General updates
|
Monday 13th June
Monday 6th June
Monday 30th May
- Discussion in WLCG regarding the use of information system (vs GOCDB)| Glasgow experience. Impacts on other VOs?
- Tier-2 Hardware Survey. The target date was the end of May.
- Sam: edg-mkgridmap, voms and RHEL/Centos 6.8. It seems there is a solution with edg-mkgridmap-4.0.3.
- "Digital Infrastructures for Research 2016" (DI4R) conference: The DI4R 2016 will be held in Kraków on 28-30 September 2016. The conference will be hosted by ACC Cyfronet AGH and organised jointly by EGI, EUDAT, GÉANT, OpenAIRE and RDA Europe.
- Pre-GDB - IPv6 workshop - Tuesday 7th June 2016.
- Andrew L: HTCondor Machine/Job Features testing?.
- 2nd Developers@CERN Forum - Python at CERN. 30th/31st May. Vidyo available.
- OMB meeting last Thursday 24th. Topics:
- Central monitoring (2 instances since March. Switchover planned 1st July.)
- EGI Engage update
- Indigo-DataCloud
- Monitoring of cloud services
- Security update
|
WLCG Operations Coordination - AgendasWiki Page
|
Monday 7th June
- There was a WLCG ops coordination meeting last Thursday: Agenda | Minutes
- some of May's events:
- The decision to create a WLCG Accounting Task Force was approved at the May 24th MB.
- PIC published on May 18th the SIR on the T10KD problems they were experiencing since last December.
- Web info around certificates was updated to reflect changes around the OSG PKI.
- GGUS Release on June 1st. Release notes available.
Tuesday 24th May
- There was a middleware readiness meeting on 18th May. Agenda | Minutes
- The next WLCG ops coordination meeting will be on 2nd June (focus monitoring consolidation).
Monday 1st May
- There was a WLCG ops coordination meeting last Thursday. Agenda | Minutes.
- SL5 decommissioning (EGI, April 30, 2016). SL5 'ops' service probes will get CRITICAL. The whole retirement process is tracked here.
- New Traceability and isolation working group will have a dedicated session in May pre-GDB.
- New Task Force on Accounting review is under preparation to start addressing accounting issues.
- A detailed review of the Networking and Transfers WG was done. This includes a status report, ongoing actions and future R&D projects. More details in the agenda slides.
|
Tier-1 - Status Page
|
Tuesday 14th June
A reminder that there is a weekly Tier-1 experiment liaison meeting. Notes from the last meeting here
- We still have ongoing problems with the stability of the tape library control software. This crashes frequently.
- "GEN Scratch" storage in Castor will be decommissioned. This has been announced via an EGI broadcast. Write Access to this area was disabled last week - ahead of full withdrawal in a few weeks time.
- One of our three WMS systems (lcgwms06) is being decommissioned. It was stopped from receiving new work last week (on the 1st June).
- Reminder: HEP SYSMAN at RAL 21-23 June. The first day being a Security training day.
|
Storage & Data Management - Agendas/Minutes
|
Wednesday 15 June
- Are we any closer to writing up (or down) what a future T2 will look like? Five years from now?
Wednesday 08 June
- An audience with Brian Bockelman!
- Special thanks to Alastair Dewhurst for "lending" us Brian (during the visit of the latter to the former) and to Sam for taking additional notes.
Wednesday 01 June
- LSST experiences with using GridPP - what is the minimal effort to get started? Are the data features useful/known/used?
- Lots of interesting submissions to CHEP
- IPv6 - time to showcase our work? Can we still show interesting IPv6 work in a post-ewanian infrastructure?
Wednesday 18 May
- EGI data hub; see home page for the presentation download.
Wednesday 04 May
|
Tier-2 Evolution - GridPP JIRA
|
Mon 6 Jun
- GridPP VM vs DIRAC version mismatch found and worked-around.
Friday 29 Apr
Tuesday 5 Apr
- Vac 00.22 release (01.00 pre-release) ready. Includes Squid-on-hypervisor config in Puppet module.
- Aim to do Vac 01.00 release immediately after Pitlochry.
Tuesday 22 Mar
- GridPP DIRAC SAM tests now have gridpp and vo.northgrid.ac.uk pages
- Some pheno jobs have been run on VAC.Manchester.uk
- ATLAS cloud init VMs now running at Liverpool too
Tuesday 15 Mar
- Vac 00.21 deployed on all/some machines at all 5 production Vac sites
- Oxford Vac-in-a-Box set up in production
- ATLAS pilot factory at CERN configured for our ATLAS cloud init VMs
- ATLAS cloud init VMs running production jobs at Manchester and Oxford; being enabled at other sites
- vo.northgrid.ac.uk DIRAC jobs running in GridPP DIRAC VMs: should work for any GridPP DIRAC VO, since a parameter to the VM config.
- Multipayload LHCb pilot scripts tested in VMs: same pilot scripts can be used on VM or batch sites in multiprocessor slots.
|
Accounting - UK Grid Metrics HEPSPEC06 Atlas Dashboard HS06
|
Tuesday 14th June
- GridPP accounting switched to use the 'new' EGI accounting portal.
- APEL delays from UK sites look about 'normal' (i.e. delays are typical).
Tuesday 9th February
- 4th Feb: The data from the APEL summariser that was fixed yesterday has now propagated through the data pipeline and the Accounting Portal views and the Sync and Pub tests are all working again.
- Sheffield is slightly behind other sites (but looks normal) and so is QMUL.
Tuesday 24th November
- Slight delay for Sheffield.
Tuesday 3rd November
- APEL delay (normal state) Lancaster and Sheffield.
Tuesday 20th October
The WLCG MB decided to create a Benchmarking Task force led by Helge Meinhard see talk
|
Documentation - KeyDocs
|
Friday 27th May
- New Approved VOs published; icecube and fermilab
https://www.gridpp.ac.uk/wiki/GridPP_approved_VOs
Tuesday 17th May
- TW implementing use-cases summary matrix according to these:
- CERN@school - LUCID (full workflow with DIRAC)
- GalDyn (full workflow with DIRAC)
- PRaVDA (full workflow with DIRAC)
- LSST (full workflow with Ganga + DIRAC)
- EUCLID (full workflow at the RAL T1)
- DiRAC (data storage/transfer)
- SNO+ (data transfer/networking)
Wednesday 4th May
Introduction added to explain _why_ CGROUPS are desired when using ARC/Condor.
https://www.gridpp.ac.uk/wiki/Enable_Cgroups_in_HTCondor
Tuesday 26th April
Statement on recent history of LSST VOMS records. To be discussed at Ops Meeting.
- Feb 16: 3 x VOMS servers, port 1503, names: voms.fnal.gov (DigiCert-Grid, admin), voms1.fnal.gov (DigiCert-Grid, not admin), voms2.fnal.gov (opensciencegrid , admin).
- Apr 18: 1 x VOMS server. port 15003, names: voms.fnal.gov (opensciencegrid, admin). Caused by a hitch with security that caused the omission of some data. GGUS: https://ggus.eu/?mode=ticket_info&ticket_id=120925. Fixed.
- Apr 21: 3 x VOMS servers, port 15003, names: voms.fnal.gov (opensciencegrid, admin), voms1.fnal.gov (opensciencegrid, not admin), voms2.fnal.gov opensciencegrid admin
So, similar to how it was in feb, but DNs (and CA_DNs) of 2 certs changed. But other things to note:
Please discuss.
General note
See the worst KeyDocs list for documents needing review now and the names of the responsible people.
|
Interoperation - EGI ops agendas
|
Monday 13th June
Monday 9th May
- There was an EGI ops meeting today.
- SL5 status was reviewed. Services remaining: WMS/LB being decommissioned at Glasgow; Lanacaster BDII scheduled for upgrade; Oxford SAM/VO Nagios. This is only on SL5 and plans across all NGIs to move to a central ARGO service are in place; RAL T1 Castor SRM systems. SRM upgrade waiting on Castor upgrade.
Monday 18th April
|
Monitoring - Links MyWLCG
|
Tuesday 1st December
Tuesday 16th June
- F Melaccio & D Crooks decided to add a FAQs section devoted to common monitoring issues under the monitoring page.
- Feedback welcome.
Tuesday 31st March
Monday 7th December
|
On-duty - Dashboard ROD rota
|
Monday 13th June
- Quiet week.
- Still problems at Brunel due to there being two bdiis.
Tuesday 31st May
- EFDA Jet : EFDA admin's certificate has expired. He has applied for new certificate.
- Brunel: Brunel is running two site bdii's and it is confusing EGI status dashboard. A ticket has been opened.
- RHUL: It had some network issues and it seems that it hasn't been solved yet.
- Liverpool, Sussex and ECDF has an availability ticket
Tuesday 15th March
- Normal week with few alarms which were fixed in time. Birmingham has a low availability ticket. ECDF has ticket on hold as it test ARC CE and putting this CE in downtime might effect proper job test from ATLAS.
|
Rollout Status WLCG Baseline
|
Tuesday 7th December
- Raul reports: validation of site BDII on Centos 7 done.
Tuesday 15th September
Tuesday 12th May
- MW Readiness WG meeting Wed May 6th at 4pm. Attended by Raul, Matt, Sam and Jeremy.
References
|
Security - Incident Procedure Policies Rota
|
Tuesday 14th June
- Vulnerability advisories -
- I've finished checking ARC and CREAM CE's for credential suspension (aka ARGUS banning) for resources supporting the gridpp VO. If I haven't contacted you then your site was correctly configured. Thanks for your cooperation. Now on to the SE's ...... - Ian Neilson
Tuesday 7th June
- Reminder - HEP SYSMAN Security training Tues Jun 21st
- EGI SVG advisory for 'critical' risk vulnerability in one product
- EGI SVG advisory for 'high' risk vulnerability in Nova API for OpenStack
Tuesday 31st May
- 'Low' Risk Vulnerability concerning Panda Pilot factory payload verification
- 'Low' risk vulnerability concerning DIRAC Pilot factory payload verification
- Arbitrary file overwrite in one product.
- Configuration issue in one product.
- Reminder - HEP SYSMAN Security training Tues Jun 21st
Tuesday 24th May
The EGI security dashboard.
|
|
Services - PerfSonar dashboard | GridPP VOMS
|
- This includes notifying of (inter)national services that will have an outage in the coming weeks or will be impacted by work elsewhere. (Cross-check the Tier-1 update).
Tuesday 10th May
- Next LHCOPN and LHCONE meeting: Helsinki (FI) 19-20 of September 2016: Agenda.
Tuesday 22nd March
Tuesday 8th December
- Given the recent network issues and role of GridPP DIRAC, there are plans to have a slave DNS for gridpp.ac.uk at Imperial and hopefully the T1 too. Andrew will seek an update to the whois records and name servers once the other host sites are confirmed.
- Looking at the network problems this week will be of interest. Duncan supplied this link and Ewan the one for the dual stack instance.
|
Tickets
|
Monday 13th June 2016, 16.00 BST
29 Open UK Tickets this week (down from 35 last week).
Not much exciting going on on the ticket front, and I have to send my apologies for today's meeting.
Here's the link to the UK tickets: http://tinyurl.com/nwgrnys
There are some cries for help on the ticket front, Kashif has already asked for help with the Oxford httpd ticket 122069, and a forewarning that Jeremy M will be seeking guidance with the Sussex issues at next week's HEPSYSMAN (118289 & 121797).
|
Tools - MyEGI Nagios
|
Monday 13th June
- Active Nagios instance moved to Lancaster
Tuesday 5th April 2016
Oxford had a scheduled network warning so active nagios instance was moved from Oxford to Lancaster. I am not planning to move it back to Oxford for the time being.
Tuesday 26th Jan 2016
One of the message broker was in downtime for almost three days. Nagios probes picks up a random message broker and failover is not working so a lot of ops jobs hanged for long time. Its a known issue and unlikely to be fixed as SAM Nagios is in its last leg. Monitoring is moving to ARGO and many things are not clear at the moment.
Monday 30th November
- The SAM/ARGO team has created a document describing Availability reliability calculation in ARGO tool.
|
VOs - GridPP VOMS VO IDs Approved VO table
|
Tuesday 19th May
- There is a current priority for enabling/supporting our joining communities.
Tuesday 5th May
- We have a number of VOs to be removed. Dedicated follow-up meeting proposed.
Tuesday 28th April
- For SNOPLUS.SNOLAB.CA, the port numbers for voms02.gridpp.ac.uk and voms03.gridpp.ac.uk have both been updated from 15003 to 15503.
Tuesday 31st March
- LIGO are in need of additional support for debugging some tests.
- LSST now enabled on 3 sites. No 'own' CVMFS yet.
|
Site Updates
|
Tuesday 23rd February
ALICE:
All okay.
RHUL 89%:89%
Lancaster 0%:0%
RALPP: 80%::80%
RALPP: 77%:77%
- RHUL: The largest problem was related to the SRM. The DPM version was upgraded and it took several weeks to get it working again (13 Jan onwards). Several short-lived occurrences of running out of space on the SRM for non-ATLAS VOs. For around 3 days (15-17 Jan) the site suffered from a DNS configuration error by their site network manager which removed their SRM from the DNS, causing external connections such as tests and transfers to fail. For one day (25 Jan) the site network was down for upgrade to the 10Gb link to JANET. Some unexpected problems occurred extending the interruption from an hour to a day. The link has been successfully commissioned.
- Lancaster: The ASAP metric for Lancaster for January is 97.5 %. There is a particular problem with ATLAS SAM tests which doesn’t affect the site activity in production and analysis and this relates to the path name being too long. A re-calculation has been performed.
- RALPP: Both CMS and LHCb low figures are due to specific CMS jobs overloading the site SRM head node. The jobs should have stopped now.
|
|