Difference between revisions of "Operations Bulletin Latest"

From GridPP Wiki
Jump to: navigation, search
()
()
 
(1,224 intermediate revisions by 21 users not shown)
Line 5: Line 5:
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
{| width="100%" cellspacing="0" cellpadding="0" style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0 1em 0;"
 
|-
 
|-
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 17th April 2017
+
| style="background-color: #d8e8ff; border-bottom: 1px solid silver; text-align: center; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-top: 0.1em; padding-bottom: 0.1em;" | Week commencing Monday 25th February 2019
 
|}
 
|}
  
Line 27: Line 27:
 
====== ======
 
====== ======
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
<!-- ***********************Start General text*********************** ----->'''
+
'''Tuesday 18th June'''
 +
* DPM Workshop last week - come to this week's storage meeting for an in-depth look.
 +
** https://indico.cern.ch/event/776832/
 +
* DIRAC downtime this week due to the move to Slough - good luck!
 +
* EGI Ops meeting this week.
 +
** https://wiki.egi.eu/wiki/Agenda-2019-06-17
 +
** HTCondorCE commissioning ongoing, SRM decommissioning survey
 +
** State of SRM usage at DPM sites?
  
'''Tuesday 18th April'''
 
* RHEL/SL 6.9 openssl update fall-out.
 
* Enabling support for the DUNE VO (joining up requests).
 
  
 +
'''Tuesday 11th June'''
  
'''Tuesday 4th April'''
+
* Technical Meeting last week about the New JSON based Information System:  https://indico.cern.ch/event/821105/
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170403#Monday Minutes] of Monday's operations meeting are available.
+
* This week we will get round to looking at the outcome of the Security Day (and HEPSYSMAN).
* This year's WLCG workshop will be held June 19-22 in Manchester: [http://indico.cern.ch/event/609911 Agenda]. Registration.
+
* The DPM Workshop is this week: https://indico.cern.ch/event/776832/ There's a Vidyo Room planned for people to listen in.
* Andrew L: Advance warning: FTS3 deprecation of SOAP (4th April CERN and soon at RAL)
+
* CentOS7 Migration https://twiki.cern.ch/twiki/bin/view/AtlasComputing/CentOS7Deployment
** people should no longer use the very old glite-transfer-* commands and instead use fts-transfer-* commands
+
<!-- ***********************Start General text*********************** ----->'''
** when specifying an FTS server use port 8446 rather than 8443.
+
'''Tuesday 4th June 2019'''
** This move presents a problem for non-LHC VOs ... RAL options to postpone?
+
* The Security Day  + HEPSYSMAN was on t'other week: https://indico.cern.ch/event/721692/
* Tier-2 reports for Q117 being generated. Please support their timely availability!
+
* Please can sites review their GOCDB information: https://ggus.eu/?mode=ticket_info&ticket_id=141296
* ATLAS monitoring page usage survey. Their [http://adc-monitoring.cern.ch/ quick links page].
+
* iris.ac.uk VO - Andrew explained this.
* There was an EGI OMB last Thursday | [https://indico.egi.eu/indico/event/3235/ Agenda].
+
* New(-ish) HEPOSLib release - 7.2.9 https://twiki.cern.ch/twiki/bin/view/LCG/WLCGBaselineTable
* cvmfs repo for the gridpp VO - status and plans for regional VOs to move
+
* Gareth's query about the WS interface to ARC on TB-SUPPORT
* There is a pre-GDB next Tuesday with an [http://indico.cern.ch/event/578969/ agenda] focused on "Collaborating with other communities".
+
* Anything else?
* The GDB next week has the following [http://indico.cern.ch/event/578985/ agenda] and an afternoon discussion on containers.
+
  
'''Monday 27th March'''
 
* EGI Operations Broadcast - March 2017
 
* HSF Workshop on Visualization software - starting Tuesday March 28, 16hrs - BE Auditorium (6-2-024)
 
 
'''Tuesday 21st March'''
 
* Status of EMI and UMD UI/WN in CVMFS grid.cern.ch ... and planning CentOS7.
 
* GridPP VO CVMFS discussion. (Naming?).
 
* [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMeetingWeek170320#Monday Minutes] of Monday's WLCG ops meeting are available.
 
* Reminder of the survey (table) for GridPP38.
 
* The final T2 reliability and availability reports for February 2017 are [https://espace.cern.ch/WLCG-document-repository/ReliabilityAvailability/2017/02-17/ available].
 
* Steve asks about [http://argo.egi.eu/lavoisier/status_report-site?ngi=NGI_UK&start_date=2017-03-11T14:51:21Z&end_date=2017-03-14T14:51:21Z&report=Critical&accept=html ARGO monitoring for the UK] and ARC site greyness. File a ticket.
 
* Simon points out there is a [https://mailman.ic.ac.uk/mailman/listinfo/gridpp-dirac-users GridPP DIRAC users list at Imperial] connected with support.
 
* On 16th: Many ATLAS sites were set in a test mode because of "no SE/SURL protocols defined for output". AGIS had the wrong update values.
 
* [https://operations-portal.egi.eu/vapor VAPOR application v2.2] is now online. [http://operations-portal.egi.eu/vapor/resources/GL2Map Map] |[http://operations-portal.egi.eu/vapor/resources/GL2ResFaulty Faulty Resources] | Figures - CPU & Storage split | [http://operations-portal.egi.eu/vapor/downloadLavoisierInfo API].
 
  
  
Line 78: Line 68:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
 
<!-- ***********************Start ops coord text*********************** ----->
'''Tuesday 4th April'''
+
'''Tuesday 11th June'''
* The next ops coordination meeting is this Thursday 6th April. [https://indico.cern.ch/event/628913/ Agenda]. The theme is HTCondor accounting work at PIC.
+
 
** Any T1 or T2 issues to be discussed?
+
* I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. [https://indico.cern.ch/event/823800/ Agenda.] [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190606 Minutes.] Ste was there - any observations?
 +
 
 +
'''Tuesday 14th May'''
 +
* Next meeting this Thursday.
 +
 
 +
'''Tuesday 9th April'''
 +
* Ops meeting last week: https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190404
 +
 
 +
 
 +
'''Tuesday 26th March'''
 +
* For information, there was an Ops meeting on the 7th: https://twiki.cern.ch/twiki/bin/viewauth/LCG/WLCGOpsMinutes190307 (I think we might have dicussed this one).
 +
* Next meeting booked for 4th April
 +
 
 +
'''Monday 11th February 2019'''
 +
* There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes190207 here].
 +
** End of CREAM support Dec 2020.
 +
** Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
 +
** Operational intelligence discussion ([https://indico.cern.ch/event/795889/sessions/302520/attachments/1792600/2920978/Operational_Intelligence_-_WLCG_Ops_Coord-2.pdf see slides]).
 +
** Experiment updates (see ATLAS discussion on DOMA)
 +
** WG updates (few).
 +
 
 +
 
 +
 
  
'''Monday 20th March'''
 
* The only update relates to a [https://indico.cern.ch/event/617334/ discussion of the WLCG workshop agenda] that took place last week.
 
  
'''Monday 6th March'''
 
* There was an ops coordination meeting on Thursday 2nd March - [https://indico.cern.ch/event/615987/ agenda] | [https://twiki.cern.ch/twiki/bin/view/LCG/WLCGOpsMinutes170302 Minutes].
 
* The overview talks were: [https://indico.cern.ch/event/615987/contributions/2485932/subcontributions/220874/attachments/1421101/2177829/mid-sla.pdf Mid-SLAs] | [https://indico.cern.ch/event/615987/contributions/2485932/subcontributions/220875/attachments/1421195/2177994/20170302-mcnab-mjf.pdf Machine Job Features].
 
* The main summary items:
 
** Lessons learned from ATLAS tape usage tests. Follow up via FTS steering group. Will share experience with other experiments.
 
** "Mid SLA" resources. During the next months accumulate experience at CERN (providing such resources) and in experiments (using such resources). Review accumulated experience after a couple of months and decide what we need to do in terms of tagging, accounting, etc...
 
** MJF deployment is not as successful as desired. Find help (at least temporary) for deployment campaign concentrating on the LHCb sites. See whether this task would become more important considering outcome of the benchmarking discussion.
 
** In order to avoid inconsistencies in the naming of the service types along the WLCG IS chain (GocDB, OIM, SAM, experiment-specific systems like Dirac), there will be agreement between representatives from OSG, EGI and GocDB team and IS evolution task force on the policy for introducing of the new service types.
 
** The next WLCG ops coordination meeting will be on 6th April.
 
  
 
<!-- **********************End ops coord text************************** ----->
 
<!-- **********************End ops coord text************************** ----->
Line 110: Line 111:
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
 
<!-- ***********************Start T1 text*********************** ----->
'''Tuesday 18th April'''
+
 
A reminder that there is a weekly [http://www.gridpp.ac.uk/wiki/RAL_Tier1_Experiments_Liaison_Meeting Tier-1 experiment liaison meeting]. Notes from the last meeting [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2017-04-12 here]
+
'''17 June 2019''' Report for the Experiments Liaison Report (17/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-17 here].
* There have been problems with the LHCb Castor instance since the SRM upgrade on the 23rd March. On the 12th April this is being reverted.
+
<!-- *********************************************************** ----->
* On the 19th April, Atlas reached a milestone of having 1PB of data in ECHO
+
* On Saturday (8th April) one of the Windows Hyper-V 2012 hypervisors had a problem. Most VMs were restarted elsewhere but a small number had a problem. This led to batch (CE and argus) problems during that day.
+
* Ongoing work to replace two (of the four) chillers supplying the A/C for the R89 machine room. The first chiller has been replaced. The second was lifted into position on Thursday (30th) and it is being commissioned.
+
* The number of batch jobs running in SL6 containers on worker nodes running SL7 is being ramped up.
+
* The IPv6 addressing scheme for the tier1 has been agreed and is in place. We hope to start offering services via IPv6 in the near future.
+
* New capacity hardware has been delivered (both CPU and storage). This is now in the racks being cabled up.
+
* The production Perfsonar nodes on the main Tier1 network are running measurements using both IPv4 and IPv6.
+
* Out of Hours cover for the CEPH ECHO service is being piloted.
+
 
<!-- **********************End T1 text************************** ----->
 
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
 +
'''11 June 2019''' Report for the Experiments Liaison Report (10/06/2019) is [https://www.gridpp.ac.uk/wiki/Tier1_Operations_Report_2019-06-10 here].
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
 +
<!-- **********************End T1 text************************** ----->
 +
* Ongoing, we are seeing high outbound packet loss over IPv6.  Central networking performed a firmware update to the border routers but this didn’t resolve the issue.  Plan to move connections to the new border routers in Mid June.  Will do this before trying to debug any further.
 +
* Three certificates were revoked mistakenly on ARGUS on Thursday.  All SAM tests failed until this was fixed the next morning.  Batch farm also did not start any new jobs during this time.  We used this accidental draining to reboot nodes that needed to pick up security patching.
 +
* LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
 +
* Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team.  Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
 +
 
|}
 
|}
<!-- ****************End T1****************** ----->
 
  
 
<!-- ****************Start Storage & DM****************** ----->
 
<!-- ****************Start Storage & DM****************** ----->
Line 136: Line 137:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''[http://storage.esc.rl.ac.uk/weekly/20170419-minutes.txt Wednesday 19 Apr]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191030-minutes.txt Wed 30 Oct]'''
* Case for (re)testing CVMFS for T2s? (and non-LHC VOs?)
+
* DOME upgrade problems at Edinburgh
* Other storage related issues arising from use of containers?
+
* Data management support/development for IRIS users
  
'''[http://storage.esc.rl.ac.uk/weekly/20170412-minutes.txt Wednesday 12 Apr]'''
+
'''[http://storage.esc.rl.ac.uk/weekly/20191023-minutes.txt Wed 23 Oct]'''
* Musings on the outcome of last week's [https://indico.cern.ch/event/601969/ GridPP meeting]
+
* Rucio reporting
* Discussion of which of a selection of coming events to aim to do something for. If that makes sense, gramatically.
+
  
'''[http://storage.esc.rl.ac.uk/weekly/20170215-minutes.txt Wednesday 15 Feb]'''
+
'''Wed 16 Oct'''
* Space tokens!  Use them!
+
* CEPH workshop at CERN report
* Leafed through interesting topics (technology permitting) from the [https://indico.cern.ch/event/565381/timetable/#all.detailed CS3 workshop]
+
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20191002-minutes.txt Wed 02 Oct]'''
 +
* Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
 +
* Roadmap for xroot and http TPC for RAL FTS(es)
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190925-minutes.txt Wed 25 Sept]'''
 +
* Storage support for IRIS VOs?
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190918-minutes.txt Wed 18 Sept]'''
 +
* Report from yesterday's Rucio Face Meeting at Coseners
 +
* Suggestions for following up from yesterday's CEPH day hosted by CERN
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190911-minutes.txt Wed 11 Sept]'''
 +
* Storage related stuff at the FNAL (pre-)GDBs
 +
* DOME upgrade tickets for non-DOME DPM sites
 +
 
 +
'''[http://storage.esc.rl.ac.uk/weekly/20190904-minutes.txt Wed 04 Sept]'''
 +
* Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
 +
* Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.
  
'''[http://storage.esc.rl.ac.uk/weekly/20170208-minutes.txt Wednesday 08 Feb]'''
 
* More on accounting (again)
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 165: Line 181:
 
====== ======
 
====== ======
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 21 March 2017'''
+
'''Tuesday 30 Apr 2019'''
* Please fill in the [[GridPP5 Tier2 plans]] survey table for GridPP meeting in Brighton.
+
* ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested
 
+
 
+
'''Tuesday 14 March 2017'''
+
* Please fill in the [[GridPP5 Tier2 plans]] survey table for GridPP meeting in Brighton.
+
 
+
'''Tuesday 28 February 2017'''
+
* ATLAS jobs now running on Birmingham Vac VMs.
+
* LHCb is now running its standard DIRAC VMs on Google Compute Engine using GridPP's Vcycle.
+
 
+
'''Tuesday 21 February 2017'''
+
* Some ALICE production jobs running at Birmingham and Oxford in Vac VMs.
+
 
+
'''Tuesday 14 February 2017'''
+
* Vac installed at Birmingham. Running LHCb production jobs. Preparing to run ALICE VMs.
+
* ALICE VMs switched to using GSI proxies internally rather than host cert/keys.  
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 198: Line 199:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
'''Tuesday 6th February'''
 +
* HEPSPEC06 on recent Intel CPUs. [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page]
 +
 +
 +
'''Tuesday 30th January'''
 +
* Please keep updating the [https://www.gridpp.ac.uk/wiki/HEPSPEC06 GridPP benchmarking page].
 +
 +
'''Tuesday 24th Oct'''
 +
* A talk on end-to-end validation of any site's APEL accounting was presented at the WLCG Accountuing Taskforce meeting, 19th Oct. There slides exist here: https://indico.cern.ch/event/673843/contributions/2756986/attachments/1542818/2420233/blackBoxAccTesting.pdf
 +
 +
 
'''Monday 16th January'''
 
'''Monday 16th January'''
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
 
* The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.
Line 224: Line 236:
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
  
'''Tue 7th Mar'''
+
''' Tue 9th July 2019'''
  
I want to get rid of following stale docs...
+
LHCb has added this to their requirements:
  
* Ten Easy Network Questions
+
Sites not having an SRM installation must provide:
* GridPP Answers to 10 Easy Network Questions
+
* SL5 status
+
* Glasgow Middleware Operations Logbook
+
* London Tier2 Shares
+
* 23rd June 2010 Special Topic: NGS Technical Roadmap - Pete Gronbech
+
* SAM availability: Monthly summary table
+
* Transfer Tests Birmingham Endpoints
+
* EVO Tips and Tricks
+
* BaBar: bbrbsub270
+
  
'''Monday 13th Feb'''
+
* disk only storage
* Please check the keydocs page. Would all owners please review their pages and prepare a short note on how they will bring things up-to-date in the coming months. This will be discussed at a core ops meeting (poll to be circulated shortly).
+
* a GRIDFPT endpoint (a single dns entry)
* There are several EGI operations document updates out for review. Please make comments to Jeremy by 20th Febraury for inclusion in the UK feedback:
+
* an XROOT endpoint (a single dns entry)
** - Resource Centre OLA https://documents.egi.eu/document/31
+
* a way to do the accounting (preferably following the WLCG TF standard: https://twiki.cern.ch/twiki/bin/view/LCG/StorageSpaceAccounting)
** - Resource Infrastructure Provider OLA https://documents.egi.eu/document/463
+
** - Corporate-level EGI OLA https://documents.egi.eu/document/2752
+
  
 +
''' Tue 16th April 2019'''
  
'''Monday 30th January'''
+
Minor change to LHCB requirements in Approved VOs:
  
The fusion VO has been removed from GridPP Approved VOs.
+
* Sites having migrated to the Centos7 (including "Cern Centos7") operating system or  later versions are requested to provide support for singularity containers.
  
'''Monday 9th January'''
+
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements
  
* Tom put these together:
+
'''Tue 2nd April 2019'''
** A [http://dx.doi.org/10.5281/zenodo.222702  snapshot of the GridPP UserGuide] is now available as an offline document in the Zenodo repository:
+
** ...and the v1.0 release of the LaTeX code used to compile it is [http://doi.org/10.5281/zenodo.222755 here].
+
**  There are some minor differences (mainly hyperlink-related) to the online version [1], which has also had a v1.0 release [http://doi.org/10.5281/zenodo.222756 here].
+
  
 +
Changes to Approved for DUNE (and LZ)
  
''' Tue 22nd Nov '''
+
There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.
  
* More on Accounting audit tools
+
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
The process for ARC, Toque and VAC is now documented here.
+
I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.
 +
 
 +
Sites with DUNE services need to update using whatever method they employ.
 +
 
 +
Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time.  But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.
 +
 
 +
Ste
 +
 
 +
 
 +
'''Tuesday 5th Mar 2019'''
 +
New VOMs details for Biomed:
 +
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
 +
 
 +
New VOMs rpms to match.
 +
 
 +
http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
Documentation done for HTCondor-CE apel accounting.
 +
https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting
 +
 
 +
 
 +
'''Tuesday 12th Feb 2019'''
 +
New CA DN for Biomed
 +
<pre>
 +
< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
 +
---
 +
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "
 +
</pre>
 +
 
 +
'''Tuesday 5th Feb 2019'''
 +
For enmr, certificate of voms-02.pd.infn.it
 +
 
 +
New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it,
 +
New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3
 +
 
 +
Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
  
https://github.com/gridpp/audit/wiki
 
  
  
Line 278: Line 313:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0 0.5em 1em 0;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Interoperation - [https://wiki.egi.eu/wiki/Operations_Meeting EGI ops agendas] [https://indico.egi.eu/indico/category/32/ Indico schedule]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 284: Line 319:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Tuesday 21st March'''
 
* The [https://wiki.egi.eu/wiki/Agenda-13-03-2017 last meeting was on 13th March].
 
* Next meeting is on 10th April.
 
  
'''Monday 13th February'''
+
''' 14 May 2019 '''
* There was an ops meeting on 13th February. [https://wiki.egi.eu/wiki/Agenda-13-02-2017 Agenda]
+
* Meeting for May cancelled. Next meeting is on 10th June.
** frontier-squid-3 in UMD 4.4.0 - changes to config
+
** Assess IPv6 readiness:
+
***Resource Centres: assess the IPv6 readiness of the site infrastructure (real machines, cloud managers)
+
***NGIs/ROCs please start discussing with sites and provide suggestions for the overall plan
+
** Decommissioning of dCache 2.10
+
** Discussed stale ARGO results; being discussed with Product Teams.
+
  
'''Monday 16th January'''
+
''' Monday 11th March '''
* There was an ops meeting on 9th January. [https://wiki.egi.eu/wiki/Agenda-09-01-2017 Agenda].
+
  
 +
* Agenda: https://wiki.egi.eu/wiki/Agenda-2019-03-11 
 +
* UMD 4.8.2 released :  ARC 15.03.19 - To address how ARC counts HELD job
 +
* DPM Legacy mode is going to end in June 2019
 +
* EGI will open tickets after June
 +
* HTCondor CE accounting status?
 +
* http://egi.ui.argo.grnet.gr/ : https://ggus.eu/index.php?mode=ticket_info&ticket_id=139877 
  
'''Monday 7th November'''
 
  
* There was an EGI Ops meeting today: [https://wiki.egi.eu/wiki/Agenda-07-11-2016 agenda]
+
''' Tuesday 12th February '''
 +
* There was an EGI ops meeting yesterday - [https://indico.egi.eu/indico/event/4320/ Agenda]. We were asked to review the IPv6 readiness information ([https://wiki.egi.eu/w/index.php?title=IPV6_Assessment see here]). We should perhaps link in the GridPP IPv6 table for updates status.
  
* UMD 3.14.5 released today
 
** VOMS 3.5.0, which makes RFC proxies the default for voms-proxy-init
 
  
* UMD 4.3.0 'October' release, release candidate ready, to be released by end of this week, including:
+
''' Friday 1st February '''
** ARC, GFAL2, XROOT, Davix, dCache, ARGUS, Gridsite, edg-mkgrid, umd-release for CentOS7
+
  
* please start using UMD4/SL6 or UMD4/CentOS7 instead of UMD3/SL6 & please don't use anymore EMI3
+
* Early adopters needed for HTcondor CE , https://ggus.eu/index.php?mode=ticket_info&ticket_id=139377
** (think there may be a campaign around this soon)
+
  
* Downtimes due to the vulnerability CVE-2016-5195: request an A/R recomputation
+
''' Thursday 17th January EGI OMB meeting '''
** All the resource centres that were affected by the vulnerability CVE-2016-5195 and that declared a downtime between 2016-10-20 16:00 UTC and 2016-10-31 18:00 UTC are invited to request a recomputation of A/R figures for the days in which the downtime was ongoing.
+
  
* ARGO proposal to use GOCDB as the only source of topology information
+
* CREAMCE to be out of support by Dec 2020
** https://indico.egi.eu/indico/event/3092/contribution/2/material/0/0.pdf
+
* More effort to fix accounting issue of HTCondor CE
 +
 
 +
''' Monday 14th January 2019 '''
 +
* Agenda https://wiki.egi.eu/wiki/Agenda-2019-01-14
 +
 
 +
* No UK specific issue mentioned.
 +
 
 +
* IPv6 readiness plan is going to be summarized at OMB.
 +
 
 +
'
  
* VAPOR 2.1 released in September, it replaces GSTAT
 
** each NGI should review the information provided by their sites and let us know any inconsistency: http://operations-portal.egi.eu/vapor/resources/GL2ResSummary
 
  
* Next meeting: Dec 5th, 2016 [https://indico.egi.eu/indico/category/32/ meeting calendar]
 
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
 
<!-- *********************************************************** ----->
 
<!-- *********************************************************** ----->
Line 338: Line 370:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th Febraury'''
+
'''Tuesday 4th July'''
 +
* There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the [https://indico.cern.ch/event/609911/timetable/#20170621 Wednesday sessions].
 +
 
 +
'''Monday 13th February'''
 
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
 
* This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.
  
Line 364: Line 399:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''20th March'''
+
'''Tuesday 5th February'''
* Another quiet week. One ticket to Oxford and a new availablility ticket to Glasgow.  Other than that, most of the tickets have been there for a couple of weeks.
+
* Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
 +
* Few availability tickets on hold
 +
* Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout
  
'''27th February'''
+
'''Tuesday 14th August'''
* Forwarded two tickets (RALPP and ECDF) to the monitoring team, as this looks like more ARC shenanigans.
+
* A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.
* There's also a bunch of low availability tickets which clog up the system.
+
  
 
'''Tuesday 21st February'''
 
* Very quiet!
 
* Rota responses enable planning through to May.
 
 
'''Monday 16th January'''
 
* Rota to be updated this week. Gordon is on shift this week.
 
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 390: Line 419:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 13th February'''
+
'''Monday 20th November'''
* Please can we hear something from Raul and Sam (or others contributing to the middleware readiness work) about news in this area at the ops meeting next week? Thank you.
+
* IPv6: https://www.gridpp.ac.uk/wiki/IPv6_site_status (up-to-date as of November)
* Does anyone want specific questions in this area tackled in a roundtable discussion?
+
* Batch systems and WN moves to SL7/CentOS7: https://www.gridpp.ac.uk/wiki/Batch_system_status (added column for date of last update)
 
+
'''Tuesday 7th December'''
+
* Raul reports: validation of site BDII on Centos 7 done.
+
  
'''Tuesday 15th September'''
 
* [http://repository.egi.eu/2015/09/10/release-umd-3-13-3/ UMD 3.13.3 is available].
 
  
'''Tuesday 12th May'''
 
* MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
 
  
  
'''References'''
+
'''Historical References'''
  
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
 
* Staged Rollout pages (now separated into EMI1 & 2), and the page listing the deployed versions is extractable from the bdii, so they should all be reasonably up-to-date:
Line 425: Line 447:
  
 
===== =====
 
===== =====
'''Tuesday 11th April'''
+
'''Tuesday 11th June
* One EGI SVG advisory issued under [TLP:AMBER] regarding Openstack
+
 
+
'''Tuesday 4th April'''
+
* No advisories or incidents to report
+
* Last week's WISE workshop [https://wiki.geant.org/display/WISE/WISE+Home], not new but ...
+
** For developers - SWAMP software assurance toolset [https://wiki.geant.org/download/attachments/63963422/SiB-1March2017.pdf?version=1&modificationDate=1490611818146&api=v2]
+
** For operations - Incident response in the Federated identity world - Sirtfi [https://wiki.geant.org/download/attachments/63963422/20160327%20Incident%20Response%20Identity%20Federations.pptx?version=2&modificationDate=1490606503314&api=v2]
+
* UK Security Team meeting this afternoon.
+
 
+
'''Tuesday 28th March'''
+
* The following advisories were issued under [TLP:AMBER], check the advisory for details and if you might be affected -
+
** 1 High risk vulnerability advisory issued by EGI SVG potentially affecting a number of services.
+
** 1 Critical risk vulnerability advisory issued by EGI SVG affecting 1 service.
+
** 1 Security Incident reported via the EGI CSIRT, not in the UK.
+
* Updated IGTF distribution 1.82 available - updated CA root certificates [https://dist.igtf.net/distribution/igtf/current/]
+
* WISE - Security for collaborating infrastructures meeting this week [https://wiki.geant.org/display/WISE/WISE+Home]
+
  
 +
* NTR
  
 
|}
 
|}
Line 455: Line 462:
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
{| style="background-color: #ffffff; border: 1px solid silver; border-collapse: collapse; width: 100%; margin: 0em 0 0 0.3em;"
 
|-
 
|-
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [http://psmad.grid.iu.edu/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar production dashboard] |[http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config PerfSonar development dashboard] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
+
| style="background-color: #b7f1ce; border-bottom: 1px solid silver; text-align: left; font-size: 1em; font-weight: bold; margin-top: 0; margin-bottom: 0; padding-left: 0.4em; padding-top: 0.1em; padding-bottom: 0.1em;" | Services - [https://psmad.opensciencegrid.org/maddash-webui/index.cgi?dashboard=UK%20Mesh%20Config PerfSonar production dashboard] |[https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Fhostgroup%3DUK%26opthost_group%3DUK%26view_name%3Dhostgroup PerfSonar ETF] | [http://opensciencegrid.org/networking/ OSG Networking and perfSONAR pages] | [https://voms.gridpp.ac.uk:8443/vomses/ GridPP VOMS]
 
|-
 
|-
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
 
| style="padding: 0.4em 0.4em 0.4em 0.4em;" |
Line 463: Line 470:
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
 
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
  
'''Monday 6th March'''
+
'''Monday 5th March'''
* Last week it was noted that some ATLAS RIPE probes (the USB ones) have had hardware errors. If you need a replacement and RIPE are slow to respond then contact Jeremy.
+
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/772031/ Umeå, Sweden, 4-5 Jun 2019]. Registration required.
* Is anyone running any tests with their RIPE probe?
+
 
 +
'''Monday 10th September'''
 +
* Please check perfSONAR status [https://psetf.opensciencegrid.org/etf/check_mk/index.py?start_url=%2Fetf%2Fcheck_mk%2Fview.py%3Ffilled_in%3Dfilter%26host_regex%3Duk%26view_name%3Dsearchhost here] especially the mesh URL (should be http://psconfig.opensciencegrid.org/pub/auto/FQDN)
 +
 
 +
'''Monday 2nd July'''
 +
* Next LHCOPN and LHCONE meeting: [https://indico.cern.ch/event/725706/ Fermilab, Batavia US, 30-31October 2018]. Registration required.  
 +
 
 +
'''Monday 30th April'''
 +
* The [https://indico.cern.ch/event/725706/ next LHCOPN and LHCONE joint meeting] will take place on Tuesday the 30th and Wednesday the 31st of October 2018
 +
 
 +
'''Monday 19th February'''
  
'''Tuesday 14th February'''
+
Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are [https://opensciencegrid.github.io/networking/perfsonar/installation/ here]. Current OS versions [https://tinyurl.com/y9eode2b here].
* The development dashboard is now operational again. However the production dashboard is not currently displaying latency results (OSG ticket submitted).
+
* Birmingham pS host had lost its entire network connection and both Lancaster's hosts their IPv6 connection. Durham results are incomplete, GGUS ticket submitted (#126587).
+
  
'''Tuesday 25th October'''
 
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
 
* Duncan has recreated the UK perfSONAR mesh. [http://maddash.aglt2.org/maddash-webui/index.cgi?dashboard=UK%20Config Link here]!
  
Line 487: Line 501:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
'''Monday 10th April 2017, 15.00 BST'''<br />
 
43 Open UK tickets this week (not quite a record, but getting close).
 
  
'''UK NGI - GOCDB INFORMATION REVIEW'''<br />
+
32 Open Tickets this week, which is an in depth a look as I've been able to take.
[https://ggus.eu/?mode=ticket_info&ticket_id=127588 127588] (7/4)<br />
+
There's a yearly drive to double check the NGI contact information in the GOCDB. There's  a list of tasks for NGI managers, but RC managers (aka site admins) are also requested to review their contact details. If everyone could double check the information as requested that would be great - we've got a leg up on this thanks to Ian's Security Contact Challenge. They have asked for this to be completed by the 28th of April - so we'll bring this up again at that week's Ops meeting. In progress (10/4)
+
 
+
'''CMS RFIO tickets''' (5/4)<br />
+
CMS have released a bunch of tickets to Glasgow, Edinburgh, UCL, Brunel and the Tier 1 asking for the rfio protocol to be removed from their site 'storage.xml's. The Edinburgh and UCL tickets might not have been noticed yet as they were still in the "assigned" state at time of writing, the rest seem to be going okay:<br />
+
UCL: [https://ggus.eu/?mode=ticket_info&ticket_id=127526 127526]<br />
+
ECDF: [https://ggus.eu/?mode=ticket_info&ticket_id=127527 127527]
+
 
+
'''QMUL Biomed ticket'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=127445 127445] (1/4)<br />
+
I don't think this ticket was a poorly thought out April Fool's day joke, so please could it be acknowledged (or just dismissed with a prompt solving/unsolving if it's a load of cobblers). Assigned (1/4)
+
 
+
'''IC MICE TICKET'''<br />
+
[https://ggus.eu/?mode=ticket_info&ticket_id=127473 127473] (3/4)<br />
+
This Mice ticket has been bounced around a bit, so you may not have noticed it arrive in the Imperial Inbox (on top of all the other work).
+
 
+
That's all for this week, next week I'm enjoying Lancaster's generous long Easter closure so if there is a meeting I won't be there, so [http://tinyurl.com/nwgrnys here's a link to all the UK tickets] in case you need it.
+
  
 
<!-- ******************Edit stop********************* ----->
 
<!-- ******************Edit stop********************* ----->
Line 522: Line 517:
 
===== =====  
 
===== =====  
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
''' 29th November 2016 '''
+
'''Monday 20th November'''
 +
* The WLCG dashboard is available here: http://dashboard.cern.ch/.
 +
* Please review the results on [http://pprc.qmul.ac.uk/~lloyd/gridpp/ Steve's test pages].
  
LSST monitoring is available through vo-nagios
+
'''Tuesday 18th July'''
 
+
* Following our ops discussion last week, Steve will focus [http://pprc.qmul.ac.uk/~lloyd/gridpp/ his tests] on supporting the GridPP DIRAC area and decommission the other tests.
https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail 
+
 
+
''' 13th September 2016 '''
+
 
+
* New wiki page has been created for ARGO Nagios https://www.gridpp.ac.uk/wiki/ARGO_Nagios_Monitoring. I will add some more information to it later.
+
* Removed old wiki links about sam nagios from gridpp wiki page.
+
* VO nagios still exist and working. I have opened a ticket to explore ARGO VO Nagios,  https://ggus.eu/index.php?mode=ticket_info&ticket_id=123604
+
  
  
Line 549: Line 539:
 
===== =====
 
===== =====
 
<!-- ******************Edit start********************* ----->
 
<!-- ******************Edit start********************* ----->
 +
 +
'''Monday 20th November'''
 +
* Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the [http://www.ukbiobank.ac.uk/ UK Biobank project].
 +
* All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
 +
* QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.
 +
  
 
* Impact
 
* Impact

Latest revision as of 14:09, 30 October 2019

Bulletin archive


Week commencing Monday 25th February 2019
Task Areas
General updates

Tuesday 18th June


Tuesday 11th June

Tuesday 4th June 2019


WLCG Operations Coordination - AgendasWiki Page

Tuesday 11th June

  • I got stuck (figuratively) in my machine room last Thursday afternoon so missed it. Agenda. Minutes. Ste was there - any observations?

Tuesday 14th May

  • Next meeting this Thursday.

Tuesday 9th April


Tuesday 26th March

Monday 11th February 2019

  • There was a WLCG ops coordination meeting last Thursday. You can view the meeting notes here.
    • End of CREAM support Dec 2020.
    • Migration from CREAM to be discussed at the EGI conference 6-8 of May in Amsterdam.
    • Operational intelligence discussion (see slides).
    • Experiment updates (see ATLAS discussion on DOMA)
    • WG updates (few).




Tier-1 - Status Page

17 June 2019 Report for the Experiments Liaison Report (17/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.

11 June 2019 Report for the Experiments Liaison Report (10/06/2019) is here.

  • Ongoing, we are seeing high outbound packet loss over IPv6. Central networking performed a firmware update to the border routers but this didn’t resolve the issue. Plan to move connections to the new border routers in Mid June. Will do this before trying to debug any further.
  • Three certificates were revoked mistakenly on ARGUS on Thursday. All SAM tests failed until this was fixed the next morning. Batch farm also did not start any new jobs during this time. We used this accidental draining to reboot nodes that needed to pick up security patching.
  • LHCb Castor instance has been completely disabled for LHCb and will be decommissioned.
  • Brian Davies has transferred from his role as GridPP Tier-2 Storage Support Officer and has joined the Tier-1 Production Team. Although this has happened with immediate effect he will still be available for ad-hoc/informal storage support.
Storage & Data Management - Agendas/Minutes

Wed 30 Oct

  • DOME upgrade problems at Edinburgh
  • Data management support/development for IRIS users

Wed 23 Oct

  • Rucio reporting

Wed 16 Oct

  • CEPH workshop at CERN report

Wed 02 Oct

  • Safe to upgrade to DPM 1.13 but make sure the BDII is working if you support DIRAC
  • Roadmap for xroot and http TPC for RAL FTS(es)

Wed 25 Sept

  • Storage support for IRIS VOs?

Wed 18 Sept

  • Report from yesterday's Rucio Face Meeting at Coseners
  • Suggestions for following up from yesterday's CEPH day hosted by CERN

Wed 11 Sept

  • Storage related stuff at the FNAL (pre-)GDBs
  • DOME upgrade tickets for non-DOME DPM sites

Wed 04 Sept

  • Banning in SSC not entirely successful in non-DOME DPM, and end of support is nigh; tickets to upgrade will go out shortly.
  • Storage-and-data-management-wise, GridPP43 was interesting although no-one volunteered to install the next CEPH.


Tier-2 Evolution - GridPP JIRA

Tuesday 30 Apr 2019

  • ATLAS CernVM4 VMs (equivalent to CentOS 7.6) being tested


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Tuesday 6th February


Tuesday 30th January

Tuesday 24th Oct


Monday 16th January

  • The discussion topic for next week will be accounting comparisons. Please note Alessandra's comments last week.

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 9th July 2019

LHCb has added this to their requirements:

Sites not having an SRM installation must provide:

Tue 16th April 2019

Minor change to LHCB requirements in Approved VOs:

  • Sites having migrated to the Centos7 (including "Cern Centos7") operating system or later versions are requested to provide support for singularity containers.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs#VO_Resource_Requirements

Tue 2nd April 2019

Changes to Approved for DUNE (and LZ)

There is a new "Approved VOs" document showing new settings for DUNE. And, since both LZ's voms servers now show up in the EGI Portal, I've removed the (now spurious) entry for voms.hep.wisc.edu that was formerly being inserted by hand.

https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

I've also created a new set of RPMs (each has all LSC, VOMS, and XML for one VO) for all approved VOs. See Approved VOs doc for details, version is 1.9.

Sites with DUNE services need to update using whatever method they employ.

Special note: Since voms1.fnal.gov changed yesterday, I've updated documentation for that right away. But voms2.fnal.gov remains as it is until 23rd April (3 weeks). I'll update documentation for that when it is closer. Staggering the updates like this gives a time margin, so any particular site can have at least one service properly configured at any time. But it does mean that two site updates are needed; one now, and one in three weeks. However, since it's sufficient for only one (of the two) voms servers to be configured properly, sites could save effort and wait until (say) 19th April, then update both at once. But I can't dictate what site admins should do. It's your call.

Ste


Tuesday 5th Mar 2019 New VOMs details for Biomed: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

New VOMs rpms to match.

http://hep.ph.liv.ac.uk/~sjones/RPMS.voms/

Tuesday 12th Feb 2019 Documentation done for HTCondor-CE apel accounting. https://twiki.cern.ch/twiki/bin/view/LCG/HtCondorCeAccounting


Tuesday 12th Feb 2019 New CA DN for Biomed

< VOMS_CA_DN="'/C=FR/O=CNRS/CN=GRID2-FR' "
---
> VOMS_CA_DN="'/C=FR/O=MENESR/OU=GRID-FR/CN=AC GRID-FR Services' "

Tuesday 5th Feb 2019 For enmr, certificate of voms-02.pd.infn.it

New DN: /DC=org/DC=terena/DC=tcs/C=IT/L=Frascati/O=Istituto Nazionale di Fisica Nucleare/CN=voms-02.pd.infn.it, New CA_DN: /C=NL/ST=Noord-Holland/L=Amsterdam/O=TERENA/CN=TERENA eScience SSL CA 3

Please check approved VOs: https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas Indico schedule

14 May 2019

  • Meeting for May cancelled. Next meeting is on 10th June.

Monday 11th March


Tuesday 12th February

  • There was an EGI ops meeting yesterday - Agenda. We were asked to review the IPv6 readiness information (see here). We should perhaps link in the GridPP IPv6 table for updates status.


Friday 1st February

Thursday 17th January EGI OMB meeting

  • CREAMCE to be out of support by Dec 2020
  • More effort to fix accounting issue of HTCondor CE

Monday 14th January 2019

  • No UK specific issue mentioned.
  • IPv6 readiness plan is going to be summarized at OMB.

'


Monitoring - Links MyWLCG

Tuesday 4th July

  • There were a number of useful links provided in the monitoring talks at the WLCG workshop in Manchester - especially those in the Wednesday sessions.

Monday 13th February

  • This category is pretty much inactive. Are there any topics under "monitoring" that anyone wants reported at this ops meeting? If not we will remove this section from the regular updates area of the bulletin and just leave the main links.

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


On-duty - Dashboard ROD rota

Tuesday 5th February

  • Birmingham decommissioning of SRM and BDII still going on so tickets are on hold.
  • Few availability tickets on hold
  • Lancaster has WebDav ticket on hold which seems to be effect of DOME rollout

Tuesday 14th August

  • A couple of new availability tickets (QMUL and Lancaster), both for well-publicised reasons. Otherwise quiet. AM on shift this week.


Rollout Status WLCG Baseline

Monday 20th November



Historical References


Security - Incident Procedure Policies Rota

Tuesday 11th June

  • NTR


Services - PerfSonar production dashboard |PerfSonar ETF | OSG Networking and perfSONAR pages | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Monday 5th March

Monday 10th September

Monday 2nd July

Monday 30th April

Monday 19th February

Please could sites upgrade their perfsonar hosts to CentOS7. Instructions are here. Current OS versions here.

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Tickets

32 Open Tickets this week, which is an in depth a look as I've been able to take.

Tools - MyEGI Nagios

Monday 20th November

Tuesday 18th July

  • Following our ops discussion last week, Steve will focus his tests on supporting the GridPP DIRAC area and decommission the other tests.


VOs - GridPP VOMS VO IDs Approved VO table

Monday 20th November

  • Tom Whyntie has requested (and been granted) access to the GridPP VO to get some pipelines working for large-scale processing and analysis of MRI scans associated with the UK Biobank project.
  • All VOs in the incubation page being prompted for updates by the end of November (required input for OC documents).
  • QMUL (Steve L) is following up on the biomed MoU. GridPP want to be cited in research papers for the support our resources/sites provide.


Site Updates

Date



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A