Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(883 intermediate revisions by 18 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 13th November 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
'''Monday 13th November'''
+
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
* WLCG T2 availability & reliability for October 2017
+
** https://indico.cern.ch/event/776832/
** [http://wlcg-sam.cern.ch/reports/2017/201710/wlcg/WLCG_All_Sites_ALICE_Oct2017.pdf ALICE].
+
* DIRAC downtime this week due to the move to Slough - good luck!
*** All okay.
+
* EGI Ops meeting this week.
** [http://wlcg-sam.cern.ch/reports/2017/201710/wlcg/WLCG_All_Sites_ATLAS_Oct2017.pdf ATLAS].
+
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
*** RHUL 86%:86%
+
** HTCondorCE commissioning ongoing, SRM decommissioning survey
** [http://wlcg-sam.cern.ch/reports/2017/201710/wlcg/WLCG_All_Sites_CMS_Oct2017.pdf CMS].
+
** State of SRM usage at DPM sites?
*** All okay.
+
** [http://wlcg-sam.cern.ch/reports/2017/201710/wlcg/WLCG_All_Sites_LHCB_Oct2017.pdf LHCb].
+
*** All okay.
+
  
  
'''Monday 6th November'''
+
'''Tuesday 11th June'''
* There was an [https://indico.egi.eu/indico/event/3243/ EGI OMB on Thursday 2nd November].
+
* There is a [https://indico.cern.ch/event/578992/ GDB tomorrow] covering among other things: HEPiX update; LHCONE/LHCOPN updates; authorisation working group developments; Data preservation VO and approaches to machine learning on the Grid.
+
* The [https://indico.cern.ch/event/578976/ pre-GDB this month] is today and focusses on authorisation working group activities.
+
* [http://wlcg-sam.cern.ch/reports/2017/201710/wlcg/ Draft October A/R reports] for WLCG are available.
+
* TB-SUPPORT topics:
+
** Steve J: VOMS rpm repo
+
  
 +
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
 +
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 +
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 +
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
 +
<!-- ***********************Start General text*********************** ----->'''
 +
'''Tuesday 4th June 2019'''
 +
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
 +
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
 +
* iris.ac.uk VO - Andrew explained this.
 +
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
 +
* Gareth's query about the WS interface to ARC on TB-SUPPORT
 +
* Anything else?
  
'''Monday 30th October'''
 
* Input for WLCG monthly ops [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes171102#Review_EL7_migration_plans coordination meeting].
 
* And the [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek171030#Monday latest weekly update].
 
* EGI related items:
 
** led NGI/site transition plans to IPv6 - survey.
 
** EGI Storage Accounting: [http://accounting-devel.egi.eu/storage.php Check results] | [https://wiki.egi.eu/wiki/APEL/Storage enabling instructions]. Deadline was today and tickets will arrive soon.
 
** new way for computing the weights for the NGIs average A/R values: computation power | [http://operations-portal.egi.eu/vapor/resources/GL2ResSummary summary].
 
** NGIs average A/R values calculation.
 
* WLCG reminder
 
** The vast majority of Tier-2 sites to provide dual-stack access to their storage resources by the end of Run2 (end of 2018).
 
* TB-SUPPORT communications
 
** Alessandra mentioned an [https://indico.cern.ch/event/675478/ Information system TF meeting last week].
 
* Computing Insight UK 2017 early bird [https://eventbooking.stfc.ac.uk/news-events/ciuk-2017 registration] closes on Tuesday. This year the theme is "Joining Up the UK e-Infrastructure”.
 
  
  
Line 78: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 7th November'''
+
'''Tuesday 11th June'''
* The WLCG ops coordination meeting last week ([https://indico.cern.ch/event/677078/ agenda] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes171102 minutes] had as highlights the topics:  
+
 
** Security Operations Center WG Workshop/Hackathon
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
** Review of EL7 migration plans
+
 
** Providing reliable storage: presentation by BNL
+
'''Tuesday 14th May'''
+
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
  
'''Monday 23rd October'''
 
* The next WLCG ops coordination meeting will be on 2nd November.
 
  
'''Tuesday 10th October'''
 
* There was an ops coordination meeting last Thursday 5th October: [https://indico.cern.ch/event/670207/ Agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes171005 Minutes].
 
** There is one action for us to follow-up: "Collect plans from sites to move to EL7". We could make use of the [https://www.gridpp.ac.uk/wiki/Batch_system_status Batch Systems] table.
 
  
  
Line 108: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 14th October'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2017-11-08 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There was a problem with CMS Castor service on Tuesday 7th Nov. after one of the "headnodes" failed and had to be replaced. CMS Castor was unavilable for around ten hours.
+
<!-- *********************************************************** ----->
* Castor will be unavailable for a few hours on Tuesday 14th Nov for patching of the nodes.
+
* The LHCb Castor SRMs will be unavailable for a while on Wednesday 15th Nov. The Castor SRM version will be updated.
+
* The "Test" FTS service (used by Atlas) has been enabled for IPv6 (i.e. dual stack enabled). The Production FTS will also have teh dual stack enabled next week.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 129: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20171115-minutes.txt Wed 15 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* More xcache progress at some sites; less at others who may be blocking on dependencies or be busy with Other Things(tm)
+
* DOME upgrade problems at Edinburgh
* Some interest in following the non-X.509 authentication/authorisation
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20171108-minutes.txt Wed 08 Nov]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Not (very) modest at all progress on xcache testing... from Chris at RALPP
+
* Rucio reporting
  
'''[http://storage.esc.rl.ac.uk/weekly/20171101-minutes.txt Wed 01 Nov]'''
+
'''Wed 16 Oct'''
* (very) modest progress on xcache testing...
+
* CEPH workshop at CERN report
* Except that RALPP has it fully working for dCache - hope to get full report next week
+
  
'''Tuesday 3rd October'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* Looking for small DPM ATLAS site to possibly test xrootd caching
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Tracking upgrade of SEs to new what will be new baseline versions. (dCache sites updated; 6/14 DPM up-to-date)
+
* Roadmap for xroot and http TPC for RAL FTS(es)
* Alastair D. to give T2 site storage evolution talk 4/10/17 at gridpp-storage meeting
+
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 160: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 14 Nov'''
+
'''Tuesday 30 Apr 2019'''
* Single processor LHCb stoppable Monte Carlo VMs running in a mixture with fixed length 8 processor ATLAS VMs and single processor GridPP VMs. Please get in touch if you are running Vac and want to try this.
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 
+
'''Tuesday 3 Oct'''
+
* Productions tests of Vac 03.00pre at Manchester.
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 181: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
 +
 +
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
  
 
'''Tuesday 24th Oct'''
 
'''Tuesday 24th Oct'''
Line 212: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tuesday 14th Nov 2017'''
+
''' Tue 9th July 2019'''
  
A significant change to VOMS records has been detected, and this may result in the release of a new Approved VOs document (to be announced). The change results from the apparent sudden retirement of all CNAF voms servers, which may or may not be "real". I'll check (sjones). The change concerns three VOs: ipv6.hepix.org, planck and enmr.eu. Sites supporting those VOs should check TB_SUPPORT over coming days to see if the changes are real.
+
LHCb has added this to their requirements:
  
'''Tuesday 26th Sept 2017'''
+
Sites not having an SRM installation must provide:
* Safari on macOS autogenerated client certificates fix put into production last week.
+
  
'''Tuesday 19th Sept 2017'''
+
* disk only storage
* Bug in Safari on macOS causes random Apple generated client cert to be presented to www.gridpp.ac.uk using a CA we don't know about. The connection is then rejected by Apache. Other browsers ok since we request but do not require that they supply a certificate. Workaround produced by (a) installing the Apple CA root and intermediary CA and (b) whitelisting UK e-Science DNs (+ CERN? Others?) in the HTTPS Wiki plugin. Tested but not yet in production.
+
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
  
'''Tuesday 5th Sept 2017'''
+
''' Tue 16th April 2019'''
  
New Approved VO. SKA European regional data centre, skatelescope.eu
+
Minor change to LHCB requirements in Approved VOs:
  
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 +
'''Tue 2nd April 2019'''
 +
 +
Changes to Approved for DUNE (and LZ)
 +
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
 +
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 +
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 +
Ste
 +
 +
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
This VO is ramping up and has requested support. Andrew McNab is the contact person for GridPP.
+
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
 
  
 
'''General note'''
 
'''General note'''
Line 246: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 9th October'''
 
* There was an EGO Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-09-10-2017 Agenda][https://indico.egi.eu/indico/event/3353/material/minutes/minutes.html Minutes]
 
  
* MW
+
''' 14 May 2019 '''
** UMD 4.6 in November
+
* Meeting for May cancelled. Next meeting is on 10th June.
*** UI, CREAM, ARGUS
+
 
*** If not before in 4.5.1
+
''' Monday 11th March '''
** UMD Preview update on 22/9
+
 
*** not rooted 4.7.0 has a bug, wait for update
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
*** CREAM version in Preview, please test if applicable (leading to release as noted above)
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 
 +
 
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.  
 +
 
 +
 
 +
''' Friday 1st February '''
 +
 
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
  
* Ops
+
'
** cASO (OpenStack Accounting extractor) update: 100%IT done (GGUS ticket 130665)
+
** A/R nothing to report
+
** Computation Power
+
*** Sites check data by end of the month
+
** EMI WMS
+
*** mice noted as being enabled on DIRAC
+
** IPv6 Readiness
+
*** Would be useful for us to provide a report
+
** webdav probes
+
*** If you're advertising a webdav endpoint, make sure it's in the GOC DB
+
** Storage accounting deployment
+
*** Enable by 30th October; tickets to follow. Note that per broadcast new data currently not showing, please ticket on errors in logs only
+
  
* Next meeting 13th November [https://indico.egi.eu/indico/event/3354/ Meeting link]
 
  
'''Tuesday 29th August'''
 
* There was an EGI Ops meeting last Monday. [https://wiki.egi.eu/wiki/Agenda-21-08-2017 Agenda]
 
* UMD 4.5 is out with CentOS 7 WN package (see broadcast)
 
* NGI_UK QoS ticket mentioned in agenda but not in meeting  [https://ggus.eu/index.php?mode=ticket_info&ticket_id=129964 QoS ticket]
 
* Proposal: WMS will be removed from production starting from 1st January 2018
 
* NGIs/ROCs please start discussing with sites and provide suggestions for the overall plan for IPv6
 
* WebDAV reporting: The Operations Centres are asked to verify with their sites if the webdav protocol is really (intentional) enabled on their storage elements (if not, the information should be removed from the BDII), and report to EGI Operations
 
* Next meeting 11th September https://indico.egi.eu/indico/event/3352/
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 324: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 23rd October'''
+
'''Tuesday 5th February'''
* Generally quiet. RHUL affected by some transient issues. ECDF triggered low availability alarm a few weeks ago and still has time to go before it clears.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 +
 
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
 +
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 338: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th February'''
+
'''Monday 20th November'''
* Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
* Does anyone want specific questions in this area tackled in a roundtable discussion?
+
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
  
'''Tuesday 7th December'''
 
* Raul reports:  validation of site BDII on Centos 7 done.
 
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
 
+
'''Historical References'''
'''References'''
+
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 373: Line 447:
  
 
===== =====
 
===== =====
'''Monday 30th October'''
+
'''Tuesday 11th June
* EGI SVG ALERT [TLP:WHITE] Up to 'CRITICAL' risk, kernel exploit CVE-2017-7184 and others [EGI-SVG-CVE-2017-7184]
+
* <i>Upcoming meetings </i>
+
** Details and registration for SOC WG Workshop in December: [https://wlcg-soc-wg.web.cern.ch/content/workshop-cern-11th-12th-december-2017 Advert] [https://indico.cern.ch/event/676160/ Indico]
+
 
+
'''Monday 23rd October'''
+
* Nothing to report
+
 
+
'''Tuesday 10th October'''
+
* ...
+
 
+
 
+
'''Tuesday 3rd October'''
+
* EGI SVG ADVISORY [TLP:WHITE] 'HIGH' risk Linux kernel local root vulnerability CVE-2017-1000253
+
  
* <i>Upcoming meetings</i>
+
* NTR
** This afternoon at 3pm, Traceability and Isolation working group meeting: https://indico.cern.ch/event/667685/
+
** October 11th, Authz: https://indico.cern.ch/event/670330/
+
** November 7th: Authz pre-GDB
+
** December 11th/12th: SOC WG Workshop/pre-GDB (details to be confirmed)
+
  
 
|}
 
|}
Line 405: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar development dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 413: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Monday 23rd October'''
+
'''Monday 5th March'''
* The LHCOPN/ONE meeting took place last week at KEK, co-hosted with the HEPiX Fall meeting.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.  
** You can find a short report of the meeting [https://indico.cern.ch/event/646629/attachments/1544349/2423256/LHCOPNE-20171017-Tsukuba-meeting-report.pdf here.]
+
** All the slides presented are available in the [https://indico.cern.ch/event/646629/ agenda.]
+
  
'''Tuesday 4th July'''
+
'''Monday 10th September'''
* Pete C is preparing another networking forward look document. Note that figures presented in the Manchester workshop were for a Tier-2 (not always a single site).
+
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
  
[http://www.perfsonar.net/release-notes/version-4-0/ here]
+
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
 +
 
 +
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
  
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
Line 438: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th November 2017, 16.00 GMT'''<br />
 
37 Open UK Tickets this week, but 13 of them are Ipv6 tickets.
 
 
'''IPv6 Tickets'''<br />
 
Of these tickets 3 of them are still not acknowledged yet - Manchester, ECDF and Sussex. I set the UCL ticket in progress.
 
  
'''Liverpool'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=131677 131677] (7/11)<br />
+
This Ops ticket against one of the Liverpool CEs seems to have slipped under the radar. Assigned (7/11) ''Updated and solved''
+
  
'''Tier 1'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=130207 130207] (24/8)<br />
 
This MICE storage ticket could do with an update from the Tier 1's perspective, even if it's "still waiting on some free disks to show up". On Hold (25/10) ''Updated, with an explanation of what's happening.''
 
 
[https://ggus.eu/?mode=ticket_info&ticket_id=124876 124876] (7/11/16)<br />
 
I cheekily tacked an update onto this ECHO Ops test failure ticket, to note how the linked issue had been poked by Alastair. On hold (13/11)
 
 
'''Oxford'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=129931 129931] (4/8)<br />
 
This Oxford http ticket could do with any update, even if it's a vacuous "haven't got round to upgrading yet" one. On hold (19/9) ''Updated -thanks!''
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 471: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 +
 
'''Tuesday 18th July'''
 
'''Tuesday 18th July'''
 
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 
 
''' 29th November 2016 '''
 
 
LSST monitoring is available through vo-nagios
 
 
https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail 
 
 
''' 13th September 2016 '''
 
 
* New wiki page has been created for ARGO Nagios https://www.gridpp.ac.uk/wiki/ARGO_Nagios_Monitoring. I will add some more information to it later.
 
* Removed old wiki links about sam nagios from gridpp wiki page.
 
* VO nagios still exist and working. I have opened a ticket to explore ARGO VO Nagios,  https://ggus.eu/index.php?mode=ticket_info&ticket_id=123604
 
  
  
Line 502: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 +
  
 
* Impact
 
* Impact

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A