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 +
'
  
  
Line 267: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 15th April'''
+
'''Tuesday 4th July'''
* Meeting last Friday
+
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
** Agenda and minutes: https://indico.cern.ch/event/312587/
+
 
** SAM Nagios plugin talk: https://indico.cern.ch/event/312587/contribution/3/material/slides/0.pdf
+
'''Monday 13th February'''
** Availability comparison between SUM and SAM3: https://indico.cern.ch/event/312587/contribution/4/material/slides/1.pdf
+
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 +
 
 +
'''Tuesday 1st December'''
 +
* Sites are kindly invited to update the monitoring status page at https://www.gridpp.ac.uk/wiki/Site_monitoring_status
 +
 
 +
 
 +
'''Tuesday 16th June'''
 +
* F Melaccio & D Crooks decided to add a [https://www.gridpp.ac.uk/wiki/Monitoring_FAQs FAQs section] devoted to common monitoring issues under the monitoring page.
 +
* Feedback welcome.
 +
 +
 
 +
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 285: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 22nd April'''
+
'''Tuesday 5th February'''
* There were ongoing problems with the dashboard last week. Several bugs, possibly including one related to the email function, have been fixed.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
'''Tuesday 15th April'''
 
* A new availability poll for ROD members has been circulated - please complete it this week!
 
* Gareth has been closing GLUE2 validation warnings. They seem to come back....
 
* Gareth submitted notepad entries for the GKLUE2 validation warnings. (Tickets for criticals).
 
* There are several ongoing issues with the new dashboard.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 306: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
 +
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 18th March'''
 
* The EMI-2 decommissioning task has started.
 
* The [http://indico.cern.ch/event/MW-Readiness_3 next WLCG middleware readiness WG meeting] takes place this afternoon at 13:30 UK time.
 
  
'''Tuesday 11th February'''
 
* 31st May has been set as the deadline for EMI-2 decommissioning. There may be an issue for dCache (related to 3rd party/enstore component).
 
  
'''References'''
+
 
 +
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 330: Line 442:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [http://www.gridpp.ac.uk/security/inchand/Incident.html Incident Procedure] [http://www.gridpp.ac.uk/security/policies/index.html Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Security - [https://www.gridpp.ac.uk/wiki/Report_Security_Incident Incident Procedure] [https://wiki.egi.eu/wiki/SPG:Documents Policies] [https://www.gridpp.ac.uk/wiki/SD_rota Rota]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
  
 
===== =====
 
===== =====
'''Tuesday 15th April'''
+
'''Tuesday 11th June
* Update on the OpenSSL status.
+
* The discussion list members have been updated. Anyone missing?
+
 
+
'''Monday 7th April'''
+
* There was an EGI SVG Advisory 'High' RISK - Vulnerability announced
+
* The security team meeting last week did not take place.
+
* Linda has produced a new rota - only 2 people had responded to the poll so please check if you are in the team!
+
  
 +
* NTR
  
 
|}
 
|}
Line 356: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://perfsonar.racf.bnl.gov:8080/PsDisplay-1.0-SNAPSHOT/clouds.jsp?id=26 PerfSonar dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 362: Line 468:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 15th April'''
+
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
* New LiveCD and LiveUSB images are [http://software.internet2.edu/pS-Performance_Toolkit/ now available] containing the latest openssl packages (see email of 11th April).
+
 
 +
'''Monday 5th March'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
 +
 
 +
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
'''Tuesday 8th April'''
 
* Some discrepancies found in VOMS ports and listings between VOMSsnooper and the dashboard for ops. (15009 vs 15002.
 
* Also noted WLCG VOMS changes. New VOMS servers are being introduced as notified in [https://operations-portal.egi.eu/broadcast/archive/id/1102 this broadcast].
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 382: Line 502:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
 
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 397: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 17th March'''
+
'''Monday 20th November'''
* The [[Quick_Guide_to_Dirac|GridPP DIRAC]] service is now able to submit jobs to VMs on [http://www.gridpp.ac.uk/vac/ Vac] sites. [[Vac configuration for GridPP DIRAC]] explains how to configure a Vac site to run GridPP DIRAC jobs in VMs. More volunteer sites would be useful.
+
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
* EGI has published a new [https://documents.egi.eu/document/2069 roadmap for operations tools].
+
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 +
 
 +
'''Tuesday 18th July'''
 +
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 +
 
  
'''Tuesday 26th November'''
 
* Regional [https://gridppnagios.lancs.ac.uk/nagios Nagios] updated to release 22. It is a glite to UMD update and it required a fresh installation.
 
* There have been some internal changes in SAM-Nagios. Test probes are now the responsibility of product team. Some test names have been changed as a result of this reorganization.  For example the org.sam.CREAMCE-DirectJobSubmit test has become  emi.cream.CREAMCE-DirectJobSubmit.  This does not affect the operational activities.
 
* Please could all site admins look at services associated to their site and please mail Kashif if anything odd is noticed. Site admins can reschedule tests for their sites and it would be helpful if most functionalities are tested.
 
* Also, look at [https://gridppnagios.lancs.ac.uk/myegi/ myegi] which can be useful with links to the Dashboard, GSTAT, Accounting Portal and GGUS. 
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 414: Line 533:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 1em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~walker/votable.html VO table]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | VOs - [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS] [http://operations-portal.egi.eu/vo VO IDs] [https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs Approved] [http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html VO table]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 420: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
Tuesday 15th April
 
* Is there interest in an FTS3 web front end? ([http://indico.cern.ch/event/272620/contribution/11/material/slides/1.pdf more details])
 
 
'''Monday 17 February 2014'''
 
* Proxy renewal
 
** All RAL WMSs now renew proxies with 1024 bits. This looks like the end of this (at last).
 
  
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
  
'''Tuesday 11 February 2014'''
 
* Proxy renewal
 
** lcgwms06 at RAL has been upgraded and works
 
** Both Imperial's WMSs work
 
** Glasgow's will still need to be upgraded (unless they have been since Friday).
 
  
 
* Impact
 
* Impact
Line 450: Line 562:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Date'''
 +
  
'''Tuesday 8th April'''
 
* Steve noted that Liverpool are having a problem with the CVMFS clients on their workers nodes. "...in short, VO/CVMFS admin for na62 and mice are publishing stale .cvmfswhitelist and repos cannot be mounted on new systems. I expect this to spread to other systems and VOs as local cache dates expire."
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 512: Line 624:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Wednesday 23rd April 2014'''
+
Highlights from this meeting are now included in the Tier1 report farther up this page.
* [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2014-04-23 Operations report]
+
* Reminder of the intervention to update the Tier1's network connection into the RAL site network next Tuesday 29th April.
+
* There will be a UPS/Generator load test on Wednesday 30th April. ('Warning' announced in GOC DB).
+
* Reminder: The software server used by the small VOs will be withdrawn from service (aiming for June).
+
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 569: Line 677:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''4th February 2014'''
 
With reference to the [https://indico.egi.eu/indico/conferenceDisplay.py?confId=1858 OMB on 30th January].
 
 
- UMD-2 will be decommissioned in the coming months. 30th April end of security support. 31st May all services to have been removed or upgraded.
 
 
- UK sites failing Glue2:
 
 
RAL-LCG2
 
UKI-LT2-IC-HEP
 
UKI-NORTHGRID-MAN-HEP
 
UKI-NORTHGRID-SHEF-HEP
 
UKI-SCOTGRID-GLASGOW
 
UKI-SOUTHGRID-RALPP
 
 
Check with the glue2 validator to see errors.
 
 
- A new Operations Dashboard will be in pre-production during February and moved into production in March.
 
 
- Availability/reliability targets for EGI are moving to 80%/85%.
 
 
- Some new ARC SAM tests are being introduced: org.nordugrid.ARC-CE-LFC-result; org.nordugrid.ARC-CE-LFC-submit; org.nordugrid.ARC-CE-SRM-result;
 
org.nordugrid.ARC-CE-SRM-submit; org.nordugrid.ARC-CE-submit
 
 
- There is a summary page on how to publish from various middleware types: https://wiki.egi.eu/wiki/MAN09
 
 
- There was an overview of the French NGI adoption of iRODs.
 
 
- FedCloud to production: Management (GOCDB - ok); Monitoring (in progress); Accounting (in progress); Documentation (ok); Support (ok); Dashboard (in progress) and Security (in progress).
 
- The SAM tests are: org.nagios.CloudBDII-Check; eu.egi.cloud.OCCI-VM and org.nagios.OCCI-TCP. Security checks not yet available.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 612: Line 691:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
Empty
+
'''Atlas S&C week 2-6 Feb 2015'''
 +
 
 +
Production
 +
 
 +
• Prodsys-2 in production since Dec 1st
 +
 
 +
• Deployment has not been transparent , many issued has been solved, the grid is filled again 
 +
 
 +
• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.
 +
 
 +
Rucio
 +
 
 +
• Rucio in production since Dec 1st and  is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.
 +
 
 +
• [https://rucio-ui.cern.ch/dumps Rucio dumps available].
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMDarkDataCleaning Dark data cleaning]
 +
 
 +
• [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFilesLost files declaration] .  Only  Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.
 +
 
 +
• Webdav panda functional tests with Hammercloud are ongoing
 +
 
 +
Monitoring
 +
 
 +
• [http://adc-monitoring.cern.ch/ Main page]
 +
 
 +
• [http://dashb-atlas-ddm-acc.cern.ch/dashboard/request.py/ddmaccounting DDM Accounting]
 +
 
 +
• [http://atlas-agis.cern.ch/agis/ddmblacklisting/listGroup space]
 +
 
 +
• [http://dashb-atlas-ddm.cern.ch/ddm2/  Deletion]
 +
 
 +
ASAP
 +
 
 +
• ASAP (ATLAS  Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are [https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ATLASSiteCategorization reported to the International Computing Board.]
 +
 
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A