Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(480 intermediate revisions by 15 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th June 2018
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Monday 25th June'''
 
* July pre-GDB: Authorization & Authentication Infrastructure for WLCG. [https://indico.cern.ch/event/651343/ Agenda]. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGAuthorizationWG Documents].
 
*[https://www.jisc.ac.uk/events/100-gigabit-ethernet-networking-workshop-04-jul-2018 100GbE networking workshop, London, 4th July]
 
* Steve: who knows how to use xrdcp?
 
* 18th June WLCG ops meeting. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek180618 Agenda and notes].
 
* 25th June WLCG ops meeting. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek180625 Agenda and notes].
 
  
 +
'''Tuesday 11th June'''
  
'''Monday 11th June'''
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* There is a [https://indico.cern.ch/event/651342/ pre-GDB Tuesday on benchmarking].
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* There is a [https://indico.cern.ch/event/651354/ June GDB on Wednesday].  
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
* [https://indico.cern.ch/event/721692/ HEPSYSMAN is next week 18th-19th June] - so no ops meeting next Tuesday.
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
* Winnie – 8th June problem with argo-mon.egi.eu
+
<!-- ***********************Start General text*********************** ----->'''
* Progress towards running LSST DESC data challenge on GridPP. Lack of multicore option in DIRAC for per VO basis.
+
'''Tuesday 4th June 2019'''
* DPM 1.10.2 update issue
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* dCache and IPv6: GridFTP doors and pools require that if a client can connect to an IPv6 address on an interface, that interface should also have an IPv4 address to which that client can connect.
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* Brian: requested input last week to [https://www.gridpp.ac.uk/wiki/Suggestions_for_suitable_hardware_to_run_a_Grid_SE Hardware for Grid SE page].
+
* iris.ac.uk VO - Andrew explained this.
* Of note: VO vo.geoss.eu status from Pending to Production
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
* APEL: delay in processing VM accounting records and new cloud data appearing in the Portal during the week of the 11th to 15th June. This is so that the APEL Repository can be updated to correctly assign the usage VMs incur to individual months when they run over month boundaries (i.e. long running VMs). This requires reloading a large volume of existing cloud accounting data once the update has been applied.
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
* May A/R (waiting for replies to 6th June request):
+
* Anything else?
** ALICE All OK
+
** Atlas RHUL 81% Lanc 86%
+
** LHCB RHUL 76% Bristol 74% (Availability only)
+
** CMS Bristol 77%
+
* WLCG weekly [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek180611 ops meeting minutes from Monday 11th].
+
* Today there are issues affecting the databases that GOCDB relies on, leading to very slow responses through the portal and API.
+
  
  
'''Monday 21st May'''
 
* CHEP 2018 registration is open until June 2nd.
 
* As of 15th May: [https://wiki.egi.eu/wiki/EGI_IGTF_Release EUGridPMA have announced] a new set of CA rpms.
 
* AD will talk on Rucio work at the storage meeting tomorrow.
 
* The WLCG weekly ops meeting takes place on Tuesday this week ([https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek180521 meeting notes]).
 
 
'''Monday 14th May'''
 
* HEPSYSMAN registration and requests. The meeting will run 18th-20th June. Please register [https://indico.cern.ch/event/721692/ here].
 
* An annual review of GOCDB information will be carried out next week (as requested under [https://ggus.eu/index.php?mode=ticket_info&ticket_id=135038 GGUS 135038]. Please check your site information during this week to reduce requests next week.
 
* The [https://indico.cern.ch/event/676324/ Spring HEPiX takes place this week 14th-18th May] at the University of Wisconsin. [https://indico.cern.ch/event/676324/timetable/#all.detailed Detailed agenda].
 
* The next [https://indico.cern.ch/event/717615/timetable/ WLCG SOC workshop - CERN 27th-29th June].
 
* EGI A/R figures per NGI for recent months can be seen on [http://argo.egi.eu/ar-ngi?month=2018-04 this page].
 
* The latest [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek180514 WLCG ops summary (from yesterday) is available in the wiki].
 
  
 
<!-- **********************End General text************************** ----->
 
<!-- **********************End General text************************** ----->
Line 85: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 +
'''Tuesday 11th June'''
  
'''Monday 25th June'''
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes180607 WLCG ops coordination meeting (7th June)]
+
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
  
* [https://indico.cern.ch/event/724729/ WLCG archival storage WG - 7th May]
 
  
'''Monday 16th April'''
 
* There was a meeting on 12th. [https://indico.cern.ch/event/711927/ Agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes180412 Minutes].
 
** Balazs Konya is new in the role of WLCG Middleware Officer.
 
** Next meeting 7th June.
 
** Delay for submission of GGUS tickets for recalculation should be respected. It is 10 days after monthly drafts of the availability reports are sent around by WLCG project office. If the GGUS tickets are not submitted respecting 10 days delay, they are not accepted.
 
** A/R recalculations will be accepted if they are relevant to the site MoU commitment or concern time ranges of sufficient length.
 
  
'''Monday 5th March'''
 
* The [https://indico.cern.ch/event/708574/ agenda] and [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes180301 minutes] from the WLCG ops coordination meeting last week are available.
 
* Special topics were: CNAF recovery update; SAM recalculation policy draft discussion and Progress on WLCG Storage Space Accounting Prototype including tape metrics.
 
  
'''Tuesday 27th February'''
 
* Next WLCG Operations Coordination meeting  will take place this [https://indico.cern.ch/event/708574/ Thursday 1st of March starting at 15:30 CEST].
 
  
  
Line 121: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 11th June'''
 
  
'''Tue 25 June'''
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
Report for the Experiments Liaison Report (11/06/2018) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2018-06-11 here].
+
<!-- *********************************************************** ----->
* '''Continuing problems with small VOs and Castor (BDii)''' - Please be advised that in the light of the impact on a number of smaller VO's the removal of this service has caused, that Castor information (at least in the short term), is now being published in the BDii.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 141: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20180613-minutes.txt Wed 13 June]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Future directions for T2s with DPM?
+
* DOME upgrade problems at Edinburgh
* Assessing storage requirements for IRIS
+
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
  
'''Wed 06 June'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
* Report from DPM workshop
+
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
  
'''[http://storage.esc.rl.ac.uk/weekly/20180530-minutes.txt Wed 30 May]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
* Problems with deep vs shallow checksums in implementations - does the system present the checksum the data has or the checksum it thinks the data should have?
+
* Storage related stuff at the FNAL (pre-)GDBs
* IPv6 use - how to ensure IPv6 only transfers
+
* DOME upgrade tickets for non-DOME DPM sites
  
'''[http://storage.esc.rl.ac.uk/weekly/20180516-minutes.txt Wed 16 May]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
* Operational issues some of which at least are due to timeouts hardwired in the system.
+
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
* Report on CERN data lakes - still lots of questions, though. Maybe if we could try it out?
+
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20180502-minutes.txt Wed 02 May]'''
 
* DPM DOME discussion... will Glasgow (or someone else) volunteer to test before DPM workshop?
 
* Storage agenda for HEPiX
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 174: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 26th Jun'''
+
'''Tuesday 30 Apr 2019'''
* LHCb Docker containers in production testing at Manchester
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
* "Universal" DIRAC VMs for LHCb and GridPP in production testing at Manchester
+
* These VMs include a fix for the LZ GFAL problems
+
 
+
'''Tuesday 5th Jun'''
+
* RHUL updated to Vac 3.0 / Vac-in-a-Box 1.0 last week, including support for custom network configurations (network interface bonding)
+
 
+
'''Tuesday 15th May'''
+
* New WLCG Lightweight Sites WG starting: https://twiki.cern.ch/twiki/bin/view/LCG/LightweightSites
+
 
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 238: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 11th June 2018'''
+
''' Tue 9th July 2019'''
  
Steve Jones is updating the User Guide with various mods that have cropped up since Tom Whyntie left (pending permission to edit GridPP website docs...)
+
LHCb has added this to their requirements:
  
'''Tuesday 11th June 2018'''
+
Sites not having an SRM installation must provide:
  
Approved VOs now contains two new SKA VOMS servers (at Oxford and Imperial, as well as Manchester).
+
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
  
 +
''' Tue 16th April 2019'''
 +
 +
Minor change to LHCB requirements in Approved VOs:
 +
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
 +
New VOMs rpms to match.
 +
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 +
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''Tuesday 8th May 2018'''
 
  
* Updating GridPP website certificate to avoid Chrome warnings
 
  
 
'''General note'''
 
'''General note'''
Line 269: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 11th June'''
 
* Meeting agenda : [https://wiki.egi.eu/wiki/Agenda-2018-06-11]
 
* Upcoming releases relevant to UK sites
 
** gfal2 major release(2.5.4)
 
** Arc 5.4.2
 
  
* Yearly review of information in GOCDB. UK ticket status is in progress. Should each site update the ticket?
+
''' 14 May 2019 '''
* Sites can enable ARGO notification through GOCDB. It can be done at site level or at the service level
+
* Meeting for May cancelled. Next meeting is on 10th June.
* Final call for WMS decommission. No UK WMS is in the list.
+
* WebDav probes will be added to ARGO_MON_CRITICAL profile which means that unavailability of webdav will be added to A/R figures. All UK endpoints are passing the test at the moment
+
* Next meeting 9th July
+
  
'''Monday 14th May'''
+
''' Monday 11th March '''
* Meeting today: [https://wiki.egi.eu/wiki/Agenda-2018-05-14 Agenda]
+
* Access to UMD3 repos has ceased: https://ggus.eu/index.php?mode=ticket_info&ticket_id=135100
+
* org.nordugrid.ARC-CE-sw-csh probe removed from CRITICAL and OPERATORS profiles
+
* Yearly review of the information registered into GOC-DB - to be completed by June 6 (see item in General section)
+
  
* Next meeting June 11th
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
* EGI repos guidance/Ongoing campaigns: https://www.gridpp.ac.uk/wiki/Muddleware
 
** Proposal to rename this to "EGI Operations"
 
  
'''Tuesday 24th April'''
+
''' Tuesday 12th February '''  
* The next EGI OMB is on 3rd May
+
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
'''Tuesday 6/3
 
* Next meeting on Monday: https://indico.egi.eu/indico/event/3639/
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 341: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12th June'''
+
'''Tuesday 5th February'''
* Four availability tickets still open. One ticket on hold at RAL as they are figuring out that how to deal with castor publishing issue.  
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* Dashboard struggled during the week and it was slow but now it seems to be OK.
+
* Few availability tickets on hold
* One Bristol ticket got stuck in weird state where it can not be deleted from dashboard although it has been solved.
+
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''Monday 21st May'''
+
'''Tuesday 14th August'''
* There was a problem with jobs accessing  http://repository.egi.eu:80/sw/production/cas/1/current/meta/ca-policy-egi-core.list to get the latest release so many arc ce test fails. No tickets opened for these alarms and the problem went away when the underlying issue was fixed.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
 
+
 
+
'''Monday 5th March'''
+
* AM->GS. A quiet week last week.
+
  
  
Line 393: Line 447:
  
 
===== =====
 
===== =====
'''Monday 25th June'''
+
'''Tuesday 11th June
* EGI IGTF CA update, version 1.92-1 ticket created [https://rt.egi.eu/rt/Ticket/Display.html?id=14423 EGI 14423]
+
 
+
 
+
'''Tuesday 5th June'''
+
* Advisory update
+
* David now in post
+
* Meeting scheduled for this afternoon
+
 
+
'''Tuesday 15th May'''
+
* Meeting scheduled for this afternoon
+
 
+
'''Tuesday 8th May'''
+
* EGI IGTF CA update, version 1.91-1 ticket created [EGI #14315]
+
 
+
'''Monday 30th April'''
+
* (David) Any feedback from the EOSC security communications meeting?
+
 
+
'''Tuesday 24th April'''
+
 
+
*A reminder about the next SOC workshop. 27th-29th of June at CERN: https://indico.cern.ch/event/717615/
+
 
+
 
+
'''Tuesday 20th March'''
+
 
+
Communication challenge took place on Wednesday 14th March.
+
  
 +
* NTR
  
 
|}
 
|}
Line 432: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar development dashboard] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 439: Line 469:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 +
 +
'''Monday 5th March'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
  
 
'''Monday 30th April'''
 
'''Monday 30th April'''
Line 462: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 25th June 2018, 15.00 BST'''<br />
 
 
38 Open UK Tickets this week.
 
 
'''BRUNEL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=133956 133956] (9/3)<br />
 
Any update for this CMS xroot ticket? The VO re-poked the ticket a few weeks ago and they were still seeing unwanted behaviour. In progress (15/6)
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=135455 135455] (31/5)<br />
 
CMS Checksums failing. After Chris cleared up some bad files it still looks like a few more persist at the last update. In progress (4/6)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=135293 135293] (23/5)<br />
 
ROD ticket for Castor after the publisher was took offline. Daniela notes that the alarms have gone from the dashboard and asks if things are fixed - I believe that a new (if temporary) publisher was put in place? On hold (25/6)
 
 
'''SHEFFIELD'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=134947 134947] (4/5)<br />
 
Atlas file transfers. It looks like atlas are just reusing the old ticket for the latest batch of failures they are seeing. Reopened (11/6)
 
 
'''BRISTOL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=134820 134820] (29/4)<br />
 
Can we please close this CMS ticket? The VO doesn't seem bothered with it. In progress (1/5)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=135552 135552] (7/6)<br />
 
CMS SAM test failures after a disk node hit some troubles. Taking a look at the test pages it's looking nice and green again so I suspect this ticket can be closed too.
 
  
'''ECDF'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=135404 135404] (30/5)<br />
+
Low availability ticket. Looking at the monitoring I see some more blue negative availability days in argo, so it looks like some weird stuff has been going on. It'll be a while before the alarm clears itself (especially as the weekend wasn't great), so this ticket could do with being put on hold. In progress (4/6)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A