Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(1,091 intermediate revisions by 19 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 3rd July 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
* The EGI RP/RC A/R Report for June 2017 is available on the following link:
 
http://argo.egi.eu/lavoisier/ngi_reports?month=2017-06&accept=html
 
  
* A draft document linking to the report has been published here:
+
'''Tuesday 11th June'''
https://documents.egi.eu/document/3162
+
  
* The link can also be found via:  
+
* Technical Meeting last week about the New JSON based Information System: https://indico.cern.ch/event/821105/
https://wiki.egi.eu/wiki/Resource_Centres_OLA_and_Resource_infrastructure_Provider_OLA_reports
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
 
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
 
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
'''Monday 3rd July'''
+
<!-- ***********************Start General text*********************** ----->'''
* July 2017 GDB and pre-GDB. [https://indico.cern.ch/event/578988/ Draft agenda available]. Container technologies [https://indico.cern.ch/event/578972/ working group pre-GDB] contact Gavin McCance to get involved.
+
'''Tuesday 4th June 2019'''
* Winnie: Do sites need lcg-CA installed?
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* EGI: Usage of ops VO. Is anyone still using it for UK tests?
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* June T2 reports:
+
* iris.ac.uk VO - Andrew explained this.
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_ALICE_Jun2017.pdf ALICE]
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
*** All okay.
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_ATLAS_Jun2017.pdf ATLAS]
+
* Anything else?
*** Lancaster: 84%:85%
+
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_CMS_Jun2017.pdf CMS]
+
*** All okay
+
** [http://wlcg-sam.cern.ch/reports/2017/201706/wlcg/WLCG_All_Sites_LHCB_Jun2017.pdf LHCb]
+
*** Lancaster: 83%:84%
+
*** Oxford: 70%:100%
+
* The [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170703#Monday agenda] of the WLCG ops meeting held on Monday is available.
+
 
+
 
+
 
+
'''Monday 26th June'''
+
* GOCDB has received a new service type request for: ‘eu.egi.storage.accounting’: - authorising the site/SE to publish the storage accounting data - making the site/SE appear in the portal - monitoring that the accounting data are regularly published.
+
* The registration to the next LHCOPN/LHCONE meeting is now open. LHCONE meeting agenda: https://indico.cern.ch/event/646629/.
+
* HEPiX Fall 2017 meeting will be held at KEK, Tsukuba, Japan, from 16th to 20th October. HEPiX registration page: http://hepix-fall-2017.kek.jp/registration.html.
+
* Chris B: Gotcha when upgrading ArcCEs to htcondor 8.6
+
* EGI: new nagios probes appdbsync and OCCI-Categories for testing cloud services
+
* Dan: cvmfs versions. It seems others are running 2.3 and 2.4 versions.
+
* LSST: submission from panda is now working at Lancs, Manc and RAL. The plan (only sketched for now) is to run a data challenge. GridPP is behind this and said we should give a high priority to this effort. At the moment the initial plan is to use 16,000 cores for a month. This is a significant chunk of resources and will require organisation and much testing to get it running smoothly. Though using panda LSST doesn't have all the resubmission features ATLAS has, they also use the storage tools slightly differently privileging xrootd which is not as well supported as gridftp.
+
 
+
 
+
'''Monday 5th June'''
+
* Migration of the UI/WN tarball repositories.
+
* EGI [http://argo.egi.eu/lavoisier/ngi_reports?month=2017-05&accept=html RP/RC A/R Report] available. UK is fine but dropped in April.
+
* Tier-1 noted pool accounts for "quiet" VOs. The question, is it worth spending time getting the VO active:
+
** camont - no. This collaboration ended some years ago.
+
** cdf - no
+
** dzero -  no
+
** esr - no, but they might.
+
** magic - no, but they might
+
** neiss - no
+
** supernemo - They will be soon. Discussions started.
+
* Winnie: Pool account UIDs/GIDs. Looks like it is best to work towards having consistent pool accounts.
+
* lusc-gridpp mailing list for LSST now created. A while back Alessandra also set up a [https://www.gridpp.ac.uk/wiki/LSST_UK wiki page for LSST].
+
* Alastair: Site feedback for network session at WLCG workshop.
+
* The EMI repositories will be shut down on the 15th of June 2017. You should be on the [https://wiki.egi.eu/wiki/Preview_Repository preview repo] now. [https://appdb.egi.eu/store/software/third.party.distribution h Third party repo is here].  
+
* 29th May: EGI Trust Anchor release 1.83-1.
+
* Two WLCG ops meeting reports to review: [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170529 29th May] and [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170605 5th June].
+
  
  
Line 101: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 4th July'''
+
'''Tuesday 11th June'''
* There will be a WLCG ops coordination meeting this week on Thursday at 14:30 BST. [https://indico.cern.ch/event/651433/ Agenda]. The theme is 'providing reliable storage'. [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes170703 Minutes] will be available.
+
 
 +
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
  
  
'''Monday 5th June'''
 
* The next meeting in this series is 6th July (i.e. after the workshop).
 
  
'''Monday 22nd May'''
 
* WLCG ops coordination took place last Thursday with a theme of "providing reliable storage" : [https://indico.cern.ch/event/639351/ Agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes170518 Minutes].
 
  
  
Line 128: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 4th July'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2017-06-28 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There are still some issues for CMS access to Castor - these can be seen in timeouts affecting the CMS SRM SAM tests.
+
<!-- *********************************************************** ----->
* The new version of FTS3 installed on our "test" FTS service (used by Atlas) no longer supports the SOAP API. There are still some access to our "production" FTS3 service via this API (mainly SNO+ and MICE). We will wish to upgrade the production FTS3 service - and need VOs to move to the rest API provided with the newer versions of FTS. Would will set deadline when we upgrade the "production" instance and hence no longer support the SOAP API.
+
* The OPN link to CERN was upgraded to 3 * 10Gbit last Wednesday (28th June).
+
* EGI have announced withdrawal of support for the WMS at the end of 2017 (as announced elsewhere).
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 149: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20170705-minutes.txt Wednesday 05 July]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Continuing the WLCG workshop follow up, specifically looking at accounting and inforamtion publishing.
+
* DOME upgrade problems at Edinburgh
* On a related note, started looking at Swordfish again, more closely. Also provides REST-JSON API. Maybe we can do something Interesting(tm).
+
* Data management support/development for IRIS users
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
 +
* Rucio reporting
 +
 
 +
'''Wed 16 Oct'''
 +
* CEPH workshop at CERN report
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
  
'''[http://storage.esc.rl.ac.uk/weekly/20170628-minutes.txt Wednesday 28 June]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
* Lots of good blog posts!
+
* Report from yesterday's Rucio Face Meeting at Coseners
* Lots of good presentations and discussions at both [http://hepwww.rl.ac.uk/SYSMAN/June2017/main.html hepsysman] and the [https://indico.cern.ch/event/609911/ WLCG workshop].  Even if we didn't finish all the things...
+
* Suggestions for following up from yesterday's CEPH day hosted by CERN
  
'''[http://storage.esc.rl.ac.uk/weekly/20170517-minutes.txt Wednesday 17 May]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
* Lots of opportunities to contribute to WLCG workshop (if we could finish all the stuff we've got cooking)
+
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
  
'''[http://storage.esc.rl.ac.uk/weekly/20170419-minutes.txt Wednesday 19 Apr]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
* Case for (re)testing CVMFS for T2s? (and non-LHC VOs?)
+
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
* Other storage related issues arising from use of containers?
+
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
  
Line 179: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 4 Jul'''
+
'''Tuesday 30 Apr 2019'''
* Cambridge Vac site set up and being tested for LHCb. ATLAS and GridPP to follow.
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
* GridPP DIRAC VMs using Pilot 3.0 now running at UCL, Imperial, Liverpool, Manchester, Glasgow, Oxford.
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 198: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
 +
 +
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 +
 
'''Monday 16th January'''
 
'''Monday 16th January'''
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
Line 223: Line 235:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 4th July'''
 
* A round of reminders is coming!
 
* Need to ensure decisions captured regarding supported other VOs.
 
  
'''Tue 23rd May'''
+
''' Tue 9th July 2019'''
As part of the process of moving everything to Centos7 (or some other form of RHEL7), I've written up how we build nodes at Liverpool for our ARC/Condor system.  
+
 
 +
LHCb has added this to their requirements:
 +
 
 +
Sites not having an SRM installation must provide:
 +
 
 +
* disk only storage
 +
* a GRIDFPT endpoint (a single dns entry)
 +
* an XROOT endpoint (a single dns entry)
 +
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
 +
 
 +
''' Tue 16th April 2019'''
 +
 
 +
Minor change to LHCB requirements in Approved VOs:
 +
 
 +
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.
 +
 
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
 +
 
 +
'''Tue 2nd April 2019'''
 +
 
 +
Changes to Approved for DUNE (and LZ)
 +
 
 +
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
  
https://www.gridpp.ac.uk/wiki/Centos7_Adoption
+
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
I hope it's also a decent cheatsheet for Puppet3/Hiera. It's a draft, and I need to put in some more details, but it should be usable.
+
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
  
'''Tue 7th Mar'''
+
Sites with DUNE services need to update using whatever method they employ.
  
I want to get rid of following stale docs...
+
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
  
* Ten Easy Network Questions
+
Ste
* GridPP Answers to 10 Easy Network Questions
+
* SL5 status
+
* Glasgow Middleware Operations Logbook
+
* London Tier2 Shares
+
* 23rd June 2010 Special Topic: NGS Technical Roadmap - Pete Gronbech
+
* SAM availability: Monthly summary table
+
* Transfer Tests Birmingham Endpoints
+
* EVO Tips and Tricks
+
* BaBar: bbrbsub270
+
  
'''Monday 13th Feb'''
 
* Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
 
* There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:
 
** - Resource Centre OLA https://documents.egi.eu/document/31
 
** - Resource Infrastructure Provider OLA https://documents.egi.eu/document/463
 
** - Corporate-level EGI OLA https://documents.egi.eu/document/2752
 
  
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
'''Monday 30th January'''
+
New VOMs rpms to match.
  
The fusion VO has been removed from GridPP Approved VOs.
+
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
  
'''Monday 9th January'''
+
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
  
* Tom put these together:
 
** A [http://dx.doi.org/10.5281/zenodo.222702  snapshot of the GridPP UserGuide] is now available as an offline document in the Zenodo repository:
 
** ...and the v1.0 release of the LaTeX code used to compile it is [http://doi.org/10.5281/zenodo.222755 here].
 
**  There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release [http://doi.org/10.5281/zenodo.222756 here].
 
  
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
  
''' Tue 22nd Nov '''
+
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
  
* More on Accounting audit tools
+
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
  
The process for ARC, Toque and VAC is now documented here.
+
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
https://github.com/gridpp/audit/wiki
 
  
  
Line 288: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 294: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 4th July'''
 
* There was an EGI OMB last Thursday. [https://indico.egi.eu/indico/event/3237/ Agenda].
 
* Membership of the ops VO is being reduced.
 
  
 +
''' 14 May 2019 '''
 +
* Meeting for May cancelled. Next meeting is on 10th June.
 +
 +
''' Monday 11th March '''
 +
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
 +
 +
 +
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
 +
 +
 +
''' Friday 1st February '''
 +
 +
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
 +
 +
''' Thursday 17th January EGI OMB meeting '''
 +
 +
* CREAMCE to be out of support by Dec 2020
 +
* More effort to fix accounting issue of HTCondor CE
  
'''Tuesday 16th May'''
+
''' Monday 14th January 2019 '''
* There was an EGI ops meeting yesterday. [https://indico.egi.eu/indico/event/3143/ Agenda].
+
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
  
'''Tuesday 2nd May'''
+
* No UK specific issue mentioned.
* The [https://indico.egi.eu/indico/event/3237/ next EGI ops Management Board] (OMB) is on 4th May.
+
  
'''Tuesday 21st March'''
+
* IPv6 readiness plan is going to be summarized at OMB.
* The [https://wiki.egi.eu/wiki/Agenda-13-03-2017 last meeting was on 13th March].
+
* Next meeting is on 10th April.
+
  
 +
'
  
  
Line 354: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''6th June'''
+
'''Tuesday 5th February'''
* There are issues with the ARC CE tests again, so the ARC sites have not have any results in days and the corresponding availability tickets are going nowhere.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
* New rota being compiled.
+
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
 +
 
 +
'''Tuesday 14th August'''
 +
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
  
'''Tuesday 2nd May'''
 
* Generally quiet. A few low availability tickets.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 372: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th February'''
+
'''Monday 20th November'''
* Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
* Does anyone want specific questions in this area tackled in a roundtable discussion?
+
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 
+
'''Tuesday 7th December'''
+
* Raul reports: validation of site BDII on Centos 7 done.
+
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 407: Line 447:
  
 
===== =====
 
===== =====
'''Tuesday 4th July'''
+
'''Tuesday 11th June
* No advisories issued this week.
+
* Expect an update for EGI-SVG-CVE-2017-1000364 - Stack Clash - likely to remain as HIGH risk
+
 
+
'''Monday 26th June'''
+
* Updated IGTF distribution 1.84 certificate authorities [https://dist.igtf.net/distribution/igtf/current/]
+
* EGI CSIRT Heads-Up [TLP:AMBER] security incident reported from one site concerning compromised VM in EGI Fed Cloud
+
* EGI SVG Heads-Up [TLP:WHITE] Stack clash memory allocation vulnerability CVE-2017-1000364 [EGI-SVG-CVE-2017-1000364] [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-CVE-2017-1000364]
+
* EGI SVG Advisory [TLP:WHITE] 'Moderate' risk - sudo local root vulnerability CVE-2017-1000367 [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-CVE-2017-1000367]
+
* EGI SVG Advisory [TLP:WHITE] 'HIGH' risk NSS out of bounds write flaw CVE-2017-5461[https://wiki.egi.eu/wiki/SVG:Advisory-SVG-CVE-2017-5461]
+
 
+
'''Tuesday 6th June'''
+
* EGI SVG Advisory [TLP:WHITE] up to 'HIGH' risk Qemu and Xen guest escape issues CVE-2016-9603 and others [EGI-SVG-CVE-2016-9603] [https://wiki.egi.eu/wiki/SVG:Advisory-SVG-CVE-2016-9603]
+
* 'HEADS-UP' on the escalation of privilege vulnerability in Intel AMT [EGI-SVG-CVE-2017-5689].
+
  
 +
* NTR
  
 
|}
 
|}
Line 434: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar development dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 442: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Tuesday 4th July'''
+
'''Monday 5th March'''
* Pete C is preparing another networking forward look document. Note that figures presented in the Manchester workshop were for a Tier-2 (not always a single site).
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
 +
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
  
'''Tuesday 6th June'''
+
'''Monday 19th February'''
* An update from the DIRAC workshop? GridPP is still the only true multi-VO instance, so we will continue to see issues with this.  release quality of dirac has improved within the past year. gfal2/EL7 problems seem to be coming to an end after being cooped up with all authors for 3 days on end. The Imperial GridPP module now has integrated testing. It was also noted that every dirac instance has it's own special module to adapt to their community on top of main dira. We are trying to push as much of out special functionality back into the main dirac branch.
+
  
'''Tuesday 25th April'''
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
* perfSONAR version 4 was released on 17th April. Sites with auto-update on should have been automatically upgraded. Note perfSONAR 4.0 requires more CPU than previous versions as a result of some of the increased functionality. Full details [http://www.perfsonar.net/release-notes/version-4-0/ here]
+
  
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
Line 466: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 3rd July 15.00 BST'''<br />
 
36 Open UK Tickets this month.
 
  
'''SUSSEX'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=122772 122772] (11/7/16)<br />
+
Start with a golden oldie, the Sussex webdav/xrootd ticket. No news since some promising progress a few months back. As Alessandra asks in the ticket, any news on this? In progress (9/5)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=127767 127767] (18/4)<br />
+
An availability ticket, hopefully the stats will be green enough to close this in a week or two. On hold (26/6)
+
 
+
'''RALPP'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129312 129312] (3/7)<br />
+
Fresh this morning, an lhcb ticket about one of the ARC CEs not responding (heplnv147). Assigned (3/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129316 129316] (3/7)<br />
+
A ROD ticket about the same server. My powers of deduction suggest that it's a bit poorly. Assigned (3/7)
+
 
+
'''OXFORD'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129201 129201] (27/6)<br />
+
A glue2 ROD ticket. Kashif sees an intermittent failure and had no joy debugging it so will close the ticket shortly. In progress (29/6)
+
 
+
'''CAMBRIDGE'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129187 129187] (26/6)<br />
+
One of the "check your storage accounting" tickets, just waiting on word back from JG to try out a new gocdb related to this. Waiting for reply (28/6)
+
 
+
'''BRISTOL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=126864 126864] (28/2)<br />
+
Enabling LZ (and friends) and Bristol. Things are coming along nicely, and after giving helpful advice about glexec Daniela is primed to send test jobs. In progress (15/6) ''Update, Winnie has got back reporting that LZ, Dune and LSST are ready for testing. Sweet!''
+
 
+
'''GLASGOW'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=124052 124052] (25/9/16)<br />
+
LHCB ticket regarding publishing ARC at Glasgow (aka the Cursed Ticket). Gareth has updated the ticket with two prongs of hope - one is that a CE at Glasgow has been updated to a version of ARC with the hopeful fix in it, and the other is that VAC use by LHCB at Glasgow could make the issue moot. Both need feedback to confirm. Waiting for reply (30/6)
+
 
+
'''EDINBURGH'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129185 129185] (25/6)<br />
+
The ECDF edition of the storage accounting tickets. Waiting on Andy's return from hols to confirm the figures. In progress (26/6)
+
 
+
'''SHEFFIELD'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129230 129230] (28/6)<br />
+
Atlas transfers failing with time outs - Elena noted a rogue disk server and hopefully has kicked it into shape soon. In progress (3/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129054 129054] (19/6)<br />
+
Atlas mcore jobs being killed a Sheffield. At first glance Elena suspected the jobs hit the time limit, but CREAM errors have been spotted. Let us know if you need a hand debugging this. In progress (21/6)
+
 
+
'''LIVERPOOL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129296 129296] (30/6)<br />
+
LHCB wondering why they're not seeing more jobs at Liverpool. John politely reported on the state of the Liverpool AC. Hope things stay cool(ish). In progress (30/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129184 129184] (26/6)<br />
+
The Liverpool storage accounting check ticket - John provided some good feedback. In progress (30/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129288 129288] (30/6)<br />
+
Duncan spotted a problem with the Liverpool perfsonar results. John reports a full root partition and has resized it. Hopefully nothing go fubared, playing the wait and see game. In progress (30/6)
+
 
+
'''LANCASTER'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129183 129183] (25/6)<br />
+
The Red Rose edition of the Storage Accounting Check. I was hoping to close this today, but my dpns-du is still going. In progress (27/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129242 129242] (29/6)<br />
+
Availability ticket after a rocky few weeks, on the road to recovery now. On hold (3/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129287 129287] (30/6)<br />
+
Another ticket from Duncan, the Lancaster perfsonars hadn't initialised their IPv6 address properly after a reboot. Fixed, but needs investigating. In progress (30/6)
+
 
+
'''RHUL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129223 129223] (28/6)<br />
+
In its continued decommissioning, Daniela has asked that vo.londongrid.ac.uk be removed from the site. Govind just has the SE to go. In progress (28/6)
+
 
+
'''QMUL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129221 129221] (28/6)<br />
+
A similar vo.londongrid.ac.uk decommissioning ticket for QM. Not spotted yet? Assigned (28/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129155 129155] (26/6)<br />
+
LHCB having issues accessing files over xroot at QM. This has only been tried in anger for atlas before, so it looks like some teething troubles are being seen. Daniela has asked for a handy CMS file to try out just in case. In progress (3/7)
+
 
+
'''IMPERIAL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129182 129182] (25/6)<br />
+
The Imperial storage accounting ticket, Simon replied and just waiting on the gocdb thing now. Waiting for reply (28/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=128555 128555] (30/6)<br />
+
Mysterious CMS gfal problems in jobs at IC. It looks like this is still very much under investigation, although the site is drained of jobs in the meantime. In progress (3/7)
+
 
+
'''BRUNEL'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129222 129222] (28/6)<br />
+
Just an londongrid vo decommissioning ticket here, progressing nicely. In progress (1/7)
+
 
+
'''100IT'''<br />
+
Have 4 tickets, only one properly fielded:<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=128976 128976]<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129023 129023]<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=128095 128095]<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129156 129156]
+
 
+
'''THE TIER 1'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129299 129299] (3/7)<br />
+
A CMS user spotted errors trying to pull data from RAL. Looks like checksum differences - the user has got back and it looks like the file is corrupt. In progress (3/7)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129211 129211] (27/6)<br />
+
Atlas transfer failures to Tokyo - they seem to be gone now, despite nothing being fixed or found to be wrong. If still fixed the ticket can be closed. In progress (29/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129059 129059] (20/6)<br />
+
LHCB spotted timeouts, which look to have since been resolved. Just waiting on confirmation of this before closing the ticket. Waiting for reply (28/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129098 129098] (22/6)<br />
+
Another atlas transfer ticket, thanks to Alastair and Gareth for trying to clear things up between the two issues. Are these globus errors still occuring?. In progress (29/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=129228 129228] (28/6)<br />
+
A CMS ticket for low xroot success rates for HC jobs. A restart of xrootd redirectors seems to have fixed a few issues for Andrew at least, waiting on user feedback. Waiting for reply (30/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=127597 127597] (7/4)<br />
+
A CMS ticket checking on site networking at RAL, waiting on a update from the RAL networking team. On hold (14/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=128991 128991] (16/6)<br />
+
solidexperiment.org requesting tape support at RAL. Passed on to the castor team. In progress (16/6)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=124876 124876] (7/11/2016)<br />
+
ROD ticket for echo, due to the probes not using the correct paths. Still no movement on the counter-ticket [https://www.ggus.org/index.php?mode=ticket_info&ticket_id=125026 125026]. On hold (1/1)
+
 
+
[https://ggus.eu/?mode=ticket_info&ticket_id=117683 117683] (18/11/15)<br />
+
Glue2 publishing for Castor. Some progress, but no news for a few months. On hold (10/5)
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 600: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
''' 29th November 2016 '''
+
'''Monday 20th November'''
 +
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
  
LSST monitoring is available through vo-nagios
+
'''Tuesday 18th July'''
 
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail 
+
 
+
''' 13th September 2016 '''
+
 
+
* New wiki page has been created for ARGO Nagios https://www.gridpp.ac.uk/wiki/ARGO_Nagios_Monitoring. I will add some more information to it later.
+
* Removed old wiki links about sam nagios from gridpp wiki page.
+
* VO nagios still exist and working. I have opened a ticket to explore ARGO VO Nagios,  https://ggus.eu/index.php?mode=ticket_info&ticket_id=123604
+
  
  
Line 627: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 +
  
 
* Impact
 
* Impact

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A