Operations Report 23/12/2012
From GridPP Wiki
Revision as of 15:27, 23 January 2012 by Carmine cioffi (Talk | contribs)
Contents
Summary of Previous Week
- 3D: Ogma (3D ATLAS conditions) upgraded to 11g
- CASTOR: ATLAS SRM now running on new production hardware
- CASTOR: DLF partitioning now fixed
Operational Issues and Incidents
- CASTOR:
Plans for Week(s) Ahead
- CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
- 3D: Preparation for LHCb 11g upgrade
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|
Development Priorities
- Test and migrate to new HW
- Migrate to 11G
- GC resilience
Requirements and Blocking Issues
- None
OnCall
- Rich
Absences
Adrian: Mon
Eddy: Mon-Wed
Summary of Previous Week
- 3D: Ogma (3D ATLAS conditions) upgraded to 11g
- CASTOR: ATLAS SRM now running on new production hardware
- CASTOR: DLF partitioning now fixed
Operational Issues and Incidents
- CASTOR:
Plans for Week(s) Ahead
- CASTOR: Testing production schema dumps with 2.1.11 upgrade scripts
- 3D: Preparation for LHCb 11g upgrade
Downtimes and At Risk
Description | Start | End | Affected VO(s) | Type |
---|
Development Priorities
- Test and migrate to new HW
- Migrate to 11G
- GC resilience
Requirements and Blocking Issues
- None
OnCall
- Rich
Absences
Adrian: Mon
Eddy: Mon-Wed