Week commencing Monday 19th December 2016
Task Areas
General updates

Tuesday 20th December


Monday 12th December

  • January pre-GDB on Networking (Sites and Operations session input requested)
  • We have received notification of the November T2 R/A figures.
    • ALICE. All okay
    • ATLAS
      • RHUL 89%:91%
      • Glasgow 85%:85%
    • CMS. All okay
    • LHCb
      • Liverpool 33%:33%
      • Glasgow 28%:28%
    • Explanations:
      • RHUL: There was a DPM database move scheduled during the month.
      • LHCb results were poor (for Liverpool and Glasgow) due to SRM tests which were false positives. This has been corrected and re-computations are being requested.
      • Glasgow (ATLAS): 1-2 November - Downtime due to Power failure. 7 November - DPM pool node disk042 caused issues with DPM headnode. 17-18 November - DPM pool nodes disk042/disk070 caused issues with DPM headnode freezing SRM.
  • The EGI Security Policy Group has produced a revised draft version of the top-level Security Policy bringing the document up to date in terms of terminology and with the current set of security policy documents.
  • GridPP DIRAC job limits and other VO usage of resources.
  • Resource utilisation - can we distill the main drivers?

Monday 5th December

  • December 6th 2016 ARGO team will decommission the old SAM GridMon box mon.egi.eu, housing central ATP and POEM. These services became obsolete when we switched to central monitoring instances in July. VO SAM instances will not be affected as they are using local ATP and POEM.
  • Planet GridPP run by Glasgow for our GridPP blog posts is being moved to run on a VM this week.
  • The current VO table for GridPP is active under: http://pprc.qmul.ac.uk/~lloyd/gridpp/votable.html.
  • Marcus raised a question on: removing SE from GridPP dirac. Any general observations?
  • Matt reports on 'TMPDIR strategies': sandbox and home areas, mounted on a reasonable nfs server not working under SGE for DUNE. Pointed to https://wiki.egi.eu/wiki/Tools/Manuals/TS122.
  • The website for submitting CHEP 2016 papers will open soon. The site is provided by IOP and the committee have requested some modifications to help ensure that the submitted papers can be correctly mapped on to the relevant CHEP 2016 tracks. This process is taking a little longer than planned.
  • NA62 is now in the list of GGUS VOs.
  • 3rd Developers@CERN Forum - Frontend & User interfaces.
  • News from Monday's WLCG ops meeting.
  • CERN accounts - status.

Monday 28th November


WLCG Operations Coordination - AgendasWiki Page

Monday 5th December

  • There was a WLCG ops coordination meeting on 1st: Agenda | Minutes

Monday 7th November

Tuesday 25th October

Monday 3rd October

  • There was a WLCG ops coordination meeting last week: Agenda. (Good to review in the ops meeting).

Monday 26th September

Monday 19th September


Tier-1 - Status Page

Tuesday 13th December A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here

  • The upgrade of Castor to version 2.1.15 is being scheduled to take place in January and has been announced via the GOC DB.
  • On Wednesday (14th) we will carry out rolling firmware updates on a particular batch of servers - which are in use by Atlas, CMS and LHCb.
  • Last Thursday the smaller LHCbUser disk pool was merged into the larger LHCbDst pool. A similar merger is planned for Atlas disk pools which will be done at a time of their convenience.
Storage & Data Management - Agendas/Minutes

Wednesday 07 Dec

  • Good GridPP presence at the CLOUD-SIG workshop at Crick last week. Real Work™ included GridFTP-endpoint-in-the-cloud and Jupyter notebooks. How do you get data into a Jupyter notebook (from the grid)?
  • Opportunity to do more with data transfer between infrastructures.

Wednesday 23 Nov

  • A couple of operational issues; ATLAS data mover triggering lack of checksum support in xroot in Edinburgh DPM

Wednesday 16 Nov

  • Some curious operational issues with failed xroot transfers - need more testing
  • Duncan provided feedback from the JISC data transfer/campus networking workshop

Wednesday 09 Nov

  • Storage related issues from hepsysman?
  • ...

Wednesday 02 Nov

  • Big picture: an attempt to explain where GridPP fits with other things such as "UKT0" and other infrastructures


Tier-2 Evolution - GridPP JIRA

Monday 12 December

  • ALICE VMs in production at Manchester. Other Vac sites invited to install it. (No VOBOX required...)

Tuesday 6 December

  • RCUK Clouds workshop last Tuesday: GridPP/SKA demo. Andrew asked to lead an HTC/Clouds Task Force.
  • VMCondor framework for running HTCondor jobs in Vac/Vcycle compatible VMs: adapted for ATLAS, local batch, and now being tested for ALICE at Manchester using a pool of HTCondor jobs at CERN.
  • Vac and Vcycle resources now in LHCb VOFeed given to SAM/ETF, ready for next stage of testing WLCG SAM probes inside pilots.

Tuesday 22 November

  • Next generation LHCb pilots / VMs deployed at all VM-based sites. Includes multiple parallel payloads support for multiprocessor VMs and new WLCG SAM probes framework, addressing JIRA task GridPP-5
  • Vac 2.0 mixed-sized VMs support in testing, using Super Slots mechanism to create multiple single-processor VMs in groups to avoid breaking up N processor slots for multiprocessor VMs.
  • skatelescope.eu and LHCb demo at RCUK workshop on 29th Nov, showing transparent access to OpenStack resources at DataCentred Ltd and CERN using GridPP/LHCb DIRAC services and DIRAC VMs.


Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06

Monday 14th November

  • Alessandra has written an FAQ to extract numbers from ATLAS and APEL avoiding the SSB.

Monday 26th September

  • A problem with the APEL Pub and Sync tests developed last Tuesday and was resolved on Wednesday. This had a temporary impact on the accounting portal.
Documentation - KeyDocs

Tue 22nd Nov

  • More on Accounting audit tools

The process for ARC, Toque and VAC is now documented here.

https://github.com/gridpp/audit/wiki


Tue 15 Nov

  • Accounting audit tools

GridPP project in github used to host documents and scripts to audit work done accounts independently of APEL. So far, methods exist for ARC CE, and Torque batch system. Method for VAC still rough and being worked out by (e.g.) next week. To get the material:

git clone https://sjones-hep-ph-liv-ac-uk@github.com/gridpp/audit.git

Substituting you own github username. Or go to:

https://github.com/gridpp/audit

For write access, ask Andrew McNab.

  • Changes to CMS resource requirements in Approved VOs

See https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs

Scroll to the Resources table at the bottom and check the new CMS requirements.

Tue 1 Nov

Publishing tutorial updated to use new wording for various measurements.

https://www.gridpp.ac.uk/wiki/Publishing_tutorial#Accounting_transmissions



https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs


General note

See the worst KeyDocs list for documents needing review now and the names of the responsible people.

Interoperation - EGI ops agendas

Monday 7th November

  • There was an EGI Ops meeting today: agenda
  • UMD 3.14.5 released today
    • VOMS 3.5.0, which makes RFC proxies the default for voms-proxy-init
  • UMD 4.3.0 'October' release, release candidate ready, to be released by end of this week, including:
    • ARC, GFAL2, XROOT, Davix, dCache, ARGUS, Gridsite, edg-mkgrid, umd-release for CentOS7
  • please start using UMD4/SL6 or UMD4/CentOS7 instead of UMD3/SL6 & please don't use anymore EMI3
    • (think there may be a campaign around this soon)
  • Downtimes due to the vulnerability CVE-2016-5195: request an A/R recomputation
    • All the resource centres that were affected by the vulnerability CVE-2016-5195 and that declared a downtime between 2016-10-20 16:00 UTC and 2016-10-31 18:00 UTC are invited to request a recomputation of A/R figures for the days in which the downtime was ongoing.
Monitoring - Links MyWLCG

Tuesday 1st December


Tuesday 16th June

  • F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
  • Feedback welcome.


Tuesday 31st March

Monday 7th December

On-duty - Dashboard ROD rota

Monday 5th December

  • Another fairly quiet week. There were a few new tickets, which are mostly now resolved. There was an intermittent SRM alarm at RALPP which sporadically appeared then disappeared; it finally hung around long enough today to raise a ticket.

Monday 21st November

  • EFDA low-availability (egi.eu.lowAvailability-/EFDA-JET@EFDA-JET_Availability) ticket finally removed!

Monday 14th November

  • AM reports: End of two week shift. Various planned and unplanned downtimes. No grid-wide issues.


Rollout Status WLCG Baseline

Tuesday 7th December

  • Raul reports: validation of site BDII on Centos 7 done.

Tuesday 15th September

Tuesday 12th May

  • MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.


References


Security - Incident Procedure Policies Rota

Tuesday 20th December

  • CVE-2016-7117 downgraded from CRITICAL to HIGH by EGI SVG [1]
  • One, non-UK incident advisory from EGI CSIRT affecting one site. Not known to have affected other sites but more details expected after further analysis.

Tuesday 13th December

  • CVE-2016-7117 still waiting for distro. kernel updates
  • EGI Dashboard hint: to display a recent history of state records -
    • Starting from the "Issues" page for a site
    • Select right-hand-upper drop-down “Issues” and select “History”
    • Click the required test in the table shown e.g. ARC-Pakiti-Check
    • Select "Records" from the upper-menu

Tuesday 6th December

  • One user suspension (and subsequent release) in Argus due to an EGI FedCloud incident. Not know to affect UK.
  • CVE-2016-7117 still waiting for distro. kernel updates
  • Next Security Team meeting on the 13th Dec.
  • Certificate has expired on pakiti.egi.eu 5/12/2016 [2]

Monday 21st November

  • The IGTF will release a regular update to the trust anchor repository (1.79) on Monday, Nov 28th 2016.
  • We are still seeing sites pop-up in the dashboard in relation to EGI-SVG-2016-11476.
  • CVE-2016-7117 still waiting for distro. kernel updates


The EGI security dashboard.


Services - PerfSonar production dashboard |PerfSonar development dashboard | GridPP VOMS

- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).

Tuesday 25th October

  • Duncan has recreated the UK perfSONAR mesh. Link here!


Monday 19th September

  • UK eScience CA - certificate issuance problems. Jens reported that on 15th a partial but significant database corruption occurred on the signing system for the CA. Data was restored from (offline) backups but the rebuild was not correctly configured.
  • A large number of site admins and other GridPP supporters appeared to be suspended from the dteam VO last week. “During a planned upgrade operation of VOMS service, a system malfunction occurred. As a result, some users received false notification about membership expiration. We are in contact with the software development team in order to identify the cause.”


Tickets

Tuesday 13th December 2016, 10.15 GMT
22 Open UK tickets this week

AFS TICKETS
I won't list them, but I advise sites with open AFS tickets to on hold them if they don't plan on having them done and dusted before Christmas.

CAN BE CLOSED
124758 (1/11)
This ECDF availability ticket's alarm has "gone green" so it can be closed. Waiting for reply (12/12)

IN NEED OF ACKNOWLEDGMENT:

SUSSEX
125495 (9/12)
A nagios CA rpm version ticket. Assigned (9/12)

MANCHESTER
125497 (9/12)
Another nagios ticket, this time cream job tests seem to be failing. Assigned (9/12)

COULD DO WITH AN UPDATE:

TIER 1
124478 (17/10)
na62 WMS ticket, this could do with a reply to the user - even a report of no progress would be better then silence. In progress (29/11)

OF INTEREST:

TIER 1
125480 (9/12)
A ticket about the Tier 1 CPU publishing with respect to VAPOR, bought about because glue 1.3 and glue 2 were publishing different values. Worth keeping any eye on IMO. In progress (12/12)

REMINDER FOR MYSELF AND JEREMY
122198 (17/6)
I keep forgetting to talk to Jeremy about closing JET in gocdb. Tis the season to be snowed under! In progress (5/12)

If you're jetting off on your seasonal holiday's a little early this year please wrap up your tickets before you go, on holding them until you get back if you can't get them done and dusted. But most importantly, have a Grand Christmas and New Year Break!


Tools - MyEGI Nagios

29th November 2016

LSST monitoring is available through vo-nagios

https://vo-nagios.physics.ox.ac.uk/nagios/cgi-bin/status.cgi?servicegroup=lsst&style=detail

13th September 2016


19th July

Both instances of gridppnagios at Oxford and Lancaster has been decommissioned.

12th July 2016

Central ARGO monitoring service has started from 1st of July. All grid resources are monitored through two Nagios instances

https://argo-mon.egi.eu/nagios/

https://argo-mon2.egi.eu/nagios/

It has same interface as gridppnagios. Alarms from these instances goes to Operational Dashboard

http://argo.egi.eu/ is a web interface which provides availability/reliability figures and site status. It is equivalent of old myegi interface with some additional services.

I am planning to decommission both instances of gridppnagios in coming weeks. I have stopped nagios and httpd on both instances so it will not send tests to grid resources in UK. I will also decommission storage-monit.physics.ox.ac.uk which was only used for storage replication test.

We will keep vo-nagios.physics.ox.ac.uk running until we get a replacement for vo-monitoring.


Monday 13th June

  • Active Nagios instance moved to Lancaster

Tuesday 5th April 2016

Oxford had a scheduled network warning so active nagios instance was moved from Oxford to Lancaster. I am not planning to move it back to Oxford for the time being.


Tuesday 26th Jan 2016

One of the message broker was in downtime for almost three days. Nagios probes picks up a random message broker and failover is not working so a lot of ops jobs hanged for long time. Its a known issue and unlikely to be fixed as SAM Nagios is in its last leg. Monitoring is moving to ARGO and many things are not clear at the moment.

Monday 30th November

  • The SAM/ARGO team has created a document describing Availability reliability calculation in ARGO tool.
VOs - GridPP VOMS VO IDs Approved VO table

Tuesday 19th May

  • There is a current priority for enabling/supporting our joining communities.

Tuesday 5th May

  • We have a number of VOs to be removed. Dedicated follow-up meeting proposed.

Tuesday 28th April

  • For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk and voms03.gridpp.ac.uk have both been updated from 15003 to 15503.

Tuesday 31st March

  • LIGO are in need of additional support for debugging some tests.
  • LSST now enabled on 3 sites. No 'own' CVMFS yet.
Site Updates

Tuesday 23rd February

  • For January:

ALICE: All okay.

RHUL 89%:89% Lancaster 0%:0%

RALPP: 80%::80%

RALPP: 77%:77%

  • Site responses:
    • RHUL: The largest problem was related to the SRM. The DPM version was upgraded and it took several weeks to get it working again (13 Jan onwards). Several short-lived occurrences of running out of space on the SRM for non-ATLAS VOs. For around 3 days (15-17 Jan) the site suffered from a DNS configuration error by their site network manager which removed their SRM from the DNS, causing external connections such as tests and transfers to fail. For one day (25 Jan) the site network was down for upgrade to the 10Gb link to JANET. Some unexpected problems occurred extending the interruption from an hour to a day. The link has been successfully commissioned.
    • Lancaster: The ASAP metric for Lancaster for January is 97.5 %. There is a particular problem with ATLAS SAM tests which doesn’t affect the site activity in production and analysis and this relates to the path name being too long. A re-calculation has been performed.
    • RALPP: Both CMS and LHCb low figures are due to specific CMS jobs overloading the site SRM head node. The jobs should have stopped now.



Meeting Summaries
Project Management Board - MembersMinutes Quarterly Reports

Empty

GridPP ops meeting - Agendas Actions Core Tasks

Empty


RAL Tier-1 Experiment Liaison Meeting (Wednesday 13:30) Agenda Meeting takes place on Vidyo.

Highlights from this meeting are now included in the Tier1 report farther up this page.

WLCG Grid Deployment Board - Agendas MB agendas

Empty



NGI UK - Homepage CA

Empty

Events
UK ATLAS - Shifter view News & Links

Atlas S&C week 2-6 Feb 2015

Production

• Prodsys-2 in production since Dec 1st

• Deployment has not been transparent , many issued has been solved, the grid is filled again

• MC15 is expected to start soon, waiting for physics validations, evgen testing is underway and close to finalised.. Simulation expected to be broadly similar to MC14, no blockers expected.

Rucio

• Rucio in production since Dec 1st and is ready for LHC RUN-2. Some fields need improvements, including transfer and deletion agents, documentation and monitoring.

Rucio dumps available.

Dark data cleaning

files declaration . Only Only DDM ops can issue lost files declaration for now, cloud support needs to fill a ticket.

• Webdav panda functional tests with Hammercloud are ongoing

Monitoring

Main page

DDM Accounting

space

Deletion

ASAP

• ASAP (ATLAS Site Availability Performance) in place. Every 3 months the T2s sites performing BELOW 80% are reported to the International Computing Board.


UK CMS

Empty

UK LHCb

Empty

UK OTHER
  • N/A
To note

  • N/A