Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(1,055 intermediate revisions by 19 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 17th July 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
* [http://operations-portal.egi.eu/vapor_dev new VAPOR release (2.3)] ready for testing. Report issues via [https://ggus.eu/index.php?mode=ticket_info&ticket_id=129391 GGUS 129391].
 
  
'''Tuesday 17th July'''
+
'''Tuesday 11th June'''
* There was a pre-GDB on singularity https://indico.cern.ch/event/578972/
+
* There was a [https://indico.cern.ch/event/578988/ GDB] on various topic.
+
* Notes from Monday's WLCG operations call are available [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170717#Monday here].
+
* EGI held an [https://wiki.egi.eu/wiki/Agenda-17-07-2017 ops meeting] yesterday.
+
* TB-SUPPORT topics
+
** Memory per core at https://www.gridpp.ac.uk/wiki/HEPSPEC06
+
** Networking forward look - a reminder that Pete C is awaiting feedback from all sites.
+
* Check on enabling LSST (not all sites were used in recent campaign).
+
  
 
+
* Technical Meeting last week about the New JSON based Information System: https://indico.cern.ch/event/821105/
'''Monday 10th July'''
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* The EGI RP/RC A/R Report for June 2017 is available on the following [http://argo.egi.eu/lavoisier/ngi_reports?month=2017-06&accept=html link].
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
** A draft document linking to the report has been [https://documents.egi.eu/document/3162 published].
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
** The link can also be found via the [https://wiki.egi.eu/wiki/Resource_Centres_OLA_and_Resource_infrastructure_Provider_OLA_reports OLA reports page].
+
<!-- ***********************Start General text*********************** ----->'''
* GPU queues. We had a query on GridPP-Support about sites providing these queues and how to use them. Help requested.
+
'''Tuesday 4th June 2019'''
'''Monday 3rd July'''
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* July 2017 GDB and pre-GDB. [https://indico.cern.ch/event/578988/ Draft agenda available]. Container technologies [https://indico.cern.ch/event/578972/ working group pre-GDB] contact Gavin McCance to get involved.
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* Winnie: Do sites need lcg-CA installed?
+
* iris.ac.uk VO - Andrew explained this.
* EGI: Usage of ops VO. Is anyone still using it for UK tests?
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
* June T2 reports:
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_ALICE_Jun2017.pdf ALICE]
+
* Anything else?
*** All okay.
+
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_ATLAS_Jun2017.pdf ATLAS]
+
*** Lancaster: 84%:85%
+
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_CMS_Jun2017.pdf CMS]
+
*** All okay
+
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_LHCB_Jun2017.pdf LHCb]
+
*** Lancaster: 83%:84%
+
*** Oxford: 70%:100%
+
* The [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170703#Monday agenda] of the WLCG ops meeting held on Monday is available.
+
 
+
 
+
 
+
'''Monday 26th June'''
+
* GOCDB has received a new service type request for: ‘eu.egi.storage.accounting’: - authorising the site/SE to publish the storage accounting data - making the site/SE appear in the portal - monitoring that the accounting data are regularly published.
+
* The registration to the next LHCOPN/LHCONE meeting is now open. LHCONE meeting agenda: https://indico.cern.ch/event/646629/.
+
* HEPiX Fall 2017 meeting will be held at KEK, Tsukuba, Japan, from 16th to 20th October. HEPiX registration page: http://hepix-fall-2017.kek.jp/registration.html.
+
* Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
+
* EGI: new nagios probes appdbsync and OCCI-Categories for testing cloud services
+
* Dan: cvmfs versions. It seems others are running 2.3 and 2.4 versions.
+
* LSST: submission from panda is now working at Lancs, Manc and RAL. The plan (only sketched for now) is to run a data challenge. GridPP is behind this and said we should give a high priority to this effort. At the moment the initial plan is to use 16,000 cores for a month. This is a significant chunk of resources and will require organisation and much testing to get it running smoothly. Though using panda LSST doesn't have all the resubmission features ATLAS has, they also use the storage tools slightly differently privileging xrootd which is not as well supported as gridftp.
+
  
  
Line 90: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 18th July'''
+
'''Tuesday 11th June'''
* The next WLCG ops coordination meeting is planned for September 14th 2017.
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
  
'''Tuesday 11th July'''
 
* [https://indico.cern.ch/event/651433/ Agenda] from Thursday's WLCG ops coordination meeting.
 
  
'''Tuesday 4th July'''
 
* There will be a WLCG ops coordination meeting this week on Thursday at 14:30 BST. [https://indico.cern.ch/event/651433/ Agenda]. The theme is 'providing reliable storage'. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes170703 Minutes] will be available.
 
  
  
Line 115: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 25th July'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2017-07-19 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* The SOAP interface to the FTS3 service has been stopped on Monday 17th July. This will allow us to update FTS3 to the latest version.
+
<!-- *********************************************************** ----->
* Castor unavailable during morning of 25th July for OS patching.
+
* EGI have announced withdrawal of support for the WMS at the end of 2017 (as announced elsewhere).
+
* A test Centos7 queue has been enabled on one of our CEs.
+
* A test gateway to Echo ceph-test-gw691.gridpp.rl.ac.uk) has been made dual stack and test transfers have been shown to work over IPv6 to/from CERN.
+
* Data is flowing from the Dirac Leicester site - reaching a peak transfer rate of around 1Gbit/sec.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 138: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20170719-minutes.txt Wednesday 19 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Discussion of potential topics for data pre-GDB in September, without being able to commit yet
+
* DOME upgrade problems at Edinburgh
* Switching to fortnighly calls over the rest of July + August
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20170712-minutes.txt Wednesday 12 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Lots of loose ends including Matt's IPv6 testing
+
* Rucio reporting
  
'''[http://storage.esc.rl.ac.uk/weekly/20170705-minutes.txt Wednesday 05 July]'''
+
'''Wed 16 Oct'''
* Continuing the WLCG workshop follow up, specifically looking at accounting and inforamtion publishing.
+
* CEPH workshop at CERN report
* On a related note, started looking at Swordfish again, more closely.  Also provides REST-JSON API.  Maybe we can do something Interesting(tm).
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20170628-minutes.txt Wednesday 28 June]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
* Lots of good blog posts!
+
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
* Lots of good presentations and discussions at both [http://hepwww.rl.ac.uk/SYSMAN/June2017/main.html hepsysman] and the [https://indico.cern.ch/event/609911/ WLCG workshop]. Even if we didn't finish all the things...
+
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 168: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 24 Jul'''
+
'''Tuesday 30 Apr 2019'''
* RHUL Vac site in production for LHCb and GridPP with Vac-in-a-Box.
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested  
* Some problems with Vac-in-a-Box installation being worked on (how early the firewall holes are added.)
+
* GridPP DIRAC and ATLAS jobs running at Cambridge Vac site.
+
* Problem with multiprocessor accounting and APEL identified but seems to only affect Glasgow significantly. Fixed in Vac 02.00.01 release.
+
 
+
'''Tuesday 11 Jul'''
+
* Cambridge Vac site now in production for LHCb. ATLAS and GridPP being set up.
+
 
+
'''Tuesday 4 Jul'''
+
* Cambridge Vac site set up and being tested for LHCb.
+
* GridPP DIRAC VMs using Pilot 3.0 now running at UCL, Imperial, Liverpool, Manchester, Glasgow, Oxford.
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 196: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
 +
 +
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 +
 
'''Monday 16th January'''
 
'''Monday 16th January'''
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
Line 221: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 25th July'''
 
  
London grid (vo.londongrid.ac.uk) VO removed from Approved VOs.
+
''' Tue 9th July 2019'''
  
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
+
LHCb has added this to their requirements:
  
 +
Sites not having an SRM installation must provide:
  
'''Tuesday 4th July'''
+
* disk only storage
* A round of reminders is coming!
+
* a GRIDFPT endpoint (a single dns entry)
* Need to ensure decisions captured regarding supported other VOs.
+
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
  
'''Tue 23rd May'''
+
''' Tue 16th April 2019'''
As part of the process of moving everything to Centos7 (or some other form of RHEL7), I've written up how we build nodes at Liverpool for our ARC/Condor system.
+
  
https://www.gridpp.ac.uk/wiki/Centos7_Adoption
+
Minor change to LHCB requirements in Approved VOs:
  
I hope it's also a decent cheatsheet for Puppet3/Hiera. It's a draft, and I need to put in some more details, but it should be usable.
+
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
  
'''Tue 7th Mar'''
+
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
  
I want to get rid of following stale docs...
+
'''Tue 2nd April 2019'''
  
* Ten Easy Network Questions
+
Changes to Approved for DUNE (and LZ)
* GridPP Answers to 10 Easy Network Questions
+
* SL5 status
+
* Glasgow Middleware Operations Logbook
+
* London Tier2 Shares
+
* 23rd June 2010 Special Topic: NGS Technical Roadmap - Pete Gronbech
+
* SAM availability: Monthly summary table
+
* Transfer Tests Birmingham Endpoints
+
* EVO Tips and Tricks
+
* BaBar: bbrbsub270
+
  
'''Monday 13th Feb'''
+
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
* Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
+
* There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:
+
** - Resource Centre OLA https://documents.egi.eu/document/31
+
** - Resource Infrastructure Provider OLA https://documents.egi.eu/document/463
+
** - Corporate-level EGI OLA https://documents.egi.eu/document/2752
+
  
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''Monday 30th January'''
+
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
  
The fusion VO has been removed from GridPP Approved VOs.
+
Sites with DUNE services need to update using whatever method they employ.
  
'''Monday 9th January'''
+
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
  
* Tom put these together:
+
Ste
** A [http://dx.doi.org/10.5281/zenodo.222702  snapshot of the GridPP UserGuide] is now available as an offline document in the Zenodo repository:
+
** ...and the v1.0 release of the LaTeX code used to compile it is [http://doi.org/10.5281/zenodo.222755 here].
+
**  There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release [http://doi.org/10.5281/zenodo.222756 here].
+
  
  
''' Tue 22nd Nov '''
+
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
* More on Accounting audit tools
+
New VOMs rpms to match.
  
The process for ARC, Toque and VAC is now documented here.
+
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
https://github.com/gridpp/audit/wiki
 
  
  
Line 293: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 299: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 4th July'''
 
* There was an EGI OMB last Thursday. [https://indico.egi.eu/indico/event/3238/ Agenda].
 
* Membership of the ops VO is being reduced.
 
  
 +
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
  
'''Tuesday 16th May'''
+
''' Monday 11th March '''
* There was an EGI ops meeting yesterday. [https://indico.egi.eu/indico/event/3143/ Agenda].
+
  
'''Tuesday 2nd May'''
+
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
* The [https://indico.egi.eu/indico/event/3237/ next EGI ops Management Board] (OMB) is on 4th May.
+
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
'''Tuesday 21st March'''
 
* The [https://wiki.egi.eu/wiki/Agenda-13-03-2017 last meeting was on 13th March].
 
* Next meeting is on 10th April.
 
  
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 +
 +
''' Friday 1st February '''
 +
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
 +
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 +
* No UK specific issue mentioned.
 +
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 +
'
  
  
Line 359: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''6th June'''
+
'''Tuesday 5th February'''
* There are issues with the ARC CE tests again, so the ARC sites have not have any results in days and the corresponding availability tickets are going nowhere.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* New rota being compiled.
+
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 +
 
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
'''Tuesday 2nd May'''
 
* Generally quiet. A few low availability tickets.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 377: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th February'''
+
'''Monday 20th November'''
* Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
* Does anyone want specific questions in this area tackled in a roundtable discussion?
+
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 
+
'''Tuesday 7th December'''
+
* Raul reports: validation of site BDII on Centos 7 done.
+
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 412: Line 447:
  
 
===== =====
 
===== =====
'''Tuesday 18th July'''
+
'''Tuesday 11th June
* No advisories issued this week.
+
* GDB - WLCG Authz WG [https://indico.cern.ch/event/578988/contributions/2646082/attachments/1491770/2319458/20170712-GDB-WLCG-Auth-WG-Overview-v2.pdf .PDF] from [https://indico.cern.ch/event/578988/ GDB]
+
** Requirements and strategy to deal with federated identities, VO-centric user suspension, EU GDPR data protection
+
** Everyone welcome at [https://e-groups.cern.ch/e-groups/Egroup.do?egroupId=145146 egroup]
+
 
+
'''Tuesday 11th July'''
+
* EGI SVG Advisory [TLP:WHITE] 'HIGH' risk - Stack clash memory allocation vulnerability CVE-2017-1000364 [EGI-SVG-CVE-2017-1000364] [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-CVE-2017-1000364]
+
** Update from Heads-Up of 21-June-17 - remains as HIGH risk.
+
* pre-GDB on Containers (mostly Singularity) this afternoon [https://indico.cern.ch/event/578972/]
+
 
+
'''Tuesday 4th July'''
+
* No advisories issued this week.
+
* Expect an update for EGI-SVG-CVE-2017-1000364 - Stack Clash - likely to remain as HIGH risk
+
  
 +
* NTR
  
 
|}
 
|}
Line 439: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar development dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 447: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 4th July'''
+
'''Monday 5th March'''
* Pete C is preparing another networking forward look document. Note that figures presented in the Manchester workshop were for a Tier-2 (not always a single site).
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
  
'''Tuesday 6th June'''
+
'''Monday 19th February'''
* An update from the DIRAC workshop? GridPP is still the only true multi-VO instance, so we will continue to see issues with this.  release quality of dirac has improved within the past year. gfal2/EL7 problems seem to be coming to an end after being cooped up with all authors for 3 days on end. The Imperial GridPP module now has integrated testing. It was also noted that every dirac instance has it's own special module to adapt to their community on top of main dira. We are trying to push as much of out special functionality back into the main dirac branch.
+
  
'''Tuesday 25th April'''
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
* perfSONAR version 4 was released on 17th April. Sites with auto-update on should have been automatically upgraded. Note perfSONAR 4.0 requires more CPU than previous versions as a result of some of the increased functionality. Full details [http://www.perfsonar.net/release-notes/version-4-0/ here]
+
  
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
Line 471: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 24th July 2017, 15.30 BST'''<br />
 
29 Open UK Tickets this week.
 
  
'''QM SE having a spot of bother?'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=129692 129692] - LHCB<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129684 129684] - Atlas<br />
+
Two tickets submitted over the weekend suggest that the QM SE has keeled over. No reply to them at the time of writing, but when your SE dies answering tickets is the least of your worries.
+
  
'''TIER 1 Transfer problems'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=129573 129573] (16/7)<br />
 
Whilst on the subject of transfer errors, it looks like atlas are still seeing failures with the symptoms describe in this ticket. In progress (22/7)
 
 
'''Atlas Jobs at Sheffield'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=129054 129054] (19/6)<br />
 
Atlas multicore jobs seemingly being killed by the batch system at Sheffield. Elena narrowed the failures down to a single task, suggesting the jobs were doing something weird - which isn't the first time we've seen a dodgey batch of jobs recently. But following the panda link it looks like these errors are persisting. In progress (21/6)
 
 
'''GLASGOW - the cursed lhcb ticket.'''<br />
 
[https://ggus.eu/?mode=ticket_info&ticket_id=124052 124052] (25/9/2015)<br />
 
Vladimir replied today that the attempted fix didn't work for svr009. However he didn't answer any of the other questions. Perhaps talking to Raja or Andrew directly in the meeting tomorrow will help clear things up? In progress (24/7)
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
|}
 
|}
Line 503: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Monday 20th November'''
 +
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
 +
 
'''Tuesday 18th July'''
 
'''Tuesday 18th July'''
 
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
 
 
''' 29th November 2016 '''
 
 
LSST monitoring is available through vo-nagios
 
 
https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail 
 
 
''' 13th September 2016 '''
 
 
* New wiki page has been created for ARGO Nagios https://www.gridpp.ac.uk/wiki/ARGO_Nagios_Monitoring. I will add some more information to it later.
 
* Removed old wiki links about sam nagios from gridpp wiki page.
 
* VO nagios still exist and working. I have opened a ticket to explore ARGO VO Nagios,  https://ggus.eu/index.php?mode=ticket_info&ticket_id=123604
 
  
  
Line 534: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 +
  
 
* Impact
 
* Impact

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A