Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(816 intermediate revisions by 17 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 18th December 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Monday 18th December'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* There was a WLCG GDB last week. [https://indico.cern.ch/event/578993/ Minutes] are available.  
+
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
  
'''Monday 4th December'''
+
'''Tuesday 11th June'''
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek171204 Monday's WLCG ops meeting minutes].
+
* Vip: ARC setup on CentOS7
+
* Daniela: ... trust anchors 1.88-1 breaks on SL6
+
* Simon:  I cannot connect to lcg-voms2.cern.ch - can anyone else?
+
* [https://twiki.cern.ch/twiki/bin/view/LCG/GDBMeetingNotes20171108 November GDB notes] are now available.
+
* CMS:  notes from the site support/computing operations meetings
+
* Mattermost clients. See  https://about.mattermost.com/download/.
+
 
+
 
+
 
+
'''Monday 27th November'''
+
* [https://docs.google.com/document/d/1mXJ51Xi1FEcQKzf6jJknmkC3MGeZqjPjgtoj3pVD6rk/edit# HSF CWP] "Roadmap for HEP Software and Computing R&D for the 2020s"
+
* [http://iopscience.iop.org/volume/1742-6596/898 CHEP 2016 proceedings] have been published.
+
* The next WLCG GDB will be on 13th December. [https://indico.cern.ch/event/578993/ Agenda].
+
* perfSONAR configuration change.
+
 
+
 
+
'''Monday 20th November'''
+
* CHEP 2018 abstract submission is [https://indico.cern.ch/event/587955/abstracts/ open].
+
* Germany is leaving EGI from January 2018. GGUS will continue to be provided for WLCG. 
+
* TB-SUPPORT/general discussions:
+
** ATLAS PanDA Queue consolidation - UCORE. The VAC question....
+
** GRIDPP2: Deployment and support of SRM and local storage management
+
** CERN Mattermost chat - concept and groups
+
** LHCb multi-thread user jobs
+
** Mounting EOS outside of CERN. (See this [https://cern.service-now.com/service-portal/article.do?n=KB0003846 article]).
+
* The next LHCOPN/LHCONE meeting will be [https://indico.cern.ch/event/681168/ at RAL 6-7th March 2018].
+
* There is a [https://indico.cern.ch/e/cvm18 CERNVM users workshop 30th Jan to 1st Feb].
+
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek171120 Minutes from Monday 20th Nov WLCG ops meeting] are available.
+
  
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
  
Line 80: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 21st November'''
+
'''Tuesday 11th June'''
* The next WLCG ops coordination meeting will be on 7th December. Do we have any topics we would like covered?
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
  
'''Tuesday 7th November'''
 
* The WLCG ops coordination meeting last week ([https://indico.cern.ch/event/677078/ agenda] |  [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes171102 minutes] had as highlights the topics:
 
** Security Operations Center WG Workshop/Hackathon
 
** Review of EL7 migration plans
 
** Providing reliable storage: presentation by BNL
 
 
  
'''Monday 23rd October'''
 
* The next WLCG ops coordination meeting will be on 2nd November.
 
  
'''Tuesday 10th October'''
 
* There was an ops coordination meeting last Thursday 5th October: [https://indico.cern.ch/event/670207/ Agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes171005 Minutes].
 
** There is one action for us to follow-up: "Collect plans from sites to move to EL7". We could make use of the [https://www.gridpp.ac.uk/wiki/Batch_system_status Batch Systems] table.
 
  
  
Line 113: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 20th December'''
+
 
* T1 is now approaching Christmas running (22nd December 2017 - 2nd January 2018). No major changes are planned during this time.
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
 +
<!-- *********************************************************** ----->
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 130: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20171206-minutes.txt Wed 06 Dec]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Another success story - CERN@School running machine learning at QMUL
+
* DOME upgrade problems at Edinburgh
* Technical events coming up - hepsysman and cloud workshop at Crick. We ought to do something Useful or Interesting.
+
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
  
'''[http://storage.esc.rl.ac.uk/weekly/20171115-minutes.txt Wed 15 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
* More xcache progress at some sites; less at others who may be blocking on dependencies or be busy with Other Things(tm)
+
* Report from yesterday's Rucio Face Meeting at Coseners
* Some interest in following the non-X.509 authentication/authorisation
+
* Suggestions for following up from yesterday's CEPH day hosted by CERN
  
'''[http://storage.esc.rl.ac.uk/weekly/20171108-minutes.txt Wed 08 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
* Not (very) modest at all progress on xcache testing... from Chris at RALPP
+
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
  
'''[http://storage.esc.rl.ac.uk/weekly/20171101-minutes.txt Wed 01 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
* (very) modest progress on xcache testing...
+
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
* Except that RALPP has it fully working for dCache - hope to get full report next week
+
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 160: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 12 Dec'''
+
'''Tuesday 30 Apr 2019'''
* Vcycle updated for Glance API 2.0 and to support Vacuum Pipe VM definitions.
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 
+
'''Tuesday 14 Nov'''
+
* Single processor LHCb stoppable Monte Carlo VMs running in a mixture with fixed length 8 processor ATLAS VMs and single processor GridPP VMs. Please get in touch if you are running Vac and want to try this.
+
 
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 182: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
 +
 +
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
 
'''Tuesday 24th Oct'''
 
'''Tuesday 24th Oct'''
Line 213: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
 +
''' Tue 9th July 2019'''
  
'''Tuesday 12th Dec 2017'''
+
LHCb has added this to their requirements:
  
Resources requirements for CMS have been increased.
+
Sites not having an SRM installation must provide:
  
https://www.gridpp.ac.uk/w/index.php?title=GridPP_approved_VOs#VO_Resource_Requirements
+
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
  
Jobs require an address space larger than the memory size specified above. Sites should allow processes to use at least 6GB of virtual address space more per core than memory to accommodate the large amount of shared libraries used by jobs. (For a typical 8-core pilot that would translate into a VZSIZE limit of at least 64GB.)
+
''' Tue 16th April 2019'''
  
'''Nov 2017'''
+
Minor change to LHCB requirements in Approved VOs:
  
VOMS servers located at CNAF have been knocked out due to some flooding. It is not known when they might be recorvered. Hence, at present, there are no VOMS servers at all for both '''planck''' or '''ipv6.hepix.org'''. And a single new VOMS server has been provided for '''enmr'''. See the VOMS records in the Approved VOs document for details.
+
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
  
'''Tuesday 5th Sept 2017'''
+
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
  
New Approved VO. SKA European regional data centre, skatelescope.eu
+
'''Tue 2nd April 2019'''
  
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
This VO is ramping up and has requested support. Andrew McNab is the contact person for GridPP.
+
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
 
  
 
'''General note'''
 
'''General note'''
Line 250: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 20th November'''
 
* There was an EGI Operations Meeting today: [https://wiki.egi.eu/wiki/Agenda-2017-11-20 Agenda].
 
  
'''Monday 9th October'''
+
''' 14 May 2019 '''
* There was an EGO Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-09-10-2017 Agenda][https://indico.egi.eu/indico/event/3353/material/minutes/minutes.html Minutes]
+
* Meeting for May cancelled. Next meeting is on 10th June.
 +
 
 +
''' Monday 11th March '''
 +
 
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
  
* MW
+
* No UK specific issue mentioned.
** UMD 4.6 in November
+
*** UI, CREAM, ARGUS
+
*** If not before in 4.5.1
+
** UMD Preview update on 22/9
+
*** not rooted 4.7.0 has a bug, wait for update
+
*** CREAM version in Preview, please test if applicable (leading to release as noted above)
+
  
* Ops
+
* IPv6 readiness plan is going to be summarized at OMB.
** cASO (OpenStack Accounting extractor) update: 100%IT done (GGUS ticket 130665)
+
** A/R nothing to report
+
** Computation Power
+
*** Sites check data by end of the month
+
** EMI WMS
+
*** mice noted as being enabled on DIRAC
+
** IPv6 Readiness
+
*** Would be useful for us to provide a report
+
** webdav probes
+
*** If you're advertising a webdav endpoint, make sure it's in the GOC DB
+
** Storage accounting deployment
+
*** Enable by 30th October; tickets to follow. Note that per broadcast new data currently not showing, please ticket on errors in logs only
+
  
* Next meeting 13th November [https://indico.egi.eu/indico/event/3354/ Meeting link]
+
'
  
  
Line 324: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 20th November'''
+
'''Tuesday 5th February'''
* Generally quiet. There are three outstanding tickets: low availability at Birmingham, one at Liverpool which might just have gone green, and out-of-date IGTF CAs at Sheffield.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 +
 
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 366: Line 447:
  
 
===== =====
 
===== =====
 +
'''Tuesday 11th June
  
'''Tuesday 12th December'''<br />
+
* NTR
 
+
* Nothing new to report.
+
 
+
'''Tuesday 5th December'''<br />
+
 
+
Nothing to report concerning the UK.
+
 
+
DI4R conference was last week, https://indico.egi.eu/indico/event/3455/
+
 
+
Plans for integration/co-operation between various projects security teams during EOSC (European Open Science Cloud) project presented
+
 
+
https://indico.egi.eu/indico/event/3455/session/12/contribution/77
+
 
+
 
+
* GGUS tickets and the trust anchor. Who to ticket result?
+
 
+
* List of Root CAs used on the Grid: https://www.gridpp.ac.uk/wiki/GridRootCertificates
+
 
+
'''Tuesday 28th November'''<br />
+
 
+
* Nothing new to report (tracking update from last week - remember you can check your site!)
+
 
+
'''Tuesday 21st November'''<br />
+
 
+
A few sites have showed up in [https://pakiti.egi.eu/ pakiti] with high risk vulnerabilities. If you haven't been prodded about this already then expect an email from someone in the security team soon.
+
 
+
'''Monday 30th October'''
+
* EGI SVG ALERT [TLP:WHITE] Up to 'CRITICAL' risk, kernel exploit CVE-2017-7184 and others [EGI-SVG-CVE-2017-7184]
+
* <i>Upcoming meetings </i>
+
** Details and registration for SOC WG Workshop in December: [https://wlcg-soc-wg.web.cern.ch/content/workshop-cern-11th-12th-december-2017 Advert] [https://indico.cern.ch/event/676160/ Indico]
+
 
+
 
+
  
 
|}
 
|}
Line 412: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar development dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 420: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Monday 20th November'''
+
'''Monday 5th March'''
* perfSONAR: No news.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
* GridPP DIRAC: DPM & xrootd version. Upgrade due 16th November.
+
* RIPE ATLAS probes: Status & tests TBC
+
* The next LHCOPN/LHCONE meeting will be at [https://indico.cern.ch/event/681168/ RAL 6-7th March 2018]. The UK position on LHCONE is being reviewed. RAL T1 will (likely) connect via the LHCOPN in the coming months. T2s watch this space!
+
  
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
  
'''Monday 23rd October'''
+
'''Monday 2nd July'''
* The LHCOPN/ONE meeting took place last week at KEK, co-hosted with the HEPiX Fall meeting.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.  
** You can find a short report of the meeting [https://indico.cern.ch/event/646629/attachments/1544349/2423256/LHCOPNE-20171017-Tsukuba-meeting-report.pdf here.]
+
** All the slides presented are available in the [https://indico.cern.ch/event/646629/ agenda.]
+
  
'''Tuesday 4th July'''
+
'''Monday 30th April'''
* Pete C is preparing another networking forward look document. Note that figures presented in the Manchester workshop were for a Tier-2 (not always a single site).
+
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
  
[http://www.perfsonar.net/release-notes/version-4-0/ here]
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
Line 452: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 18th December 2017, 13.00 GMT'''<br />
 
48 Open UK Tickets this week.
 
 
'''Tickets that can be hopefully closed:'''
 
 
'''SUSSEX'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132189 132189] (29/11)<br />
 
This Sno+ ticket seems to be solved (at least at the site end) and the VO has said it can be closed. In progress (13/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132027 132027] (23/11)<br />
 
All the tests listed in this ROD ticket have been green for a while now, so this ticket looks like it can be closed too. Waiting for reply (14/12)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132438 132438] (11/12)<br />
 
Chris needed to order new certificates to solve this atlas ticket, and planned to roll them out today. Hopefully there was a set of wins and this ticket can be closed. On hold (11/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=130264 130264] (28/8)<br />
 
Whilst no one likes patching this close to Xmas, hopefully Chris can wrap up this biomed publishing ticket this week too. Good luck Chris! On Hold (6/12)
 
 
'''QMUL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132504 132504] (15/12)<br />
 
Dan caught the rogue node causing these LHCB troubles, so maybe this issue can be closed? In progress (15/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=130262 130262] (28/8)<br />
 
The Storm Devs have given some advice on how to patch Storm to get Glue 2 publishing to work to satisfy Biomed. Of course you might want to leave this until next year as it does call for re-yaiming. In progress (14/12)
 
 
'''MANCHESTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132422 132422] (10/12)<br />
 
Atlas deletion errors after one of the Manchester disk servers keeled over. Any word on the recovery? There haven't been many recent atlas deletion failures so this ticket looks like it could be closed. In progress (11/12)
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132356 132356] (7/12)
 
Raja has confirmed that this LHCB file access ticket can be closed. Waiting for reply (18/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132336 132336] (6/12)<br />
 
Similarly this ROD ticket looks like it can be checked and then closed. In progress (18/12)
 
 
'''Ticket that need shoring up for the Holidays:'''
 
 
'''IPV6 TICKETS'''<br />
 
If you have one of these ticket still open (which is most sites) and it's not On Hold yet (5 sites) then please can you consider putting it On Hold unless you plan to spend Christmas dual-stacking!
 
 
'''SUSSEX'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=122772 122772] (11/7/16)<br />
 
The atlas xroot/http ticket needs an update even if there's no news, and perhaps On Holding until it can be tackled again. In progress (18/10)
 
 
'''BRUNEL'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132517 132517] (15/12)<br />
 
A CMS request to change the stageout plugin to gfal2 at Brunel. Not spotted yet by the site (but it did come in Friday evening). Assigned (15/12)
 
 
'''RALPP'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132334 132334] (6/12)<br />
 
CMS stageout errors at RALPP. Chris tweaked a few things but at last check there were still errors, and the ticket could do with an update. In progress (7/12)
 
 
'''EDINBURGH'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132446 132446] (11/12)<br />
 
LZ and LSST dirac jobs having problems at ECDF. Rob has kicked a few things, but after a brief period of LSST jobs passing we're back to both VOs failing with the same error message (gridpp dirac jobs aren't having any problems). Is there time for one last bash at this before the Holidays? In progress (14/12)
 
 
'''MANCHESTER'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132121 132121] (28/11)<br />
 
Pheno noticing that their VOMS roles were occasionally disappearing. Any news on how the investigation's going? In progress (1/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=131526 131526] (1/11)<br />
 
The old storage accounting ticket. Any news? In progress (1/11)
 
 
'''TIER 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=132314 132314] (5/12)<br />
 
Most of the alarmed tests in this ROD ticket have gone green, but one fresh one has cropped up spoiling things- org.nordugrid.ARC-CE-sw-csh-ops "Could not find $PATH in the csh environment". Hopefully it will be an easy fix. In progress (11/12)
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=130207 130207] (24/8)<br />
 
Henry has tacked on a query on the health of Castor after noticing some MICE transfer failures last night, but this ticket could also do with an update, even if it's a boring one. On Hold (16/12)
 
  
[https://ggus.eu/?mode=ticket_info&ticket_id=131815 131815] (13/11)<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
This T2K ticket could well be closable - Brian and Henry have provided their advice and the next thing to do is see if this worked for the VO. In progress (1/12)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A